Geometric Power Plant In Aba Set For Commissioning In February by SoNature(m): 9:10am On Feb 01 |
Geometric Power Limited (GPL), an independent power generation company, located in Osisioma, Aba, Abia State, will be commissioned in February 2024, BusinessDay has gathered. Source: https://businessday.ng/news/article/geometric-power-plant-set-for-commissioning-in-february/ 26 Likes 2 Shares
|
Re: Geometric Power Plant In Aba Set For Commissioning In February by SoNature(m): 9:13am On Feb 01 |
Finally, some good news! Every state should have an independent power generation, transmission and distribution company. If you don't have gas, try hydroelectricity. Like Fashola once said, generating power shouldn't be some rocket science. Now, 9 out of the 17 LGAs in Abia will have guaranteed power supply. I hope they can afford to pay though. Power is not cheap. 113 Likes 12 Shares |
Re: Geometric Power Plant In Aba Set For Commissioning In February by christejames(m): 9:29am On Feb 01 |
I hope this comes through Congratulations to the Enyimba City and Ala-Igbo in general! 36 Likes 5 Shares |
Re: Geometric Power Plant In Aba Set For Commissioning In February by MrProlific95: 9:31am On Feb 01 |
SoNature:Power is not cheap 44 Likes 4 Shares |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Paraman: 9:36am On Feb 01 |
A good news for the people of Aba 44 Likes 1 Share |
Re: Geometric Power Plant In Aba Set For Commissioning In February by jmoore(m): 9:46am On Feb 01 |
Misleading headlines. Project like this needs to start working before any comissioning. Ask Dangote refinery. 13 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Faiththatworks(m): 10:30am On Feb 01 |
God bless Geometric Power Limited God bless NNPCL. This is a very big breakthrough for Nigeria on how to devolve Electricity from the Almighty Centralized Power Structure we have to the state Government and independent Power Producers. Geometric and Abia state have taken the lead in this Noble power generation and distribution and I hope other State and Local Government emulate this wonderful project. Nigerians have been scammed by all these useless So called Distribution companies and I'm in total support of anything that will allow individual states and local government to generate and distribute Electricity. I expect all other states to take the initiative and start building their own independent Power companies,state Governors must understand there's big correlation between Electricity and Development. Where there is enough Electricity in any state,there will be massive production of goods and this will eventually lead to a drop in unemployment of young people in any state. I really give kudos to Geometric Power Limited for this massive breakthrough,this is the kind of news we need to start hearing from other states in Nigeria. 27 Likes 2 Shares |
Re: Geometric Power Plant In Aba Set For Commissioning In February by StarRida: 1:35pm On Feb 01 |
Governor Otti the only performing Governor currently in the whole wide Nigeria......Eluuupe leads by example this is exactly what Nigeria and Nigerians lose may God never forsake us 49 Likes 2 Shares |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Melagros(m): 1:43pm On Feb 01 |
COMRADES, hope it's not a media commissioning which thereafter the people will continue living in darkness 2 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Artscollection: 1:48pm On Feb 01 |
jmoore: govt wahala was holding that company back, that plant was ready years back but emeka office didn't allow the take off because of some laws but currently they are operating at a low capacity i guess but the platvis running. 9 Likes 1 Share |
Re: Geometric Power Plant In Aba Set For Commissioning In February by IamAtikulate: 1:53pm On Feb 01 |
The plant is already working, but at below capacity. I think they have sorted their gas problems and are now set to operate at FULL capacity - 24/7 power supply. Aba is no longer on the national grid. The city now generates, transmits, and distributes it power. Our Yoruba brothers should learn how to develop their cities. 55 Likes 4 Shares |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Splashme: 2:24pm On Feb 01 |
Great |
Re: Geometric Power Plant In Aba Set For Commissioning In February by jmoore(m): 2:49pm On Feb 01 |
Artscollection:Aba power is different from geometric. Aba power is the distribution arm, geometric is the generating arm. Geometric is not generating any power. Aba power get its supply from TCN. Last year, geometric said it will start generating but they didn't fulfill it. That's why I said they should stop announcing plans. Let them generate the power first before announcement. 11 Likes 1 Share |
Re: Geometric Power Plant In Aba Set For Commissioning In February by gwdcodec: 4:06pm On Feb 01 |
jmoore: Please enlighten me, what will they use the gas for ? Or you use gas for transmission and distribution? 2 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by jmoore(m): 4:10pm On Feb 01 |
gwdcodec:The gas is to fuel their power station, so they can start generating power by themselves. 5 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by chopnaira: 4:27pm On Feb 01 |
Okay. |
Re: Geometric Power Plant In Aba Set For Commissioning In February by lexy2014: 4:27pm On Feb 01 |
SoNature: you don tire for kidnap news? 1 Like |
Re: Geometric Power Plant In Aba Set For Commissioning In February by chopnaira: 4:27pm On Feb 01 |
SoNature:I agree with you. Power stealing should also be curtailed. Nigerians are too corrupt and would start tapping the power without meters till the company finds it difficult to maintain the infrastructure. Then they will go ahead and accuse the company name gov as corrupt when power failure starts happening. 11 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Nchenches: 4:29pm On Feb 01 |
Geometric would have multiplied in its service if not for the CRAB MENTALITY in some Quota system politicians in Nigeria who find themselves easily at the high decision making quarters in Nigeria. Python will soon digest those who don't want others and themselves progress in modern development in this country. 5 Likes
|
Re: Geometric Power Plant In Aba Set For Commissioning In February by free2ryhme: 4:30pm On Feb 01 |
SoNature: when Arithmetic go commission their own plant 2 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by 007kjb: 4:30pm On Feb 01 |
Good news |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Dpharisee: 4:31pm On Feb 01 |
He is getting the gas from Abia which has abundant gas reserves 12 Likes 1 Share |
Re: Geometric Power Plant In Aba Set For Commissioning In February by tunde1200(m): 4:32pm On Feb 01 |
Esn no go like this development am sure. Children of hate |
Re: Geometric Power Plant In Aba Set For Commissioning In February by oshonky: 4:33pm On Feb 01 |
Can all the eastern states benefit from this or even start up theirs then they can leave the overhyped Lagos for the claimers 5 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by ppogba: 4:34pm On Feb 01 |
IamAtikulate: Your observation with Yoruba is undisguised. Best of luck 2 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Nawa4nl: 4:34pm On Feb 01 |
You see the igbos, on their own they will prosper 20 Likes 3 Shares |
Re: Geometric Power Plant In Aba Set For Commissioning In February by sameks08(m): 4:34pm On Feb 01 |
We in Aba has suffered to the anywhere we see light even if generator we rejoice 2 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by Seunpapa65: 4:34pm On Feb 01 |
Hope it works for them 1 Like 1 Share |
Re: Geometric Power Plant In Aba Set For Commissioning In February by melodyogonna(m): 4:35pm On Feb 01 |
StarRida:You think a power plant and gas pipeline (plus drilling facility) is built in 6 months? 6 Likes |
Re: Geometric Power Plant In Aba Set For Commissioning In February by vanitybutiwanti: 4:35pm On Feb 01 |
This project is unending 1 Like |
Re: Geometric Power Plant In Aba Set For Commissioning In February by nony43(m): 4:36pm On Feb 01 |
8 Likes |
Benneth Chinedum Igweh Is The New FCT Commissioner Of Police / My Critics Will Eat Their Words, Oyegun Replies Akande. / Hydro Plants Boost Electricity Generation To 3,686.3mw
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38 |