Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:04am On Oct 14, 2021 |
Curing process of this decking, we will start working on the first floor walls soon........ 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:52pm On Oct 14, 2021 |
KIDfurniture: What we do is to bring out all pipes that needs to get to the soakaway system, then we make a chamber where all the pipes converge, the whole waste then travels down to the soakaway system. Ensure you have good gradient, gravity will do the rest. 6 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by KIDfurniture(m): 6:18pm On Oct 14, 2021 |
Master , thanks for ur quick response. Master did you link the septic and soak away internally with any 4” pipe. You know the old school way. I want to know if you use that method since u mentioned, link both in case the septic gets filled. Is there any pipe btw the 2 internally ? spyder880: |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:39pm On Oct 14, 2021 |
KIDfurniture: Yes there is usually a link between the two tanks. A 4 inch pipe, or two different 4 inch pipes is always used to connect the two pipes around the top of the separating wall. 5 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:48pm On Oct 16, 2021 |
Still curing, we will start work here by next week............. 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by sauceEEP(m): 11:07pm On Oct 16, 2021 |
spyder880:What is the size of the pipe that goes directly into the soak away? |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:25am On Oct 17, 2021 |
sauceEEP: Usually, we use 4" pipes. But if the flats are more than 6 using one tank, it might be better to use 6" pipes as the last pipe going into the soakaway system. 4 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by sauceEEP(m): 6:41am On Oct 17, 2021 |
spyder880:My plumber is suggesting i use 6" pipe for my project which is my residential house. His reason is that nothing would ever block the pipe. What is your take on that, any disadvantages of using 6"? |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 6:47am On Oct 17, 2021 |
sauceEEP: Apart from cost, there is no disadvantage to using the 6" pipes. But using it on a single apartment seems like an overkill to me. Except for 1 house in about 45 buildings, I have been using only the 4" pipes in every house and i haven't been called back to service a blockage ever. I have a house that has 8 flats in it, 4" pipes has been serving this whole house since 2015 till date, the soakaway hasn't been evacuated since then, and the property is always full of tenants. But you can go ahead and do the 6", every house and every terrain is different. 3 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by sauceEEP(m): 6:54am On Oct 17, 2021 |
spyder880:Thanks for your expert opinion, also between nija and blue pipe which one is the best in terms of durability? |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:27am On Oct 17, 2021 |
sauceEEP: I always use Niger pipes. 4 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 3:45pm On Oct 20, 2021 |
We're ready to restart this building from the upper floor. Receiving a supply of blocks this morning........ 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 3:47pm On Oct 20, 2021 |
Taking blocks upstairs in readiness to forming the walls....... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 3:52pm On Oct 20, 2021 |
Cement, electrical items arrives........ 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:30pm On Oct 20, 2021 |
The front....... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 6:06am On Oct 22, 2021 |
Work on the first floor of this house has reached advanced stages. The walls are almost on the lintel levels of 10 block courses. More pictures later today. 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 6:24am On Oct 24, 2021 |
Preparing to start work yesterday morning, as more blocks arrive for our use here............ 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:15am On Oct 24, 2021 |
The front....... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 11:09am On Oct 24, 2021 |
Walls as seen internally....... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 11:14am On Oct 24, 2021 |
More 1 Like 1 Share
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Evan65: 5:53am On Oct 25, 2021 |
I will love to be a developer and build amazing structures as you do. Please can you advice on how to get started? |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:52am On Oct 28, 2021 |
Evan65: Good morning Sir, which course did you study in school and what is your work experience like? I think it has some relevance to what we do. 3 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:53am On Oct 28, 2021 |
Our walls here has gotten to the lintel level after 10 courses of blocks. 3 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:19am On Oct 28, 2021 |
Our cantilevered projection in this house......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:23am On Oct 28, 2021 |
Walls, as seen from upstairs........ 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:28am On Oct 28, 2021 |
As seen from the top....... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Hatesin: 9:31am On Oct 28, 2021 |
spyder880: Oga, Spyder good morning sir! Please what's the minimum courses of blocks for a duplex foundation? |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:38am On Oct 28, 2021 |
Hatesin: It all depends on what the building plans specify. A duplex foundation is usually 1 meter deep. So there should be about 3 blocks below ground level when we consider the concrete blinding. This is for dry ground only. 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Janesouthall: 4:26pm On Oct 28, 2021 |
dear spyder880.. can i do a 10 block coach from German floor to linted level in my bungalow build. cos i like the 10 block coach you did. 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:34pm On Oct 28, 2021 |
Janesouthall: Yes you can, I hope your bungalow has some pillars in some places? 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Janesouthall: 4:37pm On Oct 28, 2021 |
spyder880: thanks... yes I did chained foundation and it has a lot of pillars both internally and around. I intend doing chained linted also. |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Hatesin: 4:41pm On Oct 28, 2021 |
spyder880: Ok. That's to say that 4 courses wouldn't be a bad idea? |
(1) (2) (3) ... (6) (7) (8) (9) (10) (11) (12) ... (19) (Reply)
Abuja Is Not For Everybody. FCT Is Designed For Some Set Of People / Low Cost Housing. A Case Study Of The Cost Of Building A 1 Bedroom Bungalow. / Cost Of Renting A 2 Bedroom Apartment In Lagos | Co-tenant
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 35 |