A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:51pm On May 14, 2015 |
Good evening room....here is a new project I am handling for a good client i met here on nairaland. |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:02pm On May 14, 2015 |
job: construction of the substructure( from foundation footings to DPC level) project duration: 2 weeks job descriptions: ground floor ; Two bedrooms, entrance porch, main lounge, dinning room, kitchen, gymnasium First floor; five bedrooms, family lounge, study room. floors plans and elevation to follow |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by mufutau55(m): 11:16pm On May 14, 2015 |
Another expert Contractor/Builder who knows his job. Faithfully following this thread to learn how to save money on building project. Keep it up. With permission, please post the 3D. Hajji M. |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:26pm On May 14, 2015 |
mufutau55: welcome sir...it is always a honor to see your comment sir. 1 Like |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:47pm On May 14, 2015 |
here are some of the drawings |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:58pm On May 14, 2015 |
Day one (09-05-2015): Foundation setting out using profile board. Materials: 4 bundles of peg @ N500/bundle = N2,000 30nr of 2'' x 2'' soft wood as profile @ N180/nr = N5,400 20nr of line @ N150/nr = N3,000 6 pound weight of 3'' nail @ N150/pound weight = N900 1 carpenter and 1 labour = N5,000 miscellaneous = N5,000 Total =N21,300 below are the pics from the setting out
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:07am On May 15, 2015 |
Day 2: excavation of foundation trenches. Calculated perimeter of excavation = 180m Actual perimeter of excavation = 173.5m Rate of excavation @ N600/m Duration of trenches excavation = 1 day here are the pictures below
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:08am On May 15, 2015 |
more pics
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:09am On May 15, 2015 |
final excavation pics
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 12:17am On May 15, 2015 |
Tomorrow, we will be looking at the preparation of the starter bars ( foundation columns ) and the basket (pad footing columns reinforcement).We will also be looking at the excavation of pad footing base. No of column footings = 29nr No of starter columns =31nr No of pad footings =29nr |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by Nobody: 9:09am On May 15, 2015 |
Quite impressive I assert Abdulwastecx, I would love to be part of this team.Am an Architect with a specialization in outsource of roof installation services ( stone coated). Please, would love to hear you soon. Thumbs up again! |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:44pm On May 17, 2015 |
completion of excavation: Here the column base were excavated to the required level.
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:46pm On May 17, 2015 |
more picture
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 10:52pm On May 17, 2015 |
item two: preparation of foundation pad base reinforcement ( basket) and foundation columns reinforcement ( column starter). the column/pad base is of 1200mm x 1200mm. made of Y16 bar ( high yield bar) with spacing of 200mm (10" center to center. there are 12 bars each per base the length of each bar before bending into shape = 150mm + 1100mm +150mm = 1400mm since the length of a bar of iron is 12m. one and half length will be required to complete a typical base of 1200mm x 1200mm
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:00pm On May 17, 2015 |
starter column: column dimension of 225mm (9" x 225mm(9" 300mm + 2700mm = 3000mm one length of 12m will produce one starter column because a column must have at least 4 bars symmetrical placed. the lings(ring) length of the column = 700mm, making a closed ring of 175mm x 175mm Y10 bar was used for the column links and the links were spaced at 200mm c/c
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by twinskenny(m): 11:04pm On May 17, 2015 |
following nicely and in case you need our services at later stage.. dont hesitate to call us. contact and description on signature. weldone sir |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 11:24pm On May 17, 2015 |
twinskenny: ok sir |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:27am On Jun 05, 2015 |
resumption of work after two weeks delay due to some technical issues. day 1: job description : 50mm blinding to column/pad/isolated footing the mix ratio of the blinding = 1:3:6 thickness of blinding = 50mm (2" calculate number of bags to be used = 10bags actual bags used due to increase in the size of footing =12bags
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:36am On Jun 05, 2015 |
day 2: mounting and casting of the foundation column and strip footing to retain the foundation block wall: there are twenty-six foundation column of 1.2m x 1.2m each materials: gravel = 30tonnes of gravel sand = 2 trip of sharp sand cement = 95 bags of cement
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:37am On Jun 05, 2015 |
more pics
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:54am On Jun 05, 2015 |
day 3: laying of foundation block: expected number of block for the foundation = 1600blocks size of foundation block = 9" mix ratio of mortar = 1 : 6 ( one bag to twelve head pan of sand) about ten good bricklayer were employed for this task, each with responsibility to lay 100 blocks daily. this approach was used to allow for proper supervision of the block wall. observation: one bag of cement was able to lay between 45-50 blocks the mason were mandated to use top and side line in other to have a straight and uniform level throughout the foundation. here are the pictures below
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:55am On Jun 05, 2015 |
more block work
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 6:58am On Jun 05, 2015 |
more pics
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:05am On Jun 05, 2015 |
more
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:06am On Jun 05, 2015 |
more pics
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:10am On Jun 05, 2015 |
final pictures after yesterday work 1 Like
|
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by twinskenny(m): 11:53am On Jun 05, 2015 |
Weldone Engr. Good job 1 Like |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by briliantsak(m): 1:45pm On Jun 07, 2015 |
Well done bro...You are indeed versatile 1 Like |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by Onuokwu: 5:56pm On Jun 25, 2015 |
What happened to this project? Was it discontinued or there is a pause in proceedings? |
Re: A New Nairalander's Building Project At Borrow Pit Port Harcourt by abdulwastecx(m): 7:11pm On Jun 25, 2015 |
the client want to rest for sometime due to money |
Water Resistant Bathroom Doors. / Cheap Lands In Owerri / Affordable Plumbing Or Plumber Works In Lagos and Nationwide
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26 |