Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,371 members, 7,998,764 topics. Date: Sunday, 10 November 2024 at 06:54 AM |
Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4814494 Views)
Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)
(1) (2) (3) ... (3634) (3635) (3636) (3637) (3638) (3639) (3640) ... (3775) (Reply) (Go Down)
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 4:37pm On Mar 16 |
Help me, My tiler is charging me #900 per square meter. Is this not overcharging please? Project is in Ondo state |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bolu1986(m): 5:23pm On Mar 16 |
Pop & wall screeding We are available 07088534661 Note: real work pictures attached 1 Like 1 Share
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dongc(m): 6:00pm On Mar 16 |
mrphysics: What was the destination from quarry to your site since is same Ebonyi for the transportation fee of 100k ? Did you make any savings doing it this way than paying outright to a driver? What's was your major motivation? Accurate stone quantity or savings or both...cheers 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sekzy99(m): 8:15pm On Mar 16 |
ATLANTIC01: What’s the cost of this? |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sekzy99(m): 8:21pm On Mar 16 |
DFAMEGUY11S:kindly share the prices of your wc |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sekzy99(m): 8:31pm On Mar 16 |
michlins:how much for the front steel door? |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mrphysics(m): 8:32pm On Mar 16 |
dongc: Well, googles estimate of the distance is 20km and expects the time taken to reach the town to be 20mins from the quarry to the site's location. Lets even say 25km. I think the cost of transport is high. Overall, I think I saved money buying before their price increment and also getting the correct quantity. Previously, I give the driver money for 30 tons and he will probably buy either 20 tons or 22 tons. 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Balistic4: 12:49am On Mar 17 |
Guys, I've been afraid to do my electrical ever since I got this quote from my electrician. Please someone should help me check these. My house is 3 bedroom bungalow with 4 toilets. Are these materials too much? Can anyone supply me original and complete cable with warranty at cheaper rate? I'm in abuja
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 5:28am On Mar 17 |
MDDarah84: Might not be Tilers charge btw 750 - 1000 these days. The amount depends on his quality of work. Just negotiate to what you can afford. Goodluck 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by aieromon(m): 5:47am On Mar 17 |
Balistic4: - The number of coils is suspect. - Original cable is available for purchase from authorised distributors in Abuja. - The price quoted is on the low spectrum so you need to find out the name of the brand and decide if you are comfortable with it. 3 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 5:52am On Mar 17 |
Balistic4: Way too much IN MY OPINION. I say this having 2 things on mind. 1. My house is a duplex and I didn't buy this much 2. My electrical Engr did an estimate for another duplex recently and he didn't get this much cables (pls don't ask me to link him to you, he's not available) 3. 16mm is run from your meter to the DB - how far is that distance to require 2 coils (yes he needs red and black but a fraction of 1 is OK - not the full coil) eg you might need half of red and half of black. My comments are based on the 3 above - still seek advice from another electrical expert. Goodluck 5 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 6:25am On Mar 17 |
Akerewe: The answer is yes....most suitable for BIG size toilets / bath. You just need to make sure its Matt (non slippery) tiles. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 6:33am On Mar 17 |
oote: Hi. What's the answer you seek? Just start and find out.. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Akerewe(m): 6:49am On Mar 17 |
saydfact: Thanks for the insight Engineer but if pls why MATTE ON THE WALL not even satin. I never knew MATTE can work on bathroom wall. Its always polish on the wall 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 7:08am On Mar 17 |
Akerewe: Thanks for the correction.... My mind was on FLOOR TILES . Imy answer shd be a simple YES.... 60x60 can be used on toilet walls.. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 7:14am On Mar 17 |
Balistic4: Too much haba! But then looking at prices seems he quoted for all those cable that are barely 70meters in length 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DFAMEGUY11S(m): 8:26am On Mar 17 |
sekzy99:07087953771 for prices and picture |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ATLANTIC01: 8:51am On Mar 17 |
sekzy99: The size of your wall will determine the cost |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Akerewe(m): 9:13am On Mar 17 |
saydfact: Thanks for the insight chief, more Wisdom 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by kiekie1(m): 9:56am On Mar 17 |
SMARTCELL DISTILLED WATER & ELECTROLYTES NOW IN STOCK!! We are still committed to giving you the best quality of distilled water in the industry... Join us in our price slash promo .. We look forward to working with you Distilled water 25 Litres = N10,000 PER 25L GALLON (Selling with free 25L black Gallon)(BUY 2 GALLONS & GET 5L FREE) Distilled water 25 Litres = N12,000 PER 25L GALLON (Selling with free 25L white Gallon)(BUY 2 GALLONS & GET 5L FREE) Distilled water 5 Litres = N2,500 (Selling with free 5L gallon) (PROMO: BUY 12 units get 2 free) Distilled water 1 Litre (Dozen pack) = N8,000 (PROMO: BUY 12 packs & get 1 free) Hydrometer = N7,000 Electrolyte 5L = N4,000 Electrolyte 25 Litres = N18,000 (with free 25L Industrial Gallon) .. (BUY 2 GALLONS & GET 5L DISTILLED WATER FREE). Electrolyte is mixture of sulfuric acid & distilled water having predefined specific gravity or concentration per mol. Smartcell electrolytes maintains 1.265 - 1.280 specific gravity range. *Deionized H2O Analysis: *TDS = 0 - 0007 ppm *PH = 6.8 - 7.0 *APPLICATIONS: Smartcell deionized water is free of toxins, microbes , pollutants and can be used for: -Tubular battery periodic top up - Skin care formulation - Steam Iron - Soap making - Hand sanitizer production - Cleaning services - Laboratory - Automotive radiator Cooling Systems - Continuous positive airway pressure machines We're open for dealership discussions. Feel free to reach us via contact details below Warehouse Location: Winners estate, Abule-egba , Lagos (Estate is situated behind popular Solomon grace secondary schools ,off Abiodun Onitiri avenue) but can be dispatched to any state on buyers expense.. For further enquiry & purchase; Contact, Smartcell global services CALL LINE::::: 081-350-31951 WHATSAPP::: 081-703-85620
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Tee92(m): 11:06am On Mar 17 |
dongc:Good question. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 11:22am On Mar 17 |
Balistic4: The quantities are way too high Those rate are old rate except he's using imported or china cable You can send me the house plan and you will get the quantities of cables required... WhatsApp 08033643191 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Valuepaints20(m): 11:33am On Mar 17 |
Bankyshinani: Value paints pop Paint #6,000 |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 12:30pm On Mar 17 |
sekzy99:75,000 only 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Obnoxious2001(m): 12:43pm On Mar 17 |
Balistic4: Is there an electrical plan? E fit be say he still dey quote to wire him intellectual property as he dey work The reason this stuff is inflated is, the electrician plans to get the workmanship you will not agree to pay via wire . 3 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dongc(m): 1:05pm On Mar 17 |
mrphysics: Thank you for the response...Complete quantity beating price hike ~ at least peace of mind...extra savings with transportation cost would have made it even worthwhile....cheers 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dannie007(m): 1:23pm On Mar 17 |
The Quote is too Much Half of the Listed Quote will do the Job. 4 Bedroom Bungalow Right? Balistic4: 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Balistic4: 1:32pm On Mar 17 |
dannie007: Yes my boss |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Balistic4: 1:33pm On Mar 17 |
Obnoxious2001: I pay very well, maybe he felt there's more where the ones I sent to him is 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Balistic4: 1:34pm On Mar 17 |
topsy23: Alright, I will send it |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Balistic4: 1:35pm On Mar 17 |
twinskenny: Thanks a lot, I'll get halve the cables and find a way to monitor him |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Balistic4: 1:36pm On Mar 17 |
saydfact: So much wisdom here, thanks a lot 1 Like |
(1) (2) (3) ... (3634) (3635) (3636) (3637) (3638) (3639) (3640) ... (3775) (Reply)
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 45 |