President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by lalasticlala(m): 5:15pm On Mar 24, 2015 |
President Jonathan commissioning Phase 1 504MW Alaoji Power Station, in Abia State,Tues. Mar 24. https://mobile.twitter.com/abati1990/status/580378426697220096 8 Likes 1 Share
|
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by lalasticlala(m): 5:16pm On Mar 24, 2015 |
More 5 Likes
|
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by chemali: 5:19pm On Mar 24, 2015 |
Why don't I have light? He wants to dress like Buhari to win votes too. Chei 37 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by datguru: 5:19pm On Mar 24, 2015 |
GEJ IS THE CHANGE WE CAN SEE, WHAT OTHER CHANGE DO WE NEED ? GEJ TILL 2019 69 Likes 2 Shares |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by Nobody: 5:19pm On Mar 24, 2015 |
FTC.... Meanwhile .GEJ till 2019 36 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by Nobody: 5:19pm On Mar 24, 2015 |
Sai jonathan Even till election day ya kip on doing and performing ya duty as d president. 37 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by theorbiters: 5:20pm On Mar 24, 2015 |
Nice one Presido. A victory for all Nigerians 29 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by Nobody: 5:20pm On Mar 24, 2015 |
commissioning projects that are not working. Smh 36 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by Misogynist2014(m): 5:25pm On Mar 24, 2015 |
GMB will continue from where you stop. Bye . 52 Likes 2 Shares |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by englishmart(m): 5:25pm On Mar 24, 2015 |
till 2019 16 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by siegfried99(m): 5:27pm On Mar 24, 2015 |
Ok |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by Nobody: 5:27pm On Mar 24, 2015 |
4 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by macpetrus(m): 5:31pm On Mar 24, 2015 |
Transformation.... 9 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by gen2briz(m): 5:33pm On Mar 24, 2015 |
Elections for Nigerian dey sweet ooo.. See as our presido dey commission power plant and other projects up and down within 6 weeks. 22 Likes 1 Share |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by akinsadeez(m): 6:02pm On Mar 24, 2015 |
Kudos to him but Something tells me this might be one of the last projects he will commission before the wind of change blows him and Mama Peace back to Otuoke. 28 Likes 1 Share |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by CR77(f): 6:06pm On Mar 24, 2015 |
Good job oga jona GEJ till 2019 No be like buhari way lie for his affidavit. 14 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by LewisO: 6:06pm On Mar 24, 2015 |
See dem failure Jona everywhere! Sai Buhari #Sai Change #March4Buhari 22 Likes 1 Share |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by CR77(f): 6:06pm On Mar 24, 2015 |
that thing way dey talk to you na ghost....GEJ and PEJ till 2019 akinsadeez: 6 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by missbehave247(m): 6:06pm On Mar 24, 2015 |
GEJ till 2019 4 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by steppin: 6:06pm On Mar 24, 2015 |
Oga Jona is working...transformation continues. Nigeria ga-adi mma. GEJ till...APC sees the light. 10 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by Copee: 6:06pm On Mar 24, 2015 |
I hope this one will work and not be another scam like Osun. What he didnt do in 6 years he wants to to in 6 weeks. it shows people actually know what is right but just refuse to do them. Sorry Sir!!!! Its too late. GMB I Know, GMB I will vote. SAI BUHARI, SAI Baba 24 Likes 2 Shares |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by taiwoflb: 6:06pm On Mar 24, 2015 |
good, GEJ is working lets give him a chanch to continue his good deeds Buhari adopts Okechukwu as Ibo name SOURCE: http://www.e reporter.com.ng/index.php/political-news/item/4173-buhari-adopts-okechukwu-as-ibo-name 1 Like |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by ichidodo: 6:07pm On Mar 24, 2015 |
When you fix power,you fix Nigeria. 2 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by ToyozzieTohBad(f): 6:07pm On Mar 24, 2015 |
k |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by bigv(m): 6:07pm On Mar 24, 2015 |
Too late. I have always said that if the acclaimed missing 20billion dollars, the 21bilion raised by PDP for campaign, the purported 200billion to be used to bribe Tinubu to leave APC, and other alleged billions, that are more than enough. That these amount (everything) were put only in the power sector and Nigeria can boast of at least 12hrs of uninterrupted power supply everyday. I can say with all boldness that GEJ and the PDP would by now be sleeping with both eyes closed and be sure that the electorates would give them another chance. But unfortunately, we all know the rest of the story 8 Likes 1 Share |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by missbehave247(m): 6:07pm On Mar 24, 2015 |
Grow up now CR77: |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by obailala(m): 6:07pm On Mar 24, 2015 |
The speed with which Jonathan has been commissioning and re-commissioning already commissioned incomplete projects within these 6 weeks is amazing. How I wish we could be having elections every year, maybe Nigeria would have been like Singapore. Jonathan underestimated the strength of the opposition up until 2015 but after smelling the coffee, he has woken up to his responsibilities, albeit in a suspicious way. More projects have been commissioned in the last 6 weeks than in the last 5 years. To those not-too-smart Nigerians who wish the opposition didn't exist, if this isn't an advantage of having an opposition, I wonder what is. Sai Buhari for March 28th; I strongly believe the PDP will make a very good opposition even as they light the asses of APC for the next 4 years. God Bless Nigeria! 15 Likes |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by loomer: 6:08pm On Mar 24, 2015 |
Weldon |
Re: President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics by Sweetguy25: 6:08pm On Mar 24, 2015 |
Best president ever. Generating capacity heading towards 6000 megawatts. 4 Likes |
Faleke Picks Mohammed Audu As Running Mate / Buhari Lobbies N’assembly On Passage Of 2016 Budget / Governor Obaseki Inspects Armoured Personnel Carrier
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 20 |