(1) (2) (Reply) (Go Down)

A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:51pm On May 14, 2015
Good evening room....here is a new project I am handling for a good client i met here on nairaland.
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:02pm On May 14, 2015
job: construction of the substructure( from foundation footings to DPC level)

project duration: 2 weeks

job descriptions: ground floor ; Two bedrooms, entrance porch, main lounge, dinning room, kitchen, gymnasium

First floor; five bedrooms, family lounge, study room.

floors plans and elevation to follow
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by mufutau55(m): 11:16pm On May 14, 2015
Another expert Contractor/Builder who knows his job.
Faithfully following this thread to learn how to save money on building project. Keep it up.

With permission, please post the 3D.

Hajji M.
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:26pm On May 14, 2015
mufutau55:
Another expert Contractor/Builder who knows his job.
Faithfully following this thread to learn how to save money on building project. Keep it up.

With permission, please post the 3D.

Hajji M.

welcome sir...it is always a honor to see your comment sir.

1 Like

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:47pm On May 14, 2015
here are some of the drawings
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:58pm On May 14, 2015
Day one (09-05-2015): Foundation setting out using profile board.
Materials: 4 bundles of peg @ N500/bundle = N2,000
30nr of 2'' x 2'' soft wood as profile @ N180/nr = N5,400
20nr of line @ N150/nr = N3,000
6 pound weight of 3'' nail @ N150/pound weight = N900
1 carpenter and 1 labour = N5,000
miscellaneous = N5,000
Total =N21,300


below are the pics from the setting out

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:07am On May 15, 2015
Day 2: excavation of foundation trenches.

Calculated perimeter of excavation = 180m
Actual perimeter of excavation = 173.5m
Rate of excavation @ N600/m
Duration of trenches excavation = 1 day

here are the pictures below

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:08am On May 15, 2015
more pics

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:09am On May 15, 2015
final excavation pics

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:17am On May 15, 2015
Tomorrow, we will be looking at the preparation of the starter bars ( foundation columns ) and the basket (pad footing columns reinforcement).We will also be looking at the excavation of pad footing base.
No of column footings = 29nr
No of starter columns =31nr
No of pad footings =29nr
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by Nobody: 9:09am On May 15, 2015
Quite impressive I assert Abdulwastecx, I would love to be part of this team.Am an Architect with a specialization in outsource of roof installation services ( stone coated). Please, would love to hear you soon. Thumbs up again!
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:44pm On May 17, 2015
completion of excavation: Here the column base were excavated to the required level.

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:46pm On May 17, 2015
more picture

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:52pm On May 17, 2015
item two: preparation of foundation pad base reinforcement ( basket) and foundation columns reinforcement ( column starter).
the column/pad base is of 1200mm x 1200mm.
made of Y16 bar ( high yield bar)
with spacing of 200mm (10"wink center to center.
there are 12 bars each per base
the length of each bar before bending into shape = 150mm + 1100mm +150mm = 1400mm
since the length of a bar of iron is 12m. one and half length will be required to complete a typical base of 1200mm x 1200mm

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:00pm On May 17, 2015
starter column: column dimension of 225mm (9"wink x 225mm(9"wink
300mm + 2700mm = 3000mm
one length of 12m will produce one starter column because a column must have at least 4 bars symmetrical placed.
the lings(ring) length of the column = 700mm, making a closed ring of 175mm x 175mm
Y10 bar was used for the column links and the links were spaced at 200mm c/c

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by twinskenny(m): 11:04pm On May 17, 2015
following nicely

and in case you need our services at later stage.. dont hesitate to call us.

contact and description on signature.

weldone sir
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:24pm On May 17, 2015
twinskenny:
following nicely

and in case you need our services at later stage.. dont hesitate to call us.

contact and description on signature.

weldone sir

ok sir
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:27am On Jun 05, 2015
resumption of work after two weeks delay due to some technical issues.
day 1:
job description : 50mm blinding to column/pad/isolated footing
the mix ratio of the blinding = 1:3:6
thickness of blinding = 50mm (2"wink
calculate number of bags to be used = 10bags
actual bags used due to increase in the size of footing =12bags

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:36am On Jun 05, 2015
day 2: mounting and casting of the foundation column and strip footing to retain the foundation block wall: there are twenty-six foundation column of 1.2m x 1.2m each

materials:
gravel = 30tonnes of gravel
sand = 2 trip of sharp sand
cement = 95 bags of cement

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:37am On Jun 05, 2015
more pics

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:54am On Jun 05, 2015
day 3:
laying of foundation block:
expected number of block for the foundation = 1600blocks
size of foundation block = 9"
mix ratio of mortar = 1 : 6 ( one bag to twelve head pan of sand)

about ten good bricklayer were employed for this task, each with responsibility to lay 100 blocks daily. this approach was used to allow for proper supervision of the block wall.

observation:
one bag of cement was able to lay between 45-50 blocks
the mason were mandated to use top and side line in other to have a straight and uniform level throughout the foundation.

here are the pictures below

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:55am On Jun 05, 2015
more block work

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:58am On Jun 05, 2015
more pics

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:05am On Jun 05, 2015
more

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:06am On Jun 05, 2015
more pics

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:10am On Jun 05, 2015
final pictures after yesterday work

1 Like

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by twinskenny(m): 11:53am On Jun 05, 2015
Weldone Engr.


Good job

1 Like

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by briliantsak(m): 1:45pm On Jun 07, 2015
Well done bro...You are indeed versatile

1 Like

Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by Onuokwu: 5:56pm On Jun 25, 2015
What happened to this project? Was it discontinued or there is a pause in proceedings?
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:11pm On Jun 25, 2015
the client want to rest for sometime due to money

(1) (2) (Reply)

Hottest Land Offers At Ibeju Lekki / Own An Apartment Immediately After Lekki Free Trade Zone,ibeju Lekki / For Sale: 1 Acre Land @ Ebute, ikorodu, Lagos (off Ibeshe Road)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.