Nairaland Forum / Nairaland / General / Politics / Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) (2180 Views)
Goodluck Jonathan Commissions 2nd Nkpogu Bridge With Wike (pics) / Mixed Fortunes As Electricity Generation Hits 4,068MW / Nigeria Hits 5,000MW Power Generation Mark (2) (3) (4)
Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 9:17pm On Mar 25, 2015 |
Energy supply in the country yesterday received a boost with the commissioning of Phase 1 of the Alaoji Poweŕ Plant located at Umuobasi Ukwu in Aba, Abia State, by President Goodluck Jonathan. With the commissioning of the 504.4 First Phase of the 1,074 megawatts combined cycle Alaoji Power Plant, the total energy available in Nigeria now stands at 5, 500 megawatts. Power from the plant would be evacuated to the national grid through Alaoji-Owerri-Nnewi-Onitsha power lines as well as the Alaoji-Ikot Ekpene 330 KV double circuit lines currently under construction. Similarly, power from the Alaoji plant wouldalso be evacuated through the new Ikot Ekpene sub-station to Ikot Abasi in Akwa Ibom State, as well as Ugwuaji power station in Enugu to Benue and Plateau states. Commissioning the plant, which holds the prospects for improved power supply to the commercial city of Aba, President Jonathan expressed optimism that it would boost industrial and economic activities in the South-East and adjoining states.Jonathan, who described power as key to the development of the economy, was full of joy that the project, almost truncated by an adverse report from the National Assembly, has come on stream. He assured that the second phase would soon be completed. The President said the NASS report was rather critical that he personally embarked on a fact-finding tour of the project as Vice President, only to discover that facts on ground were in sharp contrast with the report.An elated Abia State Governor, Chief Theodore Orji, heaped praises on Jonathanfor according the project the priority it deserved, adding that its realisation would fast- track industrial revolution in the South-East zone. The governor also commended the federal government for assisting tremendously in eradicating kidnapping, which almost stalled the project when insecurity pervaded Abia. Addressing the audience, Minister of Power, Professor Onyebuchi Nebo, noted that Jonathan’s exploits in the power sector remained unprecedented since the history of Nigeria. He pointed out that four of the 10 National Integrated Power Projects awarded since 2005 have already been completed and inaugurated by Mr. President. Nebo promised that the remaining six NIPP projects would be realised before the end of the year. The minister explained that the Jonathan administration inherited about 3,000 megawatts of electricity, which it has increased to 5,500 megawatts in its effortsto improve electricity supply in the country. He said that, in addition, 300 rural electricity projects executed by the Rural Electrification Agency nationwide were ready for inauguration. Managing Director of the Niger Delta Power Holding Company, builders of Alaoji plant, Mr. James Olotu, commended the President for giving indigenous engineers the opportunity to showcase their engineering prowess in handling the project. President Jonathan also visited a private power plant sited in Aba and owned by a immediate past Minister of Power, Professor Barth Nnaji, and expressed satisfaction with the level of work already done. Coordinating Minister of the Economy and Minister of Finance, Dr. Ngozi Okonjo-Iweala, National Chairman of the ruling Peoples Democratic Party (PDP), Alhaji Adamu Muazu, and immediate past governor of Anambra State, Mr. Peter Obi, were among dignitaries in the President’s entourage. http://newsexpressngr.com/news/detail.php?news=10313&title=Electricity-generation-hits-5,500-megwatts-as-Jonathan-commissions-Alaoji-(Aba)-Power-Plant 1 Like |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by 42n8dzydoo(m): 9:18pm On Mar 25, 2015 |
That's on paper jor 6 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by WisdomFlakes: 9:22pm On Mar 25, 2015 |
Upon say the megawatts dey so-called 'increase' still no 'light'. Scam transformation. *hiss* 4 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 9:27pm On Mar 25, 2015 |
42n8dzydoo: if its negative news about Gej's administration, will you be saying the same thing 8 Likes 1 Share |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by 42n8dzydoo(m): 9:29pm On Mar 25, 2015 |
xrisdon:No, because those ones manifest! 3 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 9:39pm On Mar 25, 2015 |
42n8dzydoo: Lol, the president is actually doing a nice job! we should commend him for that. 3 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by phlemzy: 9:48pm On Mar 25, 2015 |
Fresh Air is loading!!!! All these power generated in prints will soon be a thing of the past. We have endured the lies for too long! 5 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by hazvat(f): 9:53pm On Mar 25, 2015 |
Mega scam not megawatts. Keep deceiving yourself! . 4 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Ahmed0336(m): 9:57pm On Mar 25, 2015 |
for paper abi? my area never see light for over two weeks now 4 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by otokx(m): 10:02pm On Mar 25, 2015 |
Ahmed0336: Your own is good; come to PH and see how darkness is smilling on us. 3 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Ahmed0336(m): 10:08pm On Mar 25, 2015 |
otokx:Guy, from december to febuary we ve been enjoying 22hr of electricity daily but as we enter march nna men I givvveeeee up 3 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 10:09pm On Mar 25, 2015 |
Ahmed0336: there's no light in your area doesn't make it to be untrue. remember your area is just a small part of your town; your town a small part of your state, and your state a small part of Nigeria. 2 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by gen2briz(m): 10:12pm On Mar 25, 2015 |
Se them add omotosho own join. |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Nobody: 10:18pm On Mar 25, 2015 |
Everything is in the pipeline coming, Nigerians should be patience- Desiani Alison Maduekwe |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by dagbokoncept(m): 10:24pm On Mar 25, 2015 |
Illiterates have taken over nairaland, they are so daft to the extent that they can't differentiate between power generation and distribution . Power distribution is even a more difficult task than generation and also gas is needed to power turbines which is not readily available in substantial quantity. All this am very optimistic that Buhari never hear am before and he dey shout change. Nigerians shine your eyes , our wahala no need change, so support transformation. Gej till 2019! 2 Likes 1 Share |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by abacrested(f): 10:34pm On Mar 25, 2015 |
42n8dzydoo:too much of everything is very bad, |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 10:36pm On Mar 25, 2015 |
dagbokoncept: Tell them more, they thought that if buhari comes and shout change! change!! every thing will start changing. 1 Like |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 10:50pm On Mar 25, 2015 |
hazvat: what makes it to be a scam? 1 Like |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by egift(m): 10:52pm On Mar 25, 2015 |
On paper Capacity that does not reflect on the light in my house is useless. I will not be surprise if on election day we hear it is now 10,000 mw. |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by egift(m): 10:54pm On Mar 25, 2015 |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Rossikk(m): 10:59pm On Mar 25, 2015 |
egift:Mr Self-centered. You are only 1 out of 170 million people. 2 Likes |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by gentlesinna(m): 11:04pm On Mar 25, 2015 |
All hail Mr president, nyc one man. Haters should kiss our aass |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 11:06pm On Mar 25, 2015 |
egift: anything that will make you feel good 1 Like |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Rose2014: 11:07pm On Mar 25, 2015 |
post=31990337: |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by egift(m): 11:25pm On Mar 25, 2015 |
Rossikk: That I want electricity getting to my residence should not be too much to ask. When I see reduction in fuel consumption and all the generator noise around me stopping, I will know that it has increased. It is not good I only have to read it on newspaper. |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Nobody: 11:31pm On Mar 25, 2015 |
dagbokoncept: Abeg leave that generation vs distribution grammar jare. Understanding either of them does not change the fact on ground. Your master promised to give people light , how he does that is entirely his business; thats why he was voted. Besides, even Mr clueless admits he is incapable of generating even 1/5 of the Megawatts he promised Nigerians in 2011 which is the "simplest task" according to you. If he's incapable of this, how do we expect him to implement the "rigorous" process of power distribution? Gej govt is simply an epitome of ineptness. |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Dmano: 11:36pm On Mar 25, 2015 |
Some ppls are foolish 2 d extend once d hear of capacity generation d belief light should enter thier house even those with mo wire in their house wil stil shout where is light 1 Like |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by Abagworo(m): 11:37pm On Mar 25, 2015 |
otokx: I toured Aba, Enugu and Owerri and I guess the poor power supply is not peculiar to Port Harcourt. The rural areas seem to enjoy better power though. |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by dagbokoncept(m): 11:40pm On Mar 25, 2015 |
Maple:You have to understand the difference between magic and miracle. Miracle doesn't come as fast as we opt for but its permanent while magic do come quick and disappear within a twinkle of eye. Gej is biulding solid foundations and same time correcting the woes of past administrations. Tell me when last did any administration biuld power plants and injection substations? It is a gradual process, some of the completed power peojects are working. In kano and kaduna power supply hardly goes off. Gej is not a magician that will provide power within a twinkle, it takes time and soon it will reach larger area . 1 Like |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 11:44pm On Mar 25, 2015 |
Dmano: thats the mentality of some people, so pathetic. |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 11:46pm On Mar 25, 2015 |
Dmano: thats the mentality of some people, so pathetic |
Re: Electricity Generation Hits 5,500 Megwatts As Jonathan Commissions Alaoji (aba) by xrisdon(m): 11:56pm On Mar 25, 2015 |
gentlesinna: |
I’m Ready To Abandon Inherited Economic Policies, Says Buhari / Buhari Will Achieve In 2 Years What Jonathan Failed To Achieve In 6 Years / The Significance Of Iwude Ijesa Festival
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 40 |