Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,218,135 members, 8,036,779 topics. Date: Wednesday, 25 December 2024 at 08:24 AM

N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps (26863 Views)

Ajaokuta-Itakpe-Warri Railway To Be Commissioned Soon (Photos) / Under Flyover Bridges In Dubai Vs. Under Flyover Bridges In Lagos (PHOTOS) / Itakpe/warri: Nigerian Railway To Commence One Month Free Train Ride (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by ManirBK: 9:53am On Jul 08, 2023
There are strong indications that the $2 billion, about N1.54 trillion, Kano-Maradi railway line that links Nigeria and Niger Republic will have over 100 bridges and three side camps among other facilities when completed.

The project which is currently being handled by MOTA-ENGIL NIGERIA is expected to be completed in three years.

Speaking with media men at the Port & Cargo Terminal in Lagos, Mr Nuno Colaco, the company’s logistics manager, explained that the project which was expected to be delivered in three years would have over 100 bridges and three side camps among other facilities of a modern railway line.

Colaco revealed that the project was massive and that about 100 kilometres of the project had been paved ahead of the main construction work.

He further said, It is a 400-kilometre railway, starting from Dutse in Kano and terminating in Maradi in Niger Republic. This is one of the biggest projects to be handled by the Portuguese company.

“We came to Nigeria in 2018 and we are happy that we got this project two years after our arrival. Nigeria is the biggest economy in Africa with huge potential.”


Also speaking, the Customs Controller of Tin Can Island, Mr Adekunle Oloyede, who said that there had been a decrease of cargo throughput at the ports, expressed delight at the sheer size of the Mota-Engil import, saying it was evidence that the Nigerian economy was on the rebound.

https://dailytrust.com/n1-54trn-kano-maradi-railway-to-have-over-100-bridges-3-side-camps/

14 Likes 4 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by ManirBK: 9:53am On Jul 08, 2023
Thank you BABA BUHARI and God bless you

18 Likes 10 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by geesilver(m): 9:54am On Jul 08, 2023
Waste of scarce resources

189 Likes 11 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Sasi54: 10:12am On Jul 08, 2023
U can just the economy miracles that will spinup in those areas the train infrastructure will pass through. I just hope the host communities will make good use of the facilities when fully completed

11 Likes 2 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by AwokenVawulence: 10:21am On Jul 08, 2023
Southerners must get sense by force angry

68 Likes 2 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by LikeAking: 10:31am On Jul 08, 2023
geesilver:
Waste of scarce resources

Truth!


We have epeleptic power supply, govt is building rail way..

111 Likes 9 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Sajeb: 10:31am On Jul 08, 2023
angry

1 Like 1 Share

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by kettykings: 10:35am On Jul 08, 2023
I still don't understand the business case for this railway project

143 Likes 12 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by CodeTemplar: 10:42am On Jul 08, 2023
Can this project repay even 20% of its cost in 10 years?

In continuation of the movement of ND resource to develop NE,NC and NW, they will stop more subsidies to repay for this project. God!

43 Likes 2 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by CodeTemplar: 10:43am On Jul 08, 2023
kettykings:
I still don't understand the business case for this railway project
The one they built within can not repay its cost in 100 years yet they are building more and removing subsidies to fund what, in my estimate, 75% of Nigerians cannot make use of. Wonderful economic policies of Tinubu and Buhari.

70 Likes 6 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by RuddyFusion(m): 10:47am On Jul 08, 2023
What is the economic benefit of this project to our economy?

Do we have one within that connects Nigeria economic hubs? I don't think so ..it's this one leading to NIGER republic that's a priority
It's well

72 Likes 4 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Racoon(m): 10:47am On Jul 08, 2023
Of what economic importance is Niger Republic to Nigeria? The senseless and most useless president to ever rule this nation left the sovereign concerns of his surrogate country for his real country.

79 Likes 7 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Mjshexy(f): 10:52am On Jul 08, 2023
Big waste of resources, if they had built factories or industries across the geopolitical zones in Nigeria, thereby engaging many of our youths and reducing this huge unemployment state that is a waiting time bomb, Nigerians would have appreciated it better than this nonsense waste of money (Loan) they have engaged in sad

34 Likes 4 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by CodeTemplar: 10:52am On Jul 08, 2023
RuddyFusion:
What is the economic benefit of this project to our economy?

Do we have one within that connects Nigeria economic hubs? I don't think so ..it's this one leading to NIGER republic that's a priority
It's well
so they can bring in fuel from Niger and sneak in Hausa speaking islamists.

20 Likes 2 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by CodeTemplar: 10:55am On Jul 08, 2023
Mjshexy:
Big waste of resources, if they had built factories or industries across the geopolitical zones in Nigeria, thereby engaging many of our youths and reducing this huge unemployment state that is a waiting time bomb, Nigerians would have appreciated it better than this nonsense waste of money (Loan) they have engaged in sad
thank you. If power plants were built around industrial estates that are secured specifically, it will be easy to sell cheap power to producers of basic commodities and not subsidizing consumption.of electricity for leisurely purposes that don't grow GDP in any way.

14 Likes

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by ambale(m): 10:55am On Jul 08, 2023
Sasi54:
U can just the economy miracles that will spinup in those areas the train infrastructure will pass through. I just hope the host communities will make good use of the facilities when fully completed

Nothing will happen there, the Lagos-ibadan is a perfect example, the train doesnt stop at areas where people are, so how then do they make a fortune from it

Except the promoters pave out some other ways to make it viable

13 Likes

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by geesilver(m): 11:00am On Jul 08, 2023
LikeAking:


Truth!


We have epeleptic power supply, govt are building rail way..
It's all about favouritism to them. Once you have the power to do what would favour your people at the expense of others which is totally wrong

9 Likes

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by slimfit1(m): 11:22am On Jul 08, 2023
Economic benefits?

2 Likes

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Simeonjoe1: 11:40am On Jul 08, 2023
A waste?

After Lagos to ibadan. The east-west rail corridor should have been prioritized all the way to Portharcourt.

Abuja to Kano should be third on the list, then ibadan - ilorin-minna - Abuja

25 Likes 1 Share

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Simeonjoe1: 11:42am On Jul 08, 2023
Racoon:
Of what economic importance is Niger Republic to Nigeria? The senseless and most useless president to ever rule this nation left the sovereign concerns of his surrogate country for his real country.
. There is. This can spur economic activities between the countries and help improve Niger utilization of Nigerian ports. If the propose kaduna refinary is renewed it can help fastened fuel exchange between Nigeria and Niger.

But the main concern is the priority of this project, going by high traffic volume and profitability.
The lagos- ibadan
Onitcha - owerri-aba-Portharcourt (segment of east - west rail)
Lagod-Ibadan - ilorin -minna-Abuja
Abuja-kaduna - kano.

The Portharcourt -maidiguri should be last on the list and should only be developed when other critical rail line has been made.

15 Likes

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by mrvitalis(m): 11:49am On Jul 08, 2023
Sasi54:
U can just the economy miracles that will spinup in those areas the train infrastructure will pass through. I just hope the host communities will make good use of the facilities when fully completed
There is no economically this train can make sense economically... It's impossible to break even... Would never make a profit.. Never

The only viable train in Nigeria is Lagos to Abuja

Lagos to port Harcourt with branches to Onitsha ans aba... That's all
Even this one is even not sure

No other van be viable

16 Likes 1 Share

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Adabestseason(m): 12:20pm On Jul 08, 2023
Coastal railway is an opportunity cost

1 Like

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by youngrichnigga: 1:30pm On Jul 08, 2023
This is infrastructure subsidy Nigeria is paying for Niger, we have been swindled angry angry angry

11 Likes 1 Share

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Gadafii: 3:41pm On Jul 08, 2023
Creating revenue for boko haram and bandits

The Abuja-kaduna rail, you know how much bandits realized from that when they derailed the train, shot travelers and kidnapped some

This project should be canceled and rather cattle ranch built in that region for obvious reason, Niger repluboc doesn’t have any significant economic importance to Nigeria for that huge capital to be wasted

22 Likes 3 Shares

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by theophorus(m): 5:42pm On Jul 08, 2023
Train! Train!! Train!!!

Hope this project can repay the debt?
Hope Bandits will not render it useless?
Hope it won't be access for Terrorists invasion?

But Laslas Sha, make we see as everything go unfold.
Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by AlliedWork: 5:43pm On Jul 08, 2023

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by VinFreight: 5:44pm On Jul 08, 2023
Lets see the end result
Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by ArewaNightmare: 5:44pm On Jul 08, 2023
grin u can't tour round Nigeria through Land but government want to waste money to build rail way straight to desert 🏜️

9 Likes

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Zupay: 5:44pm On Jul 08, 2023
Nonsense!

Building railway into another Country!

Is Uganda not landlocked that they depend on Kenya's port for their sea cargoes and to ease things for them Kenyan Government had their railway line extended to their boundary with Uganda, for Ugandan government to continue from, to wherever they want it to terminate within Uganda but Nigeria is like a man who is yet to well provide for his children but sees nothing wrong with paying his side chick's bills while his children struggle.

9 Likes 1 Share

Re: N1.54trn Kano-Maradi Railway To Have Over 100 Bridges, 3 Side Camps by Whois(m): 5:45pm On Jul 08, 2023
Money miss road undecided

7 Likes

(1) (2) (3) (4) (5) (Reply)

How Oversized Medians Contribute To Traffic Bottlenecks On Lagos Roads (PIX) / Truck Driver Killed In Accident While Being Chased By Revenue Collectors (Pix) / Lagos-Ibadan Rail: FG To Demolish Parts Of Apapa Port Terminals - (Pics)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.