Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,208,505 members, 8,002,818 topics. Date: Thursday, 14 November 2024 at 06:22 PM

Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah (19467 Views)

The Eneka Duplex+ 3 Bedroom BQ / DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] / Construction Of A 6 Bedroom Duplex At Owerri (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (Reply) (Go Down)

Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 3:34am On Oct 13, 2014
Good morning all, we welcome you to a new day.

Details of the project are as follows:
Client: Nairaland Member
Plot size: 60 x120 feet

Architectural designs: SAMUEL AJOSE ENGINEERS LTD(architectural department)

Structural designs: SAMUEL AJOSE ENGINEERS LTD(structural department)

Mechanical designs : SAMUEL AJOSE ENGINEERS LTD(mechanical department)

Electrical designs : SAMUEL AJOSE ENGINEERS LTD(electrical department)

Fence work(Raft) + 4 bedroom duplex(raft) + 3 bedroom Bungalow(raft).

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 3:35am On Oct 13, 2014
We have an exisiting fence here so we brought it down so that we can have another fence with raft though the land is not waterlogged but we are doing raft to take adequate measure.

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by mufutau55(m): 3:37am On Oct 13, 2014
I guess I am the first to join the class... good measure on the fence.
Please don't forget to post the 3D of the project. Thanks.

Hajji Mufutau
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 3:40am On Oct 13, 2014
Next is trench excavation of the fence

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 3:45am On Oct 13, 2014
mufutau55:
I guess I am the first to join the class... good measure on the fence.
Please don't forget to post the 3D of the project. Thanks.

Hajji Mufutau

Yes, you are no. 1 in class, i will surely post the 3D of the project as soon as it is ready
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by chitown(m): 4:13am On Oct 13, 2014
Keep up the work sir. I will be a student in this class.
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by chitown(m): 4:14am On Oct 13, 2014
Keep up the good work sir!
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by agarawu23(m): 5:39am On Oct 13, 2014
nice job oga

I av taken a front seat. please try to indicate ur expenses step my step.

follower.
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 8:57am On Oct 13, 2014
chitown:
Keep up the work sir. I will be a student in this class.

you are welcome sir.
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 8:59am On Oct 13, 2014
agarawu23:
nice job oga

I av taken a front seat. please try to indicate ur expenses step my step.

follower.

welcome and i will try as much as possible to outline my expenses.

Regards,
Samuel

1 Like

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:10pm On Oct 14, 2014
we bought granite,cement and sharpsand.

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:16pm On Oct 14, 2014
wood and tank for storing water

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:20pm On Oct 14, 2014
Our store is ready

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:27pm On Oct 14, 2014
blinding for the fence: not exceeding 50mm thick; poured on earth surfaces

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:37pm On Oct 14, 2014
Reinforcement work

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:51pm On Oct 14, 2014
Formwork and reinforcement work ready to receive concrete

1 Like 1 Share

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 12:10am On Oct 15, 2014
pouring the.concrete

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by FADEO: 12:34am On Oct 15, 2014
Am in here reading with keen interest.
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by agarawu23(m): 5:05am On Oct 15, 2014
nice one
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 6:24am On Oct 15, 2014
Note: We are still working on the fence(raft) with height of 610mm=0.61m=2 feet.
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 6:26am On Oct 15, 2014
FADEO:
Am in here reading with keen interest.

Welcome boss.
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 6:26am On Oct 15, 2014
agarawu23:
nice one

thanks man

1 Like

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by lmmaculatecon: 6:51am On Oct 15, 2014
Am in class with my pop corn and pepsi....... cool

1 Like

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by topsy23: 6:57am On Oct 15, 2014
Boss weldone.....am here to learn the construction process too....but our major work is Electrical/Mechanical design and installation.

Our contact are

Phone: 08033643191, 08051750560
Whatsap: 08033643191
Bb pin: 2A9D23FF

You can also visit our thread: https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/9
Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 7:39am On Oct 15, 2014
topsy23:
Boss weldone.....am here to learn the construction process too....but our major work is Electrical/Mechanical design and installation.

Our contact are

Phone: 08033643191, 08051750560
Whatsap: 08033643191
Bb pin: 2A9D23FF

You can also visit our thread: https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/9

i will get in touch as at when due.

Regards,
Samuel

1 Like

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 9:28pm On Oct 15, 2014
We removed our formwork .
See our concrete fresh and levelled

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 9:40pm On Oct 15, 2014
more pics

1 Share

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 9:32am On Oct 16, 2014
arrival of blocks

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 10:34pm On Oct 16, 2014
setting our first line of block

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:19pm On Oct 16, 2014
more on the block setting

Re: Construction of 4 Bedroom Duplex +3 bedroom Bungalow At Ajah by Nobody: 11:25pm On Oct 16, 2014
we are progressing

(1) (2) (3) (4) (5) (6) (7) (Reply)

Lamentations From FESTAC As FHA Demolishes Buildings / Advantages Of Using Cement Boards When Building / Sloppy Or Flat/Hidden Roof: Which Is Better? (Pictures)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.