Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,211,893 members, 8,012,837 topics. Date: Monday, 25 November 2024 at 03:35 PM

Can ₦2M Finish The Construction Of A 2-Bedroom Flat? - Properties (6) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Can ₦2M Finish The Construction Of A 2-Bedroom Flat? (27306 Views)

Can 2M Be Enough For A Bachelor To Rent A House And Live Comfortably In Lagos? / The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process / The Construction Of The Abeokuta City Centre Begins (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by Strokes: 1:50am On Jan 31
pepericozi:


Why are you deceiving yourself. N19m?

Shit.

.
Let me break it down for you;
Strong foundation cos of the top flat. The iron alone..
Decking, the iron on the Decking also...
Borehole..
Roof loggings
Gerald roof
Plastering
Pop
Windows and balcony barricades plus stairs railings
Doors
POP
Tiles
Paintings
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by sunday0707(m): 5:22am On Jan 31
abbeynism:


It would take it to the roofing level as requested.

I estimated the building to take 2500 blocks.
Blocks: 2500 x 500 = 1,250,000
Cement: 35bags x 5600 = 196,000
Labour: N8000/100 blocks = N200,000
TOTAL: This is based on my personal experience and recent in IBADAN.



Laterite prices varies and you might get some from soak-away excavation.

It may not, gravel, granite, iron, wood for the lintel and the workmanship for welder and carpenter are still there, and all these are costly now. But it's a good thing he starts though, his mind will be there and he will complete the project.
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by RexTramadol1: 6:33am On Jan 31
Tpave:
Wahala.....Labour, cement, blocks, stones, iron rods, woods nails etc





Even sand and gravel.
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by abbeynism(m): 6:46am On Jan 31
sunday0707:


It may not, gravel, granite, iron, wood for the lintel and the workmanship for welder and carpenter are still there, and all these are costly now. But it's a good thing he starts though, his mind will be there and he will complete the project.

I have modify it. I don't think he needs gravel for the stage of the project and the question he asked.
If he will spend more than 2 millions to ge to the roof level, it won't be more than 100k. If it is Ibadan here. I will have small change left.
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by Blackman101: 9:19am On Jan 31
yes if building out of mud sand
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by ngwababe(f): 10:32am On Jan 31
If its only block work and roof, it should. The roofing should be flat roof o.
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by jmoore(m): 11:42am On Jan 31
Strokes:

Let me break it down for you;
Strong foundation cos of the top flat. The iron alone..
Decking, the iron on the Decking also...
Borehole..
Roof loggings
Gerald roof
Plastering
Pop
Windows and balcony barricades plus stairs railings
Doors
POP
Tiles
Paintings


If you use gold do the floor nko, I billion go complete am?

Person go ask if 20,000 naira fit buy phone, you go tell am how you bought iphone with 800,000 naira.

1 Like

Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by danzaki63: 12:11pm On Jan 31
almost impossible, except you will use mud bricks and have zero iron rods in your building, a ton of iron rods goes for 540k as at yesterday
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by charleskl(m): 9:06am On Feb 01
Ohkies..if its by these you listed, it will definitelybe more than
foliman:


1. Pipework
2. Soak-away pit
3. Water Closet, shower, washand basin
4. Water Tank + iron scalding


Bro, even the 500k is way too small.
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by agbolahan1991(m): 11:01am On Feb 01
arcnomec:


So in this modern era you are advising someone to do 2 courses foundation,1mm thickness of window frame,ply wood ceiling and 1" plastering thickness..


Haba,I expect better from you.Tell the Op the truth,for a comfortable 2bedroom design,that amount can only take him to a certain level..

Don't build any house that won't have aesthetic and economic value ,in case you want to sale it in future

Good morning
Thank u for the advise
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by jmichael259(m): 12:33pm On Feb 01
Roseodd:
Please can 2million naira finish 2 bedroom flat upto roofing level.
I will need urgent reply please.


Only possible for two straight rooms(in-house) or one room self-contained apartment.

Seriously Nigerians should learn to start first with just BQ one side of the fence or gate and pack in before carrying the main family house project. This is what helped us immensely and you won't believe how fast the project will be going up without stress when you're already around. Building no easy oO. Plan well.

1 Like

Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by Roseodd: 12:57pm On Feb 01
jmichael259:


Only possible for two straight rooms(in-house) or one room self-contained apartment.

Seriously Nigerians should learn to start first with just BQ one side of the fence or gate and pack in before carrying the main family house project. This is what helped us immensely and you won't believe how fast the project will be going up without stress when you're already around. Building no easy oO. Plan well.

Thank you!
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by bet9ja(m): 5:25pm On Feb 01
Cement is now 6k plus. Please recalculate
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by Roseodd: 9:02pm On Feb 01
ngwababe:
If its only block work and roof, it should. The roofing should be flat roof o.

Thanks ma

1 Like

Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by Roseodd: 9:02pm On Feb 01
bet9ja:
Cement is now 6k plus. Please recalculate

Alright thanks
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by ngwababe(f): 8:08pm On Feb 19
Roseodd:


Thanks ma

The price of cement now, I doubt if 2m can do anything. God help you.

1 Like

Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by ishadfurnitures: 10:48am On Apr 26
I can supply you wood for decking / Roofsvor all types of Various woods kindly chat 08099212590 we allow payment on delivery , note Delivery is not free
bet9ja:
I am currently contructing a 3 bedroom duplex, The master bedroom at the top is yet to be errected and the project has consumed 114 bags of cement already @rate of N5500 per bag with logistics = 632500. 9inc Blocks (Made with stone dust) at 435 X 1800 = 783000, Sharp sand and filling sand and granite has consumed like 800k + ... Workmanship and Omonile is not included ooo.... Half tons of iron --- 205000, another 17 pieces @ 5600 per 1.

I cannot even calculate again.


2million cannot complete it. But it will surely have hug impact.
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by Bowrichy: 4:40am On May 23
TempUser:
Yeah, with a plan like this.

What of with two toilets together with the bathroom in the Masters bedroom

1 Like

Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by TempUser: 4:33pm On May 23
Bowrichy:


What of with two toilets together with the bathroom in the Masters bedroom
Do you mean make both rooms en suite? That'd be cool, but if a visitor comes and wants to use the loo, he'd have to go into your room.
In that case, you can throw one toilet out of the other room and make it serve as toilet and bathroom for visitors and a room, then the other for the master bedroom
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by CreamKarim: 5:30pm On Oct 16
Hello EveryOne As at Today October 16 2024,
How much will complete a building,

4 units of 2bedroom Flats,
2 up, 2Down.
Assuming the most minimal design.

Please I'd appreciate an informed expert response.

Thanks
Re: Can ₦2M Finish The Construction Of A 2-Bedroom Flat? by ishadfurnitures: 6:29am On Oct 17
For your building construction project, Bill of Quantity( *BOQ *or Quotation chat a professional on 08099212590 note BOQ attract a token charges for you to get the accurate Labour and Materials Cost of your Building project thanks in anticipation :Note Serious Customers only [color=#990000][/color]
CreamKarim:
Hello EveryOne As at Today October 16 2024,
How much will complete a building,

4 units of 2bedroom Flats,
2 up, 2Down.
Assuming the most minimal design.

Please I'd appreciate an informed expert response.

Thanks

(1) (2) (3) (4) (5) (6) (Reply)

My Experience With A Landlord In Ibadan / Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad / Trapped Worker Rescued Alive 4 Days After Building Collapse In Rivers. Photos

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 35
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.