Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:14pm On Oct 16, 2021 |
Getting ready for a borehole drilling here .......... 2 Likes
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:16pm On Oct 16, 2021 |
Our soakaway system is being reinforced for a slab on the top of it............ 2 Likes
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:20pm On Oct 16, 2021 |
Hanging the gate today......... 4 Likes
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:26pm On Oct 16, 2021 |
More pictures 2 Likes
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:29pm On Oct 16, 2021 |
Now we are ready to start excavation works for the swimming pool, as well as our elephant statue. The workers needed for the swimming pool arrived today, bathroom floor tiles will also continue as from this evening, more pictures from this project by next week. 3 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by dehiero: 2:36am On Oct 17, 2021 |
spyder880:Can you build this, high roof just like this but the bedrooms and hall ways will have normal ceiling heights ?...i think that would make sense too What is the estimated cost for this project? 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 5:29am On Oct 17, 2021 |
dehiero: Its easy to do normal ceiling height in any room, it only takes the ceiling POP to be reduced to your desired height. This project is very costly to build, let's not look at it as a bungalow, the budget required to build this particular house can very easily complete a duplex. 8 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by tranxo(m): 6:32am On Oct 19, 2021 |
spyder880:Serious!!?? Even with the deck in a duplex? |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:01am On Oct 19, 2021 |
tranxo: Yes sir. The ground space covered by this building is massive, this floor space can contain 2 different duplexes of 6 bedrooms without any issues. So the foundation of this house can finance the foundation of 2 duplexes. On the walls, note that the whole walls were reinforced with columns and lintels enough to build a proper duplex, consider the cost of the very high walls and the extra reinforcement as the walls are going up extraordinarily high, that's the cost of half a decking there in the very high walls. The parapet and roofing of their house can well do the roofing of 2 different duplexes. The space covered with roofing wood and roofing tiles is so much. Perhaps, the item that costs a lot of money in this house was the scaffolding. To reach up to nearly 6 meters up the walls to work inside or outside this building needed very strong scaffolding to make it safe for people to balance and work. Plastering this house was a huge challenge, the first team ran away with my money, Togolese boys. I had to bring my Enugu team to come complete this plastering. This is not a normal bungalow at all. This house can complete one and a half duplexes with good change in the pocket. 5 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 7:12am On Oct 19, 2021 |
Complete cast of the soakaway with concrete. Work completed. 2 Likes
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by BiigTee: 9:30am On Oct 19, 2021 |
Good morning oga Souder! Pls I have come to draw a little from ur well of knowledge... Pls I would like to know if there is any structural disadvantage in omitting the roof beam of a building. The building in question is chain lintelled and the parapet fascia is polystyrene so it's super light weight! |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 9:44am On Oct 19, 2021 |
BiigTee: The polystyrene fascia, did they do a concrete beam at the point of installation? 1 Like 1 Share |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by tranxo(m): 9:46am On Oct 19, 2021 |
spyder880:Your vast experience came in handy. Thanks for the detailed explanation 2 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Greatbeard(m): 12:57pm On Oct 19, 2021 |
Hello Sir spyder880, Please what would be the cost of labour/material for installing Roof water collector/ drainage for a standard 3 bedroom flat? Please Any idea/estimate at all will be helpful. |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by BiigTee: 4:28pm On Oct 19, 2021 |
The beam is what is meant to hold it.. Also.. It can also be held with cement mortar without any beam.. Thats why I want to know which to go for.. The roof beam or ordinary cement mortar spyder880: |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 8:52pm On Oct 19, 2021 |
Greatbeard: Budget about N400,000 for it. It could be much less if you're using cheaper materials than the ones I used on this building. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by bizzibodi(m): 10:03pm On Oct 19, 2021 |
sonnie10:We are a useless country with all d vast deposit of iron ore at ajaokuta,itakpe. 2 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by michlins(m): 1:44am On Oct 20, 2021 |
spyder880:o boy eh. Things are becoming terribly worse. One of my clients asked that I take delivery of his water collectors and deliver to his site for a duplex and bq and it was about 1ml. This was less than four months ago |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 5:14am On Oct 20, 2021 |
spyder880:nice gate but no suite this house.. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 5:21am On Oct 20, 2021 |
spyder880:can 400k also work for 3 flat building? i.e 3 bedroom, 1 bedroom n parlour single self con, 2bedroom ? all in one building. thanks |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 5:27am On Oct 20, 2021 |
spyder880: thanks boss, i am doing same. i am using spanish tiles for my dinning, sitting room and entrance lobby. all d rooms will be nigerian glaze tiles to reduce too much expenses. still don't know what i will be using for my kitchen wall and tiles, can i use nigerian tiles as well or what is your advice? for the other flats at the back, will be using verified tiles. |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 5:30am On Oct 20, 2021 |
spyder880: i will lv to send u a pic of my house so u cn help me with a nice paint choice cos i am nt good at it lol |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:35am On Oct 20, 2021 |
BiigTee: Go for roof beam then. Good morning bro. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:43am On Oct 20, 2021 |
donforeign: Then you have to raise the budget, it's better to get someone on ground to measure and give a full quite because even as we're here talking, the prices may have increased due to inflation. I cant remember but this house water channel was done with around N700,000 or a little more. I will have to check in my office for the receipts. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by bizzibodi(m): 7:03am On Oct 20, 2021 |
spyder880:With this kind of house I will need four plots. 1 Like |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Greatbeard(m): 9:03am On Oct 20, 2021 |
Okay, Thanks Sir. I really appreciate your insight. spyder880: |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Nobody: 10:20am On Oct 20, 2021 |
I tap into this house. I also want a four bed house. My prayer is answered 2 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 3:20pm On Oct 20, 2021 |
Perfectdanny: Amen. We will gather and celebrate your new house soon. 2 Likes |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 3:20pm On Oct 20, 2021 |
Completed soakaway system.......... Starting the swimming pool. 1 Like
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 3:24pm On Oct 20, 2021 |
Hanging our roller gate....... 1 Like
|
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Nobody: 3:25pm On Oct 20, 2021 |
Started from page one and now we here 1 Like 1 Share |
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 3:26pm On Oct 20, 2021 |
Perfectdanny: Welcome Sir. 1 Like |
(1) (2) (3) ... (20) (21) (22) (23) (24) (25) (26) ... (46) (Reply)
I Cried When I Entered The Houses Of Billionaires In Lekki / These Houses In Ebute Metta Are Too Close To Each Other (pictures) / Lagos Family Houses (Pictures)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 57 |