Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,218,434 members, 8,037,969 topics. Date: Friday, 27 December 2024 at 12:13 AM |
Nairaland Forum / Nairaland / General / Properties / 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State (6158 Views)
Ogun Demolishes Illegal Structures In Kara Along Lagos Ibadan Expressway / FCTA Demolishes Brothels, Illegal Structures In Abuja / All Interior Redesign - Reconstruction Works of Dennis3D (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (Reply) (Go Down)
5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 5:31am On May 05 |
Hello Dear Nairaland Followers. We are pleased to announce to you the birthing of our latest Project to be located at Aro ndi Izuogu Kingdom in Okigwe Imo State. This project is going to spring up in between existing buildings in the premises. It's a 4 plot property and my client is trying to uphold the legacy of his father through the erection of a world class royal architectural marvel and at the same time we would be renovating all the existing structures namely, main building (Bungalow), Boys quarters and a palace. Our New Proposed Structures comprises of the following. - 5 Bedroom Royal Duplex all room ensuite. - 1 Storey Gate house with two self contain flats. - Gen House The proposed carcass cost of the proposed structures we are about to erect is - #80m Here also, we are bound to finish this project in 10months - 12months Max. We intend to do carcass for 3 - 4 Months Max and use the rest for finishing because we would be doing so much detailing during finishing. We would try to see how far and fast we will battle with the rainy season which we are into already to get that time frame actualized. Our Team are already on ground. We are doing our preliminary works of which some of it is as follows: - Changing the existing windows of the main building Bungalow - Doing a geological survey for borehole - We were given a depth recommendation of 300Fit for the borehole in this property for a cost of 3.8m because the ground has rocks beneath and rig will be used for the borehole operation. - Next will be for us to begin the main building setting out as soon as the borehole is set. Find attached the 3D model of this proposed project and keep in mind that we are going to build it with 99% accuracy level. Yes, you heard me. As usual we will be updating this thread on every activity of this project. So stay tuned with us on it. Thank you for 2 Likes
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 12:50pm On May 05 |
We urge you to follow this thread. Be the first to know how we are going to bring this structure to reality. We are sure you will have questions and comments to make the thread interactive enough. Thank you as you follow. |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by stnkembu(m): 4:25pm On May 05 |
Dennis3D: I'm seated already. 1 Like |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by jaszplus12(m): 7:23pm On May 05 |
Good luck... 1 Like |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 3:23am On May 06 |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 3:23am On May 06 |
jaszplus12: Thanks a bunch. 1 Like |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 3:24am On May 06 |
More views of this structure
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 6:15am On May 11 |
We have arrived at site. Everywhere is very bushy. So we will be doing site clearing first. There are lots of trees that will be uprooted and cut away so site clearing is gonna take up to 3 - 5 Days to prepare the ground. The Trees here are not small trees Find attached in the picture is the existing palace that we Will be remodeling much later in the project...
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 6:24am On May 11 |
Arial 3D Views of the Project.
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 4:12pm On May 11 |
We had a market survey today to ascertain the price of Things around the market here. From Planks, to woods, to irons. I was a bit surprised to discover that they have full standard irons and less standard irons here. The former to be full Guage and the later to be less than full diameter of the reinforcements. Anyways, by our standard, we will be going for full Guage because we can't put down or quality of works for any lesser cost. Of course it is pertinent to note that the cost of full Guage is always and normally more expensive than the less Guage.
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 1:36am On May 13 |
Documents for Construction set. Here we have Architectural Design, Structural Design, Electrical Design and Mechanical Design
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 7:48pm On May 15 |
We have started buying some materials We saw irons for these amounts here for Full Guage (Standard) 16mm - 16,800 12mm - 9,600 10mm - 7,400 8mm - 4,200 Binding Wire - 35,000 Cement - 7,500 Like this, we already bought reinforcements that will take us to the decking These prices were lesser than this as at last week when I made enquiry. Dollar rise again have started affecting prices here again in the east 1 Like
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 2:08am On May 17 |
More procurement is ongoing already and site preparation ongoing too. About 400 Bags of Cement is paid for and supplied for a start already by us. We have bought over 900 Lengths of irons from 16mm to 12mm, 10mm and 8mm. And 10! Bundles of binging wires are all available on site now. We don't intend to waste time or delay. 1 Like
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 2:10am On May 17 |
We have started forming our colum base basket, starter pillars and rings for the project as shown below. We have also visited some block industry in this area to ascertain the blocks we are going to be using as well. 1 Like
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 11:38am On May 18 |
We have started our colum base and starter colum reinforcements works. 1 Like
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by mufutau55(m): 4:51pm On May 19 |
Building is not for the faint of heart anymore o. Keep up the good job, Oga mi. Hajji M. 1 Like |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 2:50am On May 20 |
mufutau55: Definitely for sure. Inflation is shootings way up beyond the reach of the average man 2 Likes |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 2:52am On May 20 |
More materials are arriving. This is the sure Arial View... Remember we are doing three structures here. 1. Main Building Duplex 2. Gate house is one storey two self contains 3. Generator house
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 6:39am On May 22 |
Good day all. Keep following up with us |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by mufutau55(m): 12:34am On May 23 |
Where else could I be, if not with my Oga. Hajji M. 1 Like |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 10:39am On May 23 |
mufutau55: Good morning ogami Thanks for following through once again |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 10:18pm On May 23 |
We just did our first ground breaking today here after setting out the main Duplex and the security house. The soil is looking very strong and some stone in it.
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 3:35am On May 25 |
We are doing borehole too simultaneously. Estimated depth of the borehole is expected to be 300Fit. Hammer ridge is the type of machine recommended for drilling the borehole here because of the soil structure.
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 3:39am On May 25 |
Blinding of the gate house commenced immediately too... The soil here is a hard one and has stones in them. This reminds me of our project in Ile life few years ago. We experienced a similar soil structure.
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 3:41am On May 25 |
Remember we are doing all the structures simultaneously. The setting out of the main Duplex is also ongoing ahd the digging as well.
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 11:25pm On May 25 |
We are hitting the ground running will full speed. Gate house block works..
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 11:29pm On May 26 |
We have started the chaining of the foundation of the gate house.
|
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by ChybuzzDD(m): 6:39am On May 27 |
Dennis3D: How do you prevent these cements from hardening? 2 of my own just got hardened after 2months being stored in a well protected container with no drop of water or moisture |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 4:07am On May 28 |
ChybuzzDD: Good day sir. Well to be fair, it's almost impossible to store such volume without getting one or two hardened after a long period of no usage. However, in my case what I do is, I try as much as possible to use them fast. Because even if there Is no water penetrating there or something, the cement in itself might generate some level of heat energy which is what most likely happens especially when packed at such a close proximity to themselves. 1 Like |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by ChybuzzDD(m): 5:38am On May 28 |
Dennis3D: This must be what happened in my case Thanks for the feedback. 1 Like |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 8:08am On May 28 |
ChybuzzDD: Oh Yes |
Re: 5 Bedroom Royal Duplex by Dennis3D + 5 Other Structures in Okigwe Imo State by Dennis3D(m): 3:42am On May 29 |
Foundation Backfilling of the Gate House 1 Like
|
(1) (2) (3) (4) (5) (6) (7) (8) (Reply)
Half Plot Of Land With 3 Bedroom Flat Foundation Available At Agura In Ikorodu / 3bedrooms Bungalow At Southpoint Estate On Orchid Hotel Rd By Chevron Lekki / The Berry Court Magboro Now Selling!!! Beta Don Land Ooo!!!
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36 |