Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,205,881 members, 7,994,041 topics. Date: Tuesday, 05 November 2024 at 05:20 AM

Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road (10133 Views)

Abakaliki Imam Of Ama-Hausa Central Mosque Kidnapped / Governor Seyi Makinde Walks 1.8km On Independence Day (photos) / Sanwo-Olu Flags Off Victoria Island-Oniru 1.8KM Road Network – Photos (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by SReporters: 7:08pm On Feb 03, 2023
The Ama Isi Udala Village road, Ifite-Ogwari road project, measuring 1.8 kilometers, has begun construction in the Ayamelum Local Government Area under the direction of Anambra State Governor Professor Chukwuma Charles Soludo, CFR.

The project, which was launched by the governor, is important since it connects to a nearby irrigation basin.

The Governor claims that he has come to fulfill a pledge by participating in the flag-off.


"Before I arrived, I spoke with the Ayamelum stakeholders, who begged us to build the Ayamelum road, connecting Awka with a bridge, and I thought it was highly strategic.

"Additionally, they claimed that Ayamelum individuals do not work in the public sector. We hired 5000 instructors nine months into our government, and Ayamelum folks are present in significant numbers.


"You also requested roads. And that's what we're here to do right now. All of this will happen within ten months. Your stakeholders also requested appointments, and we are already working on it. We'll work harder "The Governor emphasized.

"The first road, which runs for roughly 27 kilometers and connects Ayamelum with the state capital, is currently under construction, is extremely strategic, and will be finished in a few months.

"I was just informed by the Commissioner that the bridge has been planned. I am eagerly anticipating the bridge crossing the river.

"But most significantly, Ayamelum is APGA territory. Make sure you turn out in force and vote APGA in every way on election day.

"Our people should likewise adopt the culture of promptly paying their due share of taxes.

"A bishop advised me to hire only foreign contractors to build the roads in Anambra, but we awarded the contract to New Idea because they have the capacity and expertise to do the job.

The Governor added, "They mobilized to site as soon as they were handed the contract, which indicates capacity, but they should keep in mind that the contract specifies that the road would last at least twenty years.

Engineer Ifeanyi Okoma, the commissioner for works, pointed out that Governor Soludo is very interested in integrated development throughout the state and that the road being waved off links to an irrigation site, is guaranteed to survive for twenty years, and would be finished in five months.


Igwe Sir Ben Emeka congratulated Governor Soludo on behalf of New Idea Construction Company for allowing an indigenous business like theirs to display their craftsmanship.

He continued, "I want to reassure the governor that by the end of April, we must have delivered in accordance with the contract arrangement.

Rt. Hon. Uchenna Okafor, Speaker of the State House of Assembly and APGA Flag-bearer for the Ayamelum State House Assembly, recalled all the promises the Governor made to the people when he came to canvass for votes and emphasized that the flag-off and other things to come are in fulfillment of those promises.

He urged the populace to support APGA in every election if they wanted progress and stability.

Dr. Ebelechukwu Obiano, the APGA senatorial candidate for Anambra North, also spoke and said, "We've come to flag-off the road which is a good thing; so we have to thank the Governor by voting APGA," along with Lady Maurene Gwacham, the APGA flag-bearer for Oyi, Ayamelum Federal Constituency, who urged voters to support APGA so that the party could continue to hold office.

Mr. Ernest Ezeajughi, the governor's chief of staff, Mr. Livy Onyenwe, the commissioner for petroleum, Barrister Tony Ifeanya, Mr. Emeka Okonkwo, the MD/CEO of ATMA, and a sizable group of supporters were among those present at the event, which included cutting the ribbon to signify the official opening of the road.
https://www.solutionreporters.com/2023/02/03/soludo-flags-off-1-8km-road-construction-of-ama-isi-udala-ifite-ogwari/

6 Likes 2 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by SReporters: 7:09pm On Feb 03, 2023

2 Likes 2 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by Momcherry(f): 7:11pm On Feb 03, 2023
OK.




Anyways,
At the Beautiful Gate, Peter did not give shishi, he healed the lame! Acts:3

10 Likes 4 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by yarimo(m): 7:19pm On Feb 03, 2023
NGIGE and OBIANO all did very well in Anambra state, and now SOLUDU doing well as governor of Anambra state too

27 Likes 3 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by TenHag: 7:22pm On Feb 03, 2023
Soludo should liaise with the CCECC for the construction of rail lines in Anambra state

9 Likes 2 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by TenHag: 7:24pm On Feb 03, 2023
You are flagging off a 1.8km road project, is that what your mates are doing in lagos?

18 Likes 2 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by SReporters: 7:36pm On Feb 03, 2023
TenHag:
You are flagging off a 1.8km road project, is that what your mates are doing in lagos?

Easy.... Soludo has flagged off a total of 265km of roads in the state and still going in a span of 9 months. The 1.8km of road is an area at Ayamelum LGA....
As it stands, he's leading the rest of Governors who ruled the state in road construction. Imagine how many more roads he would construct after his first term in office?

27 Likes 4 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by Parachoko: 8:35pm On Feb 03, 2023
A road wey Peter Obi don build since when

I'm impress with the numbers of road construction Soludo don embark on.

I doubt Obi built up to 150km of road in 8 years

18 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by technuel: 8:36pm On Feb 03, 2023
K
Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by chiedozie198100: 8:39pm On Feb 03, 2023
the second pic just shows how mediocre the road is going to be.

so this is what soludu can come up with?

9 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by Shellsploit: 8:39pm On Feb 03, 2023
When will he flag off Umugalagu Road along otuocha akwuzu Road?

2 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by nawa4naija(m): 8:39pm On Feb 03, 2023
.this one that will soon be removed from office

Mugu Soludo
A Tinubu supporter

3 Likes 1 Share

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by NaijaCover(m): 8:39pm On Feb 03, 2023
Following The Thread
Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by lereinter(m): 8:42pm On Feb 03, 2023
TenHag:
Soludo should liaise with the CCECC for the construction of rail lines in Anambra state

Abeg let them finish all road first

3 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by richidinho(m): 8:43pm On Feb 03, 2023
Soludo is a one term governor

1 Like 2 Shares

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by SReporters: 8:44pm On Feb 03, 2023
Shellsploit:
When will he flag off Umugalagu Road along otuocha akwuzu Road?

Soon..... Every Local Government will be touched

2 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by lereinter(m): 8:44pm On Feb 03, 2023
TenHag:
You are flagging off a 1.8km road project, is that what your mates are doing in lagos?


Examine your reasoning

5 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by ransomed: 8:46pm On Feb 03, 2023
[quote author=TenHag post=120610559]You are flagging off a 1.8km road project, is that what your mates arer doing?

All he knows is about speaking grammar, time to work he starts doing media show off..
Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by richidinho(m): 8:46pm On Feb 03, 2023
yarimo:
NGIGE and OBIANO all did very well in Anambra state, and now SOLUDU doing well as governor of Anambra state too

Peter Obi name is missing in your list, his only crime is he wants to be the president 😀😀😀

7 Likes 1 Share

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by GeneralPula: 8:48pm On Feb 03, 2023
grin

12 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by Malory: 8:48pm On Feb 03, 2023
yarimo:
NGIGE and OBIANO all did very well in Anambra state, and now SOLUDU doing well as governor of Anambra state too
What about Obi?

1 Like

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by letitrainnow(m): 8:52pm On Feb 03, 2023
Smart you
Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by Cantonese: 8:53pm On Feb 03, 2023
TenHag:
You are flagging off a 1.8km road project, is that what your mates are doing in lagos?

Are you at the level of your own mates, wherever they are? See how not reading the points stated properly has exposed your deficiencies. Go and read clearly again.

3 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by Owerriboi: 8:53pm On Feb 03, 2023
Anambra is the most developed state in igboland while my state is very backward. I wish I am from Anambra

2 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by Tbagwell80: 8:55pm On Feb 03, 2023
Such a senseless professor. Ordinary flagging off 1.8km of road with such fanfare. A whole State governor. What will then happen during the commissioning? What is wrong wrong with Africans for goodness sake?

4 Likes

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by swaly: 8:55pm On Feb 03, 2023
Miraclexoyaga42:
Ydydg

Way your Benz mr man.. no come here day drop fake SS
Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by bestman09(m): 8:58pm On Feb 03, 2023
sad
Can you imagine obiano's wife speaking because she wants their vote.

She was in power with her husband for 8 years and didn't think about doing the road. Bunch of scammers

1 Like

Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by DispatcherLagos: 8:59pm On Feb 03, 2023
What is special in putting on a face cap all the time?
Re: Soludo Flags-Off 1.8km Construction Of Ama Isi Udala, Ifite-ogwari Road by teaj007(m): 9:00pm On Feb 03, 2023
chiedozie198100:
the second pic just shows how mediocre the road is going to be.

so this is what soludu can come up with?

Seriously …..everything about this country is a joke. Very poor.

(1) (2) (3) (Reply)

EndSARS: Lagos Panel Awards Another ₦91 Million To Police Brutality Victims / President Buhari Greets Basheer Garba Lado At 55 / Discos Operating Licenses Expired In October – Reps

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 35
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.