Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,218,557 members, 8,038,325 topics. Date: Friday, 27 December 2024 at 01:35 PM

Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site (19643 Views)

Pictures Of The Road Infrastructures Governor Adeleke Built In The Last 6 Months / Contractor To Suspend Lagos-Ibadan Road Construction, Resume January / Anambra Airport: Smart Adeyemi Leads Aviation Committee To Site (Photos) (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by 9jahotblog: 12:17pm On Feb 03, 2023
Four years after, contractor returns to Osogbo-Ikirun-Kwara boundary road

After four years of abandonment, the contractor handling the Osogbo-Ikirun-Kwara boundary road, SAMYA Construction Company Limited, has returned to the road, Osun Daily gathered.

It would be recalled that the Osun State government under the administration of Ogbeni Rauf Aregbesola, flagged off the construction of the road in 2012.

The State government has signed an N17.8 billion contract agreement with SAMMYA Construction Company Limited for the dualisation of the 45 kilometers Osogbo-Ikirun- Kwara State Boundary Road.

A statement from the state government then said "the dualisation had been segmented into three of Osogbo-Dagbolu (International Market) to Alamisi Market in Ikirun (9.52 kilometers); Osogbo (Old-garage) to Ikirun junction road (20.5 kilometers) and Ikirun-IlaOdo- Kwara State boundary road (16.5 kilometer)".

However, the road which was not completed before the Aregbesola administration handed it over to its predecessor and immediate past governor of the state, Gboyega Oyetola, was only dualised to Ikirun with the rest abandoned for the last four years.

Residents Attribute Abandonment To Fight Between Aregbesola and Oyetola

Meanwhile, residents of the abandoned area have attributed the decision of the past government not to finish the road to the fight between Oyetola and his predecessor, Aregbesola.

The residents who spoke with Osun Daily said it was vindictive of Oyetola to abandon the road, while adding that the lack of a good road in the area has caused them a lot of hardship.

"It is very sad that the past governor abandon that road because of the fight between him and Aregbesola. That is so callous.

"Whatever will benefit the society, irrespective of whatever is happening between the two man, he ought to have continue that good work.

"The road was dualised from Osogbo to Ikirun and it stopped there but we are very glad the incumbent governor has ordered the contractor to return back to the road".

Kudos To Adeleke - Residents

Also, some residents who were joyous over the re-commencement of the road hailed the governor of the state, Senator Ademola Adeleke for the kind gesture.

"We are very happy with the latest developments. Once this road is complete, it will be beneficial to all of us.

"We want to thank Govenror Ademola Adeleke for his kind gesture and we pray that Almighty God will give him the grace to do more".

https://www.osundaily.com/2023/02/four-years-after-contractor-returns-to.html?m=1

12 Likes 2 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by 9jahotblog: 12:19pm On Feb 03, 2023
I read applaud Governor Ademola Adeleke on this massive gigantic projects in Osun State in his tenure. This is a good development. I really appreciate your effort to finish all the projects Aregbesola abandoned in his government. Good one here. This was how seyi Makinde finish all the projects Ajimobi abandoned.

61 Likes 5 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by 9jahotblog: 12:30pm On Feb 03, 2023
NEWS RELEASE
03/02/2023

Osogbo-Ikirun/Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor Back To Site

••••Governor Adeleke to Inspect Road project next week




The administration of Senator Ademola Adeleke has mobilized the contractor handling the Osogbo-Ikirun/Kwara State boundary road back to site to resume work on the project immediately after many years of abandonment.

This was disclosed by the Coordinating Director, Ministry of Works and Transport, Engr Olusola Ajao during a chat in his office.

The Osogbo-Ikirun/Kwara State boundary road was awarded some years ago but was not completed causing hardship to residents and especially motorists who ply the road on a daily basis.

Engr. Ajao said the State Governor magnanimously ordered the remobilization of the contractor back to site and commence the work so as to ease the suffering of motorists who ply the road on a daily basis.

He said the Governor has specifically ordered the contractor to ensure a speedy progress of the project and see that it gets to an advance stage within the next two months.

In his words, "I am delighted to announce to you that the administration of Senator Ademola Jackson Nurudeen Adeleke has graciously approved the mobilization of the contractor handling the Osogbo-Ikirun/Kwara State boundary road back to sight.

"The Governor has charged the contractor to move speedily on the project and ensure that work reach an advance stage in the next two months to ease the surfering of residents and motorists plying the road.

"I use the medium to urge road users and residents to cooperate with the contractors while the job is being carried out, I also express deep appreciation to the people friendly Governor, Senator Ademola Jackson Nurudeen Adeleke for mobilizing the contractor back to site after many years of abandonment.

Meanwhile, the contractor has resumed work in earnest.

Governor Adeleke is to visit the project site to inspect progress of work by next week.

Signed:
Mallam Olawale Rasheed ,
Spokesperson to the Executive Governor

12 Likes 2 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by yarimo(m): 12:43pm On Feb 03, 2023
Just hand over immediately without wasting tax payers money in dancing

31 Likes 7 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by iwaeda: 12:48pm On Feb 03, 2023
9jahotblog:
Four years after, contractor returns to Osogbo-Ikirun-Kwara boundary road



https://www.osundaily.com/2023/02/four-years-after-contractor-returns-to.html?m=1

Good one. Ama ri ona gba de ile. grin grin grin grin

3 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Jestin: 12:48pm On Feb 03, 2023
This man seems to be on the right track. They better let him continue with the good work that let the APC dude to come and use his second tenure to loot the state dry

15 Likes 1 Share

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by darthv: 12:48pm On Feb 03, 2023
yarimo:
Just hand over immediately without wasting tax payers money in dancing
sharap, you are very annoying

86 Likes 9 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Hendrixky: 12:48pm On Feb 03, 2023
Adeleke is still the governor

He shock tinubu supporters

And them better ready for the greatest shock after 25th

36 Likes 3 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by dam2000(m): 12:49pm On Feb 03, 2023
Osun wise up this man is ready to serve u

21 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by optimistfeel(m): 12:49pm On Feb 03, 2023
Good development....
Good governor that want to serve his people wholeheartedly without corruption unlike that........... undecided

5 Likes 1 Share

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by mbahdi(m): 12:49pm On Feb 03, 2023
Apc is alleged to good work.see a working governor d occultic and demonic government want to remove.God WI shame u all

10 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Passionate888: 12:49pm On Feb 03, 2023
Nice
Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by JackDaAlienz(m): 12:49pm On Feb 03, 2023
I'm ready to bet 300k with anybody that Adeleke will still be governor till 2025

If you get liver come let's bet
Cash upfront. Governor Adeleke is going nowhere

31 Likes 8 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by PrinceOfLagos: 12:50pm On Feb 03, 2023
yarimo:
Just hand over immediately without wasting tax payers money in dancing
so he shouldn't fix that road , he should hand over to APC oyetola so that the road will be neglected again and the lootings continue?

Shame on you

38 Likes 3 Shares

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by VisaInfoNL: 12:50pm On Feb 03, 2023
Working governor




IF you have 300k, would you buy a Samsung or Xiaomi phone?


If yes, why.

Thanks
Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Parachoko: 12:50pm On Feb 03, 2023
9jahotblog:
Four years after, contractor returns to Osogbo-Ikirun-Kwara boundary road



https://www.osundaily.com/2023/02/four-years-after-contractor-returns-to.html?m=1
Nah because Tribunal comot Adeleke e dey do all this eye service project

9 Likes 1 Share

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Goodlady(f): 12:50pm On Feb 03, 2023
Smart move. That case with Oyetola ll drag till 2028. Adeleke ll waste APC's time in the court.

2 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by CyberHustle: 12:51pm On Feb 03, 2023
Of all the pressing needs in that retrogressive state, a road dualization project?
Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by yarimo(m): 12:51pm On Feb 03, 2023
PrinceOfLagos:
so he shouldn't fix that road , he should hand over to APC oyetola so that the road will be neglected again and the lootings continue?

Shame on you
sign contract and he must hand over immediately nothing like appeal court wasting tax payers money

2 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by VenExchangee: 12:51pm On Feb 03, 2023
Nice one mr governor

1 Like

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by smokinloud(m): 12:51pm On Feb 03, 2023
Adeleke is really trying and it will be difficult for him to be impeached.

4 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by EeyanMayweather(m): 12:51pm On Feb 03, 2023
Fat dullard

1 Like

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Gadafii: 12:51pm On Feb 03, 2023
Governor wey dem don issue certificate, if I drop that certificate make I turn to letter Q

7 Likes 1 Share

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Dagger111(m): 12:52pm On Feb 03, 2023
Hendrixky:
Adeleke is still the governor

He shock tinubu supporters


Tinubu na your problem in life.

4 Likes 1 Share

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by yarimo(m): 12:52pm On Feb 03, 2023
darthv:
sharap, you are very annoying
Make sure you get your empowerment

3 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by OlawaleBammie: 12:52pm On Feb 03, 2023
yarimo:
Just hand over immediately without wasting tax payers money in dancing
are u nut??

What trash are u talking about??

This is what we re saying, u guys only care about party not minding the performance of who is there. And u wil call ursef an educated fellow.


Do t call me obidient oh, I am not one but I have to tell u that u falter

8 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Aniluvreal: 12:52pm On Feb 03, 2023
yarimo:
Just hand over immediately without wasting tax payers money in dancing


whether you like it or not, Adeleke will rule the state 8years, maybe the idiotic useless Thiefnubû asslicker Adegboyega Oyetola can come after 8years tenure of Adeleke.

5 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by Mrshocker(m): 12:52pm On Feb 03, 2023
Ade dancer awarding contracts to get money spent on elections back ASAP before appeal court chase him. Smart politician!! he will also gain sympathy from citizens for this rush rush projects

We all know APC don collect the state because there case evidence is strong against him.

6 Likes

Re: Osogbo-Kwara State Boundary Road: Governor Adeleke Mobilizes Contractor to site by smokinloud(m): 12:52pm On Feb 03, 2023
yarimo:
sign contract and he must hand over immediately nothing like appeal court wasting tax payers money
Adeleke will remain the governor while BAT will be elected President!.
God bless us!.

2 Likes

(1) (2) (3) (4) (Reply)

Herdsmen Cause Accident On Lagos-Abeokuta Expressway, Two Dead (graphic Pic) / Dana Air Gifts Hilda Baci, Mother Free Tickets For Domestic Travels / Picture Update Of Some Ongoing Projects In Nigeria

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 33
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.