Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,205,952 members, 7,994,259 topics. Date: Tuesday, 05 November 2024 at 10:14 AM

Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor (9722 Views)

2023 Election: Security In Borno Has Improved Tremendously By Over 90% - Zulum / Over 90% Of Policemen Don't Have Befitting Barracks To Stay - IGP / School Feeding Programme Is 'total Corruption', Says NLC (2) (3) (4)

(1) (2) (Reply) (Go Down)

Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by OEPHIUS(m): 5:52am On Oct 24, 2021
Comprehensive rehabilitation of 9th Mile Crash Programme with installation of solar powered boreholes for availability, sustainability of water supply in Enugu, over 90 percent completed, says Contractor

…Commends Gov. Ugwuanyi’s efforts

The Managing Director of FordMarx Nigeria Limited, Dr. Clifford Nnaji, who is handling the complete rehabilitation of the 9th Mile Crash Programme being executed by the administration of Governor Ifeanyi Ugwuanyi of Enugu State, after over 30 years since the water project was abandoned, has assured residents of Enugu that the issue of potable water supply will soon be a thing of the past.

Dr. Nnaji who spoke on the extent of work done at the site, disclosed that the water scheme which involves the conversion of 13 industrial boreholes to solar power to ensure availability and sustainability of water reticulation to Enugu metropolis “is over 90 percent completed”.


https://www.youtube.com/watch?v=s9HXNign3EI

It would be recalled that Gov. Ugwuanyi’s administration in its sheer determination to decisively address water challenges in the state recently awarded contract to FordMarx Nigeria Limited for comprehensive rehabilitation of the 9th Mile Crash Programme which was abandoned after the administration of former Governor Jim Nwobodo of old Anambra State.

Each of the rehabilitated boreholes is solar powered, to address the peculiar challenges of power failure.

The project was conceptualized by Gov. Ugwuanyi’s administration to boost the volume of potable water being reticulated from the aged water scheme. The project has a two-year warranty and maintenance by the company.

Speaking further, the Managing Director of FordMarx Nigeria Limited stated that “we are getting more than what we expected in terms of the quality of water and soonest we will be rounding off”.


https://www.youtube.com/watch?v=LBbKpZkVID0

Dr. Nnaji assured that “water will be available at an affordable rate and also sustainable because the rehabilitated boreholes are powered by solar as we will not wait for the grid electricity or diesel powered generator to pump water”.

He revealed that after servicing the 13 boreholes they discovered at the site, eight of them are now in good working condition stressing: “There is enough potable water and we have seen more than what we expected”.

According to him, “the borehole can sustain more than the size of the pump we proposed initially. The borehole can sustain more than 100 horsepower pump. We had expected something about 500 cubic meters per day from a hole, but now we are getting more than double of what we expected”.

The contractor who listed other ongoing projects at the site such as perimeter fencing of 250 plots of land covering the facility, severe gully erosion control of about 15 meters depth and a security tower with CCTV cameras, commended Gov. Ugwuanyi for his unrelenting commitment to the massive water project aimed at addressing the challenges of water supply in Enugu, pointing out that the governor “is the man of the people who listens to the voice of the people”.

#EnuguStateIsInTheHandsOfGod
#amokelouis

https://www.facebook.com/100044234839321/posts/427178235433334/

2 Likes 2 Shares

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by OEPHIUS(m): 5:53am On Oct 24, 2021
More

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by OEPHIUS(m): 5:54am On Oct 24, 2021
2

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Danjikanbauchi: 6:06am On Oct 24, 2021
This is a very nice project, considering how water scarcity effect 042, God bless all lovers of freedom,
God bless BIAFRANS.

13 Likes

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by sweetonugbu: 6:14am On Oct 24, 2021
Good job mr governor
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by tony0806: 6:20am On Oct 24, 2021
Great job

1 Like

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Ppogbae: 6:24am On Oct 24, 2021
Borehole in 21st century grin

2 Likes

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Superwave16320: 6:25am On Oct 24, 2021
If this was located in any other part of Nigeria you will hear foolish n hopelessly sense Igbo say Nigeria like celebrating mediocrity

Is he building it with his money.

He is only doing his job etc

But now look at the comment of the first 3 fools above. Search through their previous comments to see they are Igbos, then make your own judgements.

Just yesterday Yahaya Bello was showcasing the standard bridges, gigantic hospital etc he was building n this fools from Alaigbo were all over the thread commenting there is nothing to celebrate in a governor building bridge but alas here we are to celebrate a whole Enugu governor celebrating borehole.

Show me any Igbo governor aside Obiano first followed by Umahi ( not moved by his propaganda on NL) the rest I will show you what FAILURE is in liquid form is.

8 Likes 3 Shares

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by janedonez(m): 6:39am On Oct 24, 2021
Good
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by bestman09(m): 7:16am On Oct 24, 2021
sad
Hope it won't pack up after the 2 years guarantee?

2 Likes

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by benuejosh: 7:16am On Oct 24, 2021
Hallelujah somebody! At least Gov. Ugwuanyi has for one done something.

Igbo men and pot belly.
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Umsworld: 7:18am On Oct 24, 2021
Mediocrity

1 Like

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Brimstone77: 7:21am On Oct 24, 2021
Superwave16320:
If this was located in any other part of Nigeria you will hear foolish n hopelessly sense Igbo say Nigeria like celebrating mediocrity

Is he building it with his money.

He is only doing his job etc

But now look at the comment of the first 3 fools above. Search through their previous comments to see they are Igbos, then make your own judgements.

Just yesterday Yahaya Bello was showcasing the standard bridges, gigantic hospital etc he was building n this fools from Alaigbo were all over the thread commenting there is nothing to celebrate in a governor building bridge but alas here we are to celebrate a whole Enugu governor celebrating borehole.

Show me any Igbo governor aside Obiano first followed by Umahi ( not moved by his propaganda on NL) the rest I will show you what FAILURE is in liquid form is.
kill hate before hate kill you... grin

See as you typed long essay just spit out hates.

15 Likes 1 Share

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by chidonweb(m): 7:23am On Oct 24, 2021
Water is a serious problem in enugu
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Zagee: 7:24am On Oct 24, 2021
Enugu should be monetizing water within their "urban areas". Set up a good water management company and run the affairs. Clean water, good health, more tax everybody wins!!
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by gift01: 7:25am On Oct 24, 2021
chidonweb:
Water is a serious problem in enugu
and they can't do the road to transport it

1 Like

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by dannovidlimited: 7:32am On Oct 24, 2021
there is no good job here but fouls play
d wrk has not up to 30% at all
no tanks no storages distribution no operating house
only a bole hole and solar panels
it either deception or under report programme

4 Likes

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by dannovidlimited: 7:34am On Oct 24, 2021
sweetonugbu:
Good job mr governor


there is no good job here but fouls play
d wrk has not up to 30% at all
no tanks no storages distribution no operating house
only a bole hole and solar panels
it either deception or under report programme

1 Like

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by NoFucksToGive: 7:41am On Oct 24, 2021
CELEBRATING A BOREHOLE?? IN THE 21ST CENTURY? ENUGU IS CURSED WITH USELESS LEADERS JUST LIKE THE REST OF NIGERIA
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by MISSCONGENIALITY(f): 7:53am On Oct 24, 2021
Something that may never come to.life? No be today Enugu start to dey lack water.
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Agbalanze(m): 7:53am On Oct 24, 2021
Superwave16320:
If this was located in any other part of Nigeria you will hear foolish n hopelessly sense Igbo say Nigeria like celebrating mediocrity

Is he building it with his money.

He is only doing his job etc

But now look at the comment of the first 3 fools above. Search through their previous comments to see they are Igbos, then make your own judgements.

Just yesterday Yahaya Bello was showcasing the standard bridges, gigantic hospital etc he was building n this fools from Alaigbo were all over the thread commenting there is nothing to celebrate in a governor building bridge but alas here we are to celebrate a whole Enugu governor celebrating borehole.

Show me any Igbo governor aside Obiano first followed by Umahi ( not moved by his propaganda on NL) the rest I will show you what FAILURE is in liquid form is.

If you have visited enugu, you will understand why water project is been celebrated.

2 Likes

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Amudeneogu: 8:19am On Oct 24, 2021
Every water projects in Enugu still water is not running anywhere in Enugu
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Creed86(m): 8:27am On Oct 24, 2021
At this stage, we are celebrating water when we know say no go work all nah scam.
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by frozen70(f): 9:41am On Oct 24, 2021
Superwave16320:
If this was located in any other part of Nigeria you will hear foolish n hopelessly sense Igbo say Nigeria like celebrating mediocrity

Is he building it with his money.

He is only doing his job etc

But now look at the comment of the first 3 fools above. Search through their previous comments to see they are Igbos, then make your own judgements.

Just yesterday Yahaya Bello was showcasing the standard bridges, gigantic hospital etc he was building n this fools from Alaigbo were all over the thread commenting there is nothing to celebrate in a governor building bridge but alas here we are to celebrate a whole Enugu governor celebrating borehole.

Show me any Igbo governor aside Obiano first followed by Umahi ( not moved by his propaganda on NL) the rest I will show you what FAILURE is in liquid form is.

Why not leave the Igbo's with their problems and concentrate on being a better man

Your comments shows how bittered you are with the Igbo people

Does it mean that you are more happier with the North and their Boko Haram wahala

I means do you rather support the Boko Haram and wish yours will be a victim of their massacre?

1 Like 1 Share

Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by JOACHINpedro: 11:02am On Oct 24, 2021
Good one, hope they extend the project to location wey no get access to water like abakpa and Kenyatta
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by lomprico(m): 12:36pm On Oct 24, 2021
sweetonugbu:
Good job mr governor

will it server the whole state capital?
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by aigohior(m): 1:28pm On Oct 24, 2021
I give it two years, before it spoil and stop working
Re: Enugu: 9th-Mile Water Programme Is Over 90% Completed - Contractor by Emperor5(m): 3:09pm On Oct 24, 2021
Nice job. But it seems the solar panels is poorly constructed

(1) (2) (Reply)

The Man Who Hugged Bianca Ojukwu When She Slapped Former Anambra's Firstlady / Bayelsa Election 2023: Survey Gives Governor Diri Victory In 8 LGAs / The New Igp, Md Abubakar's Past Sins: A Bad Replacement For Ringim!

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.