Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,206,754 members, 7,996,685 topics. Date: Thursday, 07 November 2024 at 01:47 PM |
Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4809369 Views)
Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)
(1) (2) (3) ... (2363) (2364) (2365) (2366) (2367) (2368) (2369) ... (3775) (Reply) (Go Down)
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sonnie10: 7:35pm On Aug 07, 2021 |
spyder880:I apologize. The danger of a second hand story is that it is always modified. One of the reasons I love your projects, they are always authentic. 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by somehow: 9:05pm On Aug 07, 2021 |
RockOfAgesAlumi: Thanks for the prompt delivery. 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 9:08pm On Aug 07, 2021 |
Contact us today for your Electrical Mechanical Design and Installation Check out our thread Distribution boards https://www.nairaland.com/2668061/abb-distibution-board-schneider-distribution/6 MEP installation https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/25 Cables https://www.nairaland.com/2326721/nigerchin-kabelmetal-coleman-cables/23 |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by diordaves(m): 9:51pm On Aug 07, 2021 |
TEQ365VENTURES: Why are you at odds not trusting your engineer over your bricklayer? Is it because your engineer is not an engineer? Your structural drawings didn't call for one. From the photo, I think you need to backfill sensibly and do a German floor and you should be fine. I'm not a structural engineer. Not even close. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by shedy03(m): 9:54pm On Aug 07, 2021 |
n3xt:What guage is the roofing sheet, 0.45 or 0.55? Does guage has effect on weather a roof will leak or otherwise? |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by shedy03(m): 9:55pm On Aug 07, 2021 |
n3xt:So, it does matter if the guage is 0.45 or 0.55? Am working on a 3bedroom bungalow. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by TEQ365VENTURES(m): 10:03pm On Aug 07, 2021 |
diordaves:Your reply is so much appreciated. Of course I trust the engineer just making sure I’m not undervaluing the bricklayer’s thought. Thanks once again! 1 Like 1 Share |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by RockOfAgesAlumi(m): 10:05pm On Aug 07, 2021 |
somehow:You are welcome sir Thanks |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 11:47pm On Aug 07, 2021 |
shedy03: This is 0.55
I can confidently tell you a good installation will give you 100% peace of mind. I used 0.35 gauge on two of my personal build over 9 years ago. We’ve not had to do any maintenance on the roof since it was installed. Though, we may be quick to say 0.35 gauge a decade ago is the same as 0.50 gauge now. The truth remains there are folks who did their install about the same as mine that have had to replace, repair and reinstall their roofs. I know someone who replaced his roof almost 3 times in 4 years. It’s actually an installation issue not really the gauge. ______ Though a lower gauge will most likely have nail point leak issue faster than higher gauge but that doesn’t make it more vulnerable. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 11:48pm On Aug 07, 2021 |
shedy03: Once again, a good roof design matters more than the cost of materials used. If you like use 1mm gauge, if your design is bad, the roof will leak! ______ Just last week, we worked on an industrial gauge roof in Ibadan. It was badly installed and badly repaired using the regular flashband We had to pull and did reconstruction of the woodwork to correct the problem. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 11:55pm On Aug 07, 2021 |
The same applies to concrete roof. My concrete roof hasn’t pose a single problem over 10 years of its installation. And we never had to apply any treatment on it. No felt. No waterproofing solution. Just a gentle slope to direct the water off the slab. Simple as ABC! _______ A good design transcend time. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by money121(m): 6:44am On Aug 08, 2021 |
Good morning
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by megacontrol(m): 7:09am On Aug 08, 2021 |
Happy Sunday people, Who sells ECO bricks here? I need a light grey-ish colour. Pls drop samples of what you have with prices, if possible. thanks |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by shedy03(m): 7:45am On Aug 08, 2021 |
n3xt:Thank you |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by shedy03(m): 7:47am On Aug 08, 2021 |
n3xt:This is helpful, thank you. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:42am On Aug 08, 2021 |
Good morning and happy Sunday 2 Likes
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dapotemi: 9:05am On Aug 08, 2021 |
n3xt: Can you recommend someone that can do a flat roof for me.. Someone that will do a good job. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 9:16am On Aug 08, 2021 |
dapotemi: Have you done your woodwork? I can give 100% money back guarantee on his installs. Ask @Thomaths for the quality of his work. When it’s clean, neat and solid, I give it to him. No matter the complexity of the design, he’ll surely deliver. We’ve been together since 2009. Please note, he’s a man extremely busy type. If you’re in a hurry, we have the fast and furious guys too ________ Pic: Roof with double attic window done in 2013 or 14 for a nairalander. If it’s leaking I know I’ll have been called 4 Likes
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dapotemi: 9:39am On Aug 08, 2021 |
n3xt: I have not done woodwork.... Done with lintel and leveling.. Am not in a hurry... Location is mowe |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 10:00am On Aug 08, 2021 |
dapotemi: Perfect! Even if he’s not going to handle your woodwork, he’d have a look at your design and work with your carpenters to do exactly what’ll give a perfect install. I’ve shared his contact here many times. +2348062444363 Nnamdi McBasil Let him know you’re from Bosun. He’d give your project a preferential treatment. Currently in the East now. _________ Once again if you’re in a rush, don’t bother to contact him because he’s in high demand. But if he makes his way to your site, your job will be completed within 3 days max to your utmost satisfaction. 3 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by EgunMogaji2: 12:24pm On Aug 08, 2021 |
Who's our plug for great outdoor flooring? Thanks. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 12:28pm On Aug 08, 2021 |
Is it right to ask your client to send you transport fare if the job is outside your state? A client called me to come and check a job in Edo state. I wanted to know the situation of the job by asking her if its just to measure or start immediately. she said she will start as soon as we conclude, so I sent her some designs and the price which she accepted. she asked when am coming and I told her 2days time which she said if I can't come the next day I should forget the job. My wife just put to bed after all the spending I have no money left which am praying to go to bring work, I was happy when she said that. The last question I asked got her annoyed, when I asked her if I should come with my tools and my boys, she said is there anyway I will work without bringing them that if she is not ready she won't call me I called my boys to get ready for the next day, but due to not having much cash I ran around to get 5k from someone that when I get there I will send them money to come, I got there in the evening. i kept calling her severally and her number wasn't going even before I left, she pick the call around 5pm when I told her am there already, that am on my way to the site, she changed everything that I didn't call her before coming so I'm a scam. I couldn't believe it, I summon courage that I should get to the site first at least I will sleep at the site till the next day. I only have 100naira left when the bike man dropped me funny enough is that nothing like site around the location I started calling her she blocked my line from call and WhatsApp. I went through hell that day but thank God I survived it. 1 Like 1 Share |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 12:31pm On Aug 08, 2021 |
This is our conversation before I make the move
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 12:32pm On Aug 08, 2021 |
.
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by EgunMogaji2: 12:47pm On Aug 08, 2021 |
A repeat of what I’ve said on here many times over the years. Some much to the chagrin of my “friends”. 1) Don’t rely on customers money to get a job done. We’ll never agree on this I know. 2) You don’t have to accept all jobs that comes across your desk. Interview clients and use your best judgment if it’s a good fit. Example: someone called me from Abia or Asaba and wants to do pay on delivery on a vehicle I’m selling. It’s against my company policy so I respectfully declined. It’s simple sturvz. 3) Don’t take on jobs that you can’t satisfactorily complete. Either because of skill, experience or bandwidth. It’s okay to admit strength. To close. On this very thread, artisans have been lured out of state and robbed by robbers pretending to be prospective home builders. Hope yah all having a wonderful weekend. 6 Likes 1 Share |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by igwedehxy: 12:54pm On Aug 08, 2021 |
Great builders in the house. Pls what is the labour cost for a 3blocks of miniflat and 4shops. It includes 1. Pegging 2. Digging 3. Blinding 4block setting up to 4 coaches Your response will be much appreciated. My bricklayer is charging 240k. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 1:07pm On Aug 08, 2021 |
cash1115: Yes please It is called mobilization fee. mobilization fee especially on a construction project is the payment you require from the customer at the time you begin| about to begin the project, this fee will cater for preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the project site, buildings of other facilities necessary for work on the project, and for all other work and operations which must be performed or cost incurred prior to beginning work on the various items on the project site. Without this, especially on large scale project, you might be starting the project on a negative cash flow instead of positive. A negative cash flow becomes a drain sort of that will increase the chance that you will need to borrow money. Also you do also be using funds necessary for the growth of your company for the project. Sorry for that experience 6 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by diordaves(m): 1:14pm On Aug 08, 2021 |
Charisdesigns: This is very good advice. Any client who argues with mobilizing a contractor/installer na bad market. Move on. 3 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 1:14pm On Aug 08, 2021 |
cash1115: Tragedy! You suppose to request for drawings before you embark on such journey. Inspection to site these days is very risky. Contractors have to be very careful 6 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by diordaves(m): 2:01pm On Aug 08, 2021 |
cash1115: There are clients that are bad market. This you should know. So to filter out bad market, next time these are processes you should carry out before moving to site: #1. If the client is from Nairaland, look up for how long they've been on Nairaland. If they've been on Nairaland for a good length of time, take some comfort in that. Good information about their personality will be here on Nairaland by their posts and the forums they frequently visit. Be wary of those who register today, today to contact you for work. Just be wary. It doesn't mean this is not possible. Just be wary because you don't know jack about them. ALWAYS research your client upfront before accepting any job. Ask them for their name. I will come to 'name' again in point three. #2. Be attentive to the way they address you or talk to you in messages. Be wary if they are unduly and unnecessarily harsh in their communication to you. As if they are doing you a favour. It is not a favour. It is a working relationship. Yes, you are soliciting for work, but you have a right to be addressed with some respect and kindness. All that ORDER to come to site or forget the job is not necessary. It is a tell-tale sign of a tortuous job and a potentially difficult client going forward. And there are difficult clients out there. I speak as a client. #3. ALWAYS ask for a mobilization fee BEFORE moving to site. This is standard and good practice. Any client that argues with this na bad market. Move on. I have said previously in researching the client you should ask for their name. If you ask for a mobilization fee and they agreed, make sure payment is by bank transfer and that the payment account details match with the name the client told you. If the bank details don't match for some reason (maybe the client is abroad and they don't have a Nigerian bank account), ask more questions about who made the payment and ask to communicate with whoever made the payment. Your client should KNOW you in true colour and same as you. Don't be desperate to please to land a job. On the flip side, if a client asked you to come to a site that is so far away for investigation or consultation with a potential view of awarding you the job, ask for a reasonable non-refundable fee in lieu of the cost of visiting the site and tell the client that this fee is non-refundable if you do not get the job eventually but if you got the job, this fee is included in the final fee. 13 Likes 1 Share |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 2:25pm On Aug 08, 2021 |
cash1115:not to pile on the blame but the client is supposed to fund your transport to the site. It can be deducted later on. It's one thing to risk meeting a total stranger. Using your own money to meet him knowing fully well you might not return is another thing altogether. If the client thinks you're a fraud for mobilization, you can see the client as someone with trust issues and shouldn't be trusted 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 2:34pm On Aug 08, 2021 |
EgunMogaji2: i nearly got kidnapped about 3 years ago around festac here in Lagos.... my take on this is.. if the project is within my vicinity and I know that I am not in danger i wont mind driving down there for me to check and all... but if you are far off we can deal with drawings and agree on something. have done this many time... last 3 weeks a client bought two way flight ticket for me to come to abuja and see a job... which didnt work out by the way cause the house has already been plastered.... some client can be wicked in their own way. from the conversation it show that this particular client is a troublesome person he could have said no immediately... |
(1) (2) (3) ... (2363) (2364) (2365) (2366) (2367) (2368) (2369) ... (3775) (Reply)
Viewing this topic: DFAMEGUY11S(m), Jeff68, bolseas(f) and 3 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 79 |