Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,207,331 members, 7,998,614 topics. Date: Saturday, 09 November 2024 at 08:32 PM

Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ - Properties (5) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ (29678 Views)

New: Luxury 3 Bedroom Terrace + 1 Bed BQ @ Abraham Adesanya Ajah / Construction 4 Massive Bedroom With Garage All Ensuit / 7-bedroom Duplex + 2-bed Bq On 800+sqm @ Tijani Bello St Ojodu By Omole 1 (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (23) (Reply) (Go Down)

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 3:47pm On Mar 18, 2022
More Work updates from site to come today...

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 12:00pm On Mar 19, 2022
Blocks are ongoing as well as colum and Lintel reinforcement works.

See updates below.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by ricki: 10:57pm On Mar 19, 2022
the ceiling tall and high o.............. grin

well done

1 Like

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 3:01am On Mar 20, 2022
ricki:
the ceiling tall and high o.............. grin

well done

Yes sir. It is. Exactly as the client wants it. smiley

Good morning Sir
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 1:49pm On Mar 20, 2022
More pictorial Work update
We are already at Lintel level and taking leveling now. We are also forming the upper floor Colums as well

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 5:02pm On Mar 21, 2022
Let's flash you back to our goal.
We are still on course. Stay tuned with us.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 3:04pm On Mar 22, 2022
Colum and Lintel Works ongoing

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 7:56am On Mar 24, 2022
Work update on the concrete work and now leveling the first floor before we commence concrete facial works

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 3:16pm On Mar 24, 2022
Leveling works still ongoing.
A view of different angles of the building images below.

We are immediately greeting set for the concrete facial works.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 7:05am On Mar 26, 2022
We have started the concrete facial works here.
The Carpentry aspect is already ongoing as we speak.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 4:16pm On Mar 26, 2022
Construction Updates on the Concrete Facial Formwork

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 5:06pm On Mar 28, 2022
Parapet work update

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 7:50pm On Mar 30, 2022
We were able to start up the parapet concrete works.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 7:37pm On Mar 31, 2022
We are wrapping up the parapet work

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 10:24pm On Apr 01, 2022
Good evening All
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 9:53am On Apr 04, 2022
43 Bags of Cement was used for the parapet works alone....

20 Tons of Granite.

15 Tons of sand.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 8:57pm On Apr 06, 2022
Good evening all
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 5:26am On Apr 07, 2022
Good morning Viewers.
We are preparing for roofing Carcass now.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 7:22am On Apr 13, 2022
Good morning Viewers

We are preparing for roofing Carcass and covering together. So stay tuned here

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 8:10am On Apr 14, 2022
Front view

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 2:50pm On Apr 16, 2022
Paid a short visit to the site today.

Here are some of the updates of what we can see on site.

Grass is growing around everywhere because of rainfall no site activity.


Meanwhile our parapet works here is showing off itself. Cool as it is and as it looks. Durable as it should.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 9:45am On Apr 18, 2022
Good morning all.
Wishing you a happy new week ahead
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 9:46am On Apr 18, 2022
Good morning all.
Wishing you a happy new week ahead.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 8:29am On Apr 19, 2022
Good morning Viewers
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 7:56am On Apr 21, 2022
Piping and wiring estimates of this project are equally being sorted out... At the moment...

We have got window estimates.

Ranging from 1.75 - 2.2m on average from 3 different window and aluminum guys if which two are resident vendors here in Nairaland.

We are currently reviewing all these with clients while we are awaiting for the roofing wood work and sheet to complete the Carcass
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by mufutau55(m): 3:14pm On Apr 21, 2022
Thanks for all the updates. The interested minds are still following. Good work Sir.

Hajji M.

2 Likes

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 4:29pm On Apr 21, 2022
mufutau55:
Thanks for all the updates. The interested minds are still following. Good work Sir.

Hajji M.

Thanks sir.
We ain't relenting regardless.
Because we are keep track for future record purposes and references for whoever is interested in making use of such information as a benchmark for future projects
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by kopell: 11:24pm On Apr 21, 2022
Dennis3D:
Piping and wiring estimates of this project are equally being sorted out... At the moment...

We have got window estimates.

Ranging from 1.75 - 2.2m on average from 3 different window and aluminum guys if which two are resident vendors here in Nairaland.@ bold Not bad mine double that

We are currently reviewing all these with clients while we are awaiting for the roofing wood work and sheet to complete the Carcass
Many of this aluminum guys are useless. Imagine paying %99.2 of total sum up front. Still delaying the job, and telling all kinds promise stories not complete the job @ stipulated time.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 7:18am On Apr 22, 2022
kopell:
Many of this aluminum guys are useless. Imagine paying %99.2 of total sum up front. Still delaying the job, and telling all kinds promise stories not complete the job @ stipulated time.

Woww. That will be unacceptable I must say If you pay up to 99% upfront. There is no reason why the person shouldn't deliver o.

Delays can only be found when the payment is in installment and bits of which that's not the best option though.

I wonder what might have caused that delay because you have paid almost everything. He shouldn't delay.

What was his reason sir?
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by kopell: 9:35pm On Apr 22, 2022
Dennis3D:


Woww. That will be unacceptable I must say If you pay up to 99% upfront. There is no reason why the person shouldn't deliver o.

Delays can only be found when the payment is in installment and bits of which that's not the best option though.

I wonder what might have caused that delay because you have paid almost everything. He shouldn't delay.

What was his reason sir?
Broking glass on the way to site, waiting for replacement. Workers want break all kinds of senseless excuses.

1 Like

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by mufutau55(m): 9:38pm On Apr 22, 2022
kopell:
Broken glasses on the way to site, waiting for replacement. Workers want break all kinds of senseless excuses.

How does ppl like this want you to recommend them to another Client? I will always make a note of their behavious.

Hajji M.

1 Like

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(m): 1:46am On Apr 23, 2022
kopell:
Broking glass on the way to site, waiting for replacement. Workers want break all kinds of senseless excuses.

That shouldn't be much of an excuse to a client.
What a client expect is job delivery.

Over the years what a client always expect after they have paid for their job is delivery and not excuses. Unless it's something beyond your control like an act of god then a client is expected to reason along with the vendor.

But in this case, going on subtle break and all those glass damage excuses Is a combination of points that in this case a client doesn't want to head unless proper communication in the process is established.

A broken Glass for instance is one of the risks of window guys nightmare but I feel they should be aware of that before they commence their window work logistics and movement to and fro from location of purchase to site.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (23) (Reply)

Three Historical Buildings In Nigeria, The Historic Bodija Housing Estate Ibadan / What Is The Price Of One Bag Of Cement In Your Area? / Review:To Let In Various Locations In Ibadan.with pictures#LATEST

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 27
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.