Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,209,867 members, 8,007,387 topics. Date: Tuesday, 19 November 2024 at 09:31 PM |
Nairaland Forum / Nairaland / General / Politics / FG Begins Second Section Of Enugu-p’harcourt Expressway (14664 Views)
FG Begins Process To Extradite James Ibori After Gaining Freedom From UK Prison / FG Begins Construction Of Benin-Auchi-Okene Road (Pics) / Breaking: P’harcourt Refinery To Commence Operations In July – NNPC GMD (2) (3) (4)
(1) (2) (3) (4) (Reply) (Go Down)
FG Begins Second Section Of Enugu-p’harcourt Expressway by ishiamu(m): 6:10pm On Mar 04, 2015 |
President Goodluck Jonathan, Wednesday, flagged off the second section of the Enugu-Port Harcourt Expressway stretching from Aba Rail/ Road Bridge crossing to Eleme Junction in Port Harcourt. The 41.4 kilometer road was awarded to the China Civil Engineering Construction Corporation at the cost of N34, 047, 096, 919.17 with a completion period of 30 months. Flagging of the project, President Jonathan represented by the Minister for Works, Chief Mike Onolememen, said the gesture was a demonstration of his avowed commitment to the development of road infrastructure in the country in line with the transformation agenda of his administration. He noted that the Enugu-Port Harcourt dual carriage way is an important North-South arterial highway route connecting so many important cities in the country. Jonathan said the highway constructed over 70 years ago was begging for total rehabilitation following enormous pressure on it as a result of increasing traffic flow, hence, the resolve of his administration to give it a face-lift. He noted with delight the progress of work on section one of the expressway, stretching from Lokpanta to Aba awarded in 2013, hinting that section three of the road spanning from Enugu to Lopkanta had already been awarded and would be flagged-off next week. The President said with the award of contract for the second and third sections of the road, “the entire stretch of the Enugu-Port Harcourt highway is now under total rehabilitation.” This he added was in response to “the cries and yearnings of the good people of the South-South and South East zones and indeed all Nigerians.” Onolememen in his own address which was read by the Director of Highway Planning and Development, Federal Ministry of Works, Mr. Bala Danshehu, said the total length of the road from Enugu to Port Harcourt is 218 kilometers. http://www.punchng.com/news/fg-begins-second-section-of-enugu-pharcourt-expressway/ 8 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by ishiamu(m): 6:11pm On Mar 04, 2015 |
Gej is working Apc is sabotagging #gej till 2019 56 Likes 3 Shares |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Mayor21(m): 6:18pm On Mar 04, 2015 |
Gej till 2019 43 Likes 2 Shares |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Mayor21(m): 6:19pm On Mar 04, 2015 |
ishiamu:broz u sef, u create post cme stil steal 1st spot again. 9 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Controlled(f): 6:22pm On Mar 04, 2015 |
back to Otuoke. too little too late 36 Likes 2 Shares |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by ozoigbondu: 6:23pm On Mar 04, 2015 |
Jonathan is working Children of anger and hate are busy hating. This is exactly why the south east has been locked down for jonathan The fresh air is moving through Enugu and it will contuine moving till 2019 #Teamfreshair #TeamNeverAgain GEJ till 2019 48 Likes 2 Shares |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Nobody: 6:24pm On Mar 04, 2015 |
Jonathan will continue to work till march 28th, he's a great man. On behalf of d nigerian youths, we say kip up d good work, ya deserve a second chance and ya will get it. 36 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Arch1: 6:25pm On Mar 04, 2015 |
Where |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by ishiamu(m): 6:27pm On Mar 04, 2015 |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by ozoigbondu: 6:29pm On Mar 04, 2015 |
Controlled:This nonsense must be blown away 32 Likes 1 Share
|
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Meringe(m): 6:30pm On Mar 04, 2015 |
Election fever. They are commissioning everything thing . Hope they will not commission death. I'm happy that Tinubu and others that formed APC did their work very well. I'm Igbo but I like the political calculations of tinubu. Since APC presented a real challenge, PDP n GEj has been on their feets. No more business as usual. The real politics of quality is about to be introduce in Nigeria , to be aided by the card reader of INEC. WONDERFUL!!! 45 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Controlled(f): 6:31pm On Mar 04, 2015 |
ozoigbondu: yes. D nonsense of PDP....... 19 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Nobody: 6:37pm On Mar 04, 2015 |
And they ask why do the SE support Goodluck en mass. 5 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by ozoigbondu: 6:38pm On Mar 04, 2015 |
Controlled:Child of anger and hate 9 Likes 1 Share
|
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Niwdog(m): 6:42pm On Mar 04, 2015 |
Controlled:nothing is too late here. 'Better late than never' aso villa till 2019 for gej 11 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Controlled(f): 6:43pm On Mar 04, 2015 |
ozoigbondu: lover of rogues n corruption.......... Sai Baba. 7 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Controlled(f): 6:44pm On Mar 04, 2015 |
Niwdog: anoda paper project to be ignored if he wins afta 28 March....... 14 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Ogonimilitant(m): 6:47pm On Mar 04, 2015 |
china road 1 Like |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by ozoigbondu: 6:50pm On Mar 04, 2015 |
Controlled:Worshippers of the god of corruption tinubu 6 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Niwdog(m): 6:54pm On Mar 04, 2015 |
Controlled:even if it is sand project, lets wait for 30mnt Pls don't quote me 1 Like 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Controlled(f): 7:06pm On Mar 04, 2015 |
Niwdog: na u take ya mouth talk am o............. |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Controlled(f): 7:08pm On Mar 04, 2015 |
ozoigbondu: grt Pipul neva worship others....... PDP r in powa........let dem charge him to crt..... 2 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by ozoigbondu: 7:12pm On Mar 04, 2015 |
Controlled: So you people will say jonah is targetting opposition 5 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Controlled(f): 7:15pm On Mar 04, 2015 |
ozoigbondu: Janadaft has been president 4 6yrs n 2 yrs as vp.why did he not arrest Tinubu or say anything.... 4 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Calculia: 11:07pm On Mar 04, 2015 |
lalasticlala FP |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by gsparks01(m): 11:11pm On Mar 04, 2015 |
waiting for PDP fan boys |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by condralbede(m): 11:12pm On Mar 04, 2015 |
ok....A very good welcome development for d people of SE and SS. GEJ till OBJ learn how to dribble and scores goal. 7 Likes 1 Share
|
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by EmmaOgbu(m): 11:12pm On Mar 04, 2015 |
Oga Jona, we the South-Eastern go need that Enugu-Onitsha road, its very very important to us. Pls look into it. 4 Likes 1 Share |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by LordMecuzy(m): 11:13pm On Mar 04, 2015 |
To be completed by GMB? 7 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by Whizpeter(m): 11:14pm On Mar 04, 2015 |
So the clueless president is finally getting some clues at the last minute... He should reserve them cos he'd be needing them at Otuoke Buhari till 2023 7 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by kensnoop: 11:14pm On Mar 04, 2015 |
Did I just make FP? Its my first time#Dancing. Ara ga Agba Ndi Ara by Nigga Raw# 2 Likes |
Re: FG Begins Second Section Of Enugu-p’harcourt Expressway by stnwani(m): 11:14pm On Mar 04, 2015 |
Although the rehabilitation of the road is coming quite late,considering the economic importance of that route,but I must applaud the effort of the federal govt in its decision to give that road a lift... Thank you GEJ for this kind gesture and I pray for the fulfilment of more democratic dividends! 4 Likes |
Army Launches "Thank You For Your Service" Initiative (Photos) / Press Statement No Violations In Approval Of N5.8b Emergency Fund / Imo Governorship: Uche Nwosu Heads To Tribunal, Blames APC For His Loss
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 24 |