Nairaland Forum / Nairaland / General / Properties / Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 (15293 Views)
Construction Of Mini Bakery/ Office Space By Rotech77 / Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 / The Finishing Of Osun State Edifice By Rotech77 (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply) (Go Down)
Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:22pm On Apr 01, 2021 |
Officially Opened We gives thanks to Almighty God for giving us this project to handle. We also thank the, client, Nl members, our esteemed clients, viewers, etc. Project brief We are to design and build - A contemporary eatery with executive pent house -6units of flats.(2 bedrooms flat 4 units and mini flats 2units) Both from design stage to finishing stage.(hand over of key) Contractor ;Arbor contractor Ltd (Rotech77) Client; NL by associate Location ;Center of excellence Duration;25 weeks Contact : 08066619493 call/whatzap
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:28pm On Apr 01, 2021 |
What to expect from us here - cost of materials - cost of project stages - some construction idea - question and answer Etc Week1-2 -Clearing of the site - site hoarding - bore hole drilling - setting out of the building plan 1 Like
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:33pm On Apr 01, 2021 |
Cost of drilling bore hole 200k ..... 150ft Cost of setting out materials =45,000 settlement of street guys/ Omonile 100,000 Excavation of the two building fdn 180k Cont” Loading.., |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:25am On Apr 02, 2021 |
Excavation in progress |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 11:42am On Apr 02, 2021 |
We speak less We believed in action |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:32pm On Apr 02, 2021 |
Excavation in progress Arbo contractor Ltd 1 Share
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:10pm On Apr 02, 2021 |
We have 2 weeks for excavation of trenches and columns pit of the two building. More update coming soon |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 4:50am On Apr 03, 2021 |
Men at work
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 10:20am On Apr 03, 2021 |
following |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:24am On Apr 03, 2021 |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by Henix(m): 2:53pm On Apr 03, 2021 |
Kudos! |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 4:21pm On Apr 03, 2021 |
Henix: Thanks so much sir. As I said we believed much in action “Less talk more action” While excavation of the eatery is going on we are setting out the residential building plan on one side to meet up with our work program. Eatery foundation almost done, we are shifting to residential building foundation by Monday. Thanks you all your time here. Arbo contractor Ltd (Rotech)
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 4:57pm On Apr 03, 2021 |
Could you believed that, the plant we used here to demolished the existing building and excavation of top soil cost only N90k When we contacted direct laborers to see how to save cost we realized that by using them( laborers) it will slow the time of work ( like 1 weeks) and the cost is: 3500 *10( workers) a day=35,000 35,000*7Days=245,000 (Demolition, packing, top soil remover) Boom we go for the plant ( bulldozer) 90k 245,000-90,000=155,000 We save N155,000 for the client.( we just add only 25k The money saved here now used for the whole 2 building foundation excavation N150,000 3 Likes
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by mufutau55(m): 6:28pm On Apr 03, 2021 |
rotecch77: My Oga on duty o. Very good work. But dont let @Egunmogaji2 see that your She Engineer o. Keep up the good work Sir. Hajji M. 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 6:36pm On Apr 03, 2021 |
mufutau55: I’ve not fully forgotten kolashangone for successfully shielding her engineer from us back then |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by mufutau55(m): 6:43pm On Apr 03, 2021 |
EgunMogaji2: Poor Kolashangone... that Engineer probably has five kids by now. I mentioned it to him few days back. Hajji M. 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:58pm On Apr 03, 2021 |
mufutau55: Baba Agbalagba sir, Babs. Egunmogaji Don retired from woman stuff..lolz. Agba tii de 2 Likes |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:58pm On Apr 03, 2021 |
EgunMogaji2: Lolz 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 7:30pm On Apr 03, 2021 |
rotecch77: Emi o dagba malabe, egungun eran ni kan ni mi ole san |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:58pm On Apr 03, 2021 |
EgunMogaji2: Haaa, baba agbalagba , nothings do you sir, may you live long. 3 Likes |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:30am On Apr 04, 2021 |
Today is rest day for workers, Tomorrow work continue More pics update will be uploaded here, watch out! 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by bayo2018: 12:58pm On Apr 04, 2021 |
rotecch77: How many plot of land is that and what’s the dimension Bossun 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 3:49pm On Apr 04, 2021 |
bayo2018: The land measured about 950 meters square (1 and 1/2 plot of land ) 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:31pm On Apr 04, 2021 |
Warming up for tomorrow work. Watch out! 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 7:43pm On Apr 04, 2021 |
rotecch77: My brother I'm watching. I'm waiting to sell my personal house before I start the new one (no personal interest in owning two private homes). So until then I'm living through you guys doing duplex builds. Also learning and taking notes. Thanks for sharing. |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:40am On Apr 05, 2021 |
EgunMogaji2: I like your idea of having only one personal house in same location ,why do someone need 2 personal house in same city, it’s better to have one and many commercial building 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 11:30am On Apr 05, 2021 |
CONTEMPORARY DESIGN Unlike modern design, contemporary design doesn't refer to a specific period of time—it's constantly evolving to reflect the popular styles of present day design. It borrows qualities from modernism, minimalism, Art Deco, and other global styles, without hyper-focusing on any one in particular. Though contemporary design is, by nature, fairly ambiguous, there are a few qualities that help define the contemporary style. Neutral palettes, stark minimalism, clean lines, and organic silhouettes are some of the prominent characteristics. You can expect to see materials including nickel, steel, and chrome, combined with natural textures like hemp or jute. Culled from internet |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 12:25pm On Apr 05, 2021 |
Second building trench excavation is in progress. We have about 2000 blocks already on ground, And more block production is going on.
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:24pm On Apr 05, 2021 |
Still on 1st week of the project and we have covered 80pec of work programmed for 2 weeks “Guys are not smiling here” We are targeting 22weeks to finished up the job, although we agreed for 25weeks to deliver the job. |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:52pm On Apr 06, 2021 |
Introducing burning rod here into the trench -also the blinding and short columns for the eatery section done.
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 8:38am On Apr 07, 2021 |
As I said we believed in action “More action less talk” Foundation block setting will commence today For the eatery section. |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 8:54am On Apr 07, 2021 |
rotecch77: Please what’s a burning rod? Can I do a site visit? I want to see something. Walahi my intentions are pure. |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)
The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" / A Nairalander's Ceiling Designs / Is It Advisable To Buy Land At Omagwa In Port Harcourt?
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26 |