Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 1:51pm On Jun 17, 2015 |
EPCM Engineers Limited has created an Engineering Forum for Innovation that will jump-start the development of Nigeria in Engineering and Technology. Engineering quizzes(oil/gas and related technology based questions) of the week will be posted and prizes will be won by registered member. Visit http://fedpforum.epcmengineers.com to register |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 1:57pm On Jun 17, 2015 |
Engineering Quiz of the Week. / Week 1: 7 Simple Objective Questions! « Last post by ffadmin on June 15, 2015, 03:15:24 AM » 1. The Process Flow Diagram(PFD) will typically include which of the following A. Relief Valves B. Utility Lines C. Maintenance Valves D. Control Valves E. Spectacle blind |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by MacMaster01(m): 2:23pm On Jun 17, 2015 |
Nigel1:utility lines?? |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 2:36pm On Jun 17, 2015 |
@mac master kindly register on the forum and send in your answer. Thanks |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 11:59am On Jun 19, 2015 |
2. Put the following tasks in correct sequence (First to Last) A. HAZOP Study B. P&IDs: Issued for HAZOP C. P&ID Design Review/workshop D. P&IDs: Issued for Construction (IFC) 3. The design and construction code applied in the Oil & Gas industry for pressure vessels is A. API 5L B. ASME B31.3 C. ASME Code Section VIII D. API 14C E. ASME B31.4 4. Piping and Instrumentation Diagrams are developed from Equipment Plot Plans. TRUE/FALSE. 5. The wall thickness of a given line pipe can be completely specified by which of the following? A. Pipe Schedule B. Pipe Material Density and Minimum Yield Strength C. Pipe OD and Weight Class D. Pipe ID E. Pipe Nominal size and Schedule 6. Which comes first, Block Flow Diagrams or Process Flow Diagrams? 7. Which of the following is not a component in a typical Safety Instrumented System/loop: A. PRESSURE TRANSMITTER B. PRESSURE RELIEF VALVE C. PROCESS LOGIC SOLVER D. EMERGENCY SHUT-DOWN VALVE (ESD) |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 12:15pm On Jun 19, 2015 |
Oil and Gas Engineering and Innovation
|
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 12:26pm On Jun 19, 2015 |
The picture depicts above is a three phase oil and gas separator designed and constructed by EPCM Engineers Limited via Engineering Innovation and Development. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nobody: 2:12pm On Jun 19, 2015 |
Nigel1:Awesome.. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 6:04pm On Jun 28, 2015 |
Engineer in our Oil and Gas Facilities
|
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 6:09pm On Jun 28, 2015 |
Question for the week: What single innovation, in your opinion, will jump-start the development of Nigeria in Engineering and Technology? |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 4:51pm On Jul 04, 2015 |
Happy weekend NLanders, Kindly register on the forum to get the latest quiz questions. Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 4:53pm On Jul 04, 2015 |
Happy weekend NLanders, Kindly register on the forum(http://fedpforum.epcmengineers.com ) to get the latest quiz questions. Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 12:01am On Jul 07, 2015 |
This week's prize is $25 1. Attempt the weekly quizzes and stand a chance to win the weekly prizes! 2. Send all answers/solutions via forum Private Messaging to "ffadmin" on or before 23:00hrs WAT on Saturday. 3. The winning criteria is first correct entry received. 4. Weekly winners will be published on the forum every Wednesday. 5. Winners will be contacted via email. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 4:11pm On Jul 20, 2015 |
1. During a troubleshooting exercise, to increase the production rate from a given oil well, three different choke settings were made but the production rate did not change. With no other information provided, which of the following statements must be TRUE? a. The well production is using an ESP (Electric Submersible Pump) b. The flowline is of nominal size 6” c. The well is producing significant sand d. The ratio of Flow Line Pressure (FLP) to Flowing Tubing Head Pressure (FTHP) in all three cases were each less than 0.55 e. The Closed-in Tubing Head Pressure (CITHP) is less than 1,440 Psig f. The well has a GOR greater than 0 SCF/Barrel 2. A reciprocating pump with a rated Head/pressure of 100 Barg, is connected to a 12” x 35km export pipeline. During the pump/pipeline pre-commissioning inspection, an ANSI 16.5 flange of the following configuration was found (via measurement) installed upstream of the pipeline pig launcher: Flange Diameter= 19”, Number of Bolt holes= 12, Flange thickness: 1 ¼ “ Is there a problem with this finding, YES/NO.? GIVE REASONS FOR YOUR ANSWER. 3. A 30”OD x 8’ S/S 3-Phase separator is used by a well test company for leased well-test operations. When testing a certain well, the vessel was able to successfully test a well with an oil rate of 2,500 BOPD. When used on another well, they found that it could not efficiently test a well producing at 1,500 BOPD. Is this condition a possibility? If YES, List at least four (4) factors that can possibly contribute to this scenario. 4. In an offshore Production Platform, what is the name of the motorized device that is used in Emergency Evacuation and Escape? 5. In the selection/sizing of a pump, what is the name of the graph that MUST be generated by the design engineer, to ensure proper pump design? 6. When two Centrifugal Pumps are connected in series, what is/are the critical consideration(s) that MUST be considered to avoid pump damage through overpressure? a. MAWP of piping system b. MAWP of lead Pump Casing (Pump in front) c. MAWP of Lag Pump Casing (Pump behind) d. Check Valves on discharge piping e. Position of first isolation valve on pump discharge 7. Which of these factors must be considered in locating a flare in an offshore platform: (Select ALL that apply) a. Maximum gas release rate b. Predominant Wind direction c. Maximum Thermal Solar Radiation level d. Produced water rates e. Production GOR f. None of the above ONLY 100% Correct Answer wins the START prize. Highest Score for all entries, but below 100% wins only 50% of Quiz Prize of $70 Send your answers via forum Private Messaging to "ffadmin". |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 5:06pm On Jul 20, 2015 |
Last week's Quiz winner, is 'Rufmum'. He got 6 correct answers out of the 7 questions. He wins the week's $25 prize cash. ..... This week's Quiz prize is $100!!! Send in your answers to this week's quiz and stand a chance to win. Winner(s) will be published next week Wednesday. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 12:20pm On Jul 22, 2015 |
Week of July 12-18, 2015 Quiz Winner: Ostephen. No member met the target 100% score. However, the highest score of 5 out of 7 was by OStephen. He is awarded the week's $100 cash prize. However, going forward, only respondents who score 100% (7 out of 7 correct answers) qualify for consideration for the top prize. Top scores which fall below 100% shall receive only 50% of prize but only for a minimum score of 6 out of 7. The target remains Excellence. 1 Like 1 Share |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 4:59pm On Jul 22, 2015 |
QUIZ OF THE WEEK: Last week's prize was $100! Congrats to Ostephen! This week's prize is $70! Answer only 7 questions to win. Hurry to http://fedpforum.epcmengineers.com now! First correct set of answers received wins! |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 5:01pm On Jul 22, 2015 |
Hello Nlanders, Kindly submit answers on http://fedpforum.epcmengineers.com for this week's question. Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 10:17am On Jul 23, 2015 |
QUIZ OF THE WEEK: Few more days to go! Visit http://fedpforum.epcmengineers.com/ for a chance to win the $70 prize this week! Remember, first correct set of answers received wins! |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 3:38pm On Jul 23, 2015 |
DEBATE OF THE WEEK: This Week's Topic - As an Engineer, if you had the opportunity to change one thing in Nigeria, what would you Change? Join the interesting conversation going on at http://fedpforum.epcmengineers.com/ now! For periodic updates; Follow us on TWITTER: @FEDPForum FACEBOOK: FEDP Forum |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nobody: 4:30pm On Jul 23, 2015 |
Nigel1 please I'm experiencing difficulty in submitting or responding to ffadmin on that forum...pls kindly attend to it. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 5:01pm On Jul 23, 2015 |
adeoti01: Kindly send an email explaining your challenges to fedpforum@epcmengineers.com. The forum administrators will respond accordingly. Sorry the inconveniences experienced. Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nobody: 5:23pm On Jul 23, 2015 |
Nigel1: Alright....I thank you. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 6:07pm On Jul 23, 2015 |
You are welcome |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 10:51am On Jul 24, 2015 |
DEBATE OF THE WEEK: This Week's Topic - As an Engineer, if you had the opportunity to change one thing in Nigeria, what would you Change? Join the interesting conversation going on at http://fedpforum.epcmengineers.com/ now! For periodic updates; Follow us on TWITTER: @FEDPForum FACEBOOK: FEDP Forum 1 Like 1 Share |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 5:11pm On Jul 25, 2015 |
Connect with a group of Uber-Intellectual, Legendary and Ultra-Smart Engineers (Oil, Gas, Power & Systems) around the world. Share Innovative Ideas, Engineering Challenges and Solutions. Visit http://fedpforum.epcmengineers.com Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 11:30am On Jul 27, 2015 |
Dear Nlanders, Can Nigeria successfully adopt the Singaporean model to develop the economy? Provide a brief support to your viewpoint. Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 5:19pm On Jul 27, 2015 |
Oil and Gas Pilot Plant Facilities
|
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 6:02pm On Jul 27, 2015 |
Connect with a group of Uber-Intellectual, Legendary and Ultra-Smart Engineers (Oil, Gas, Power & Systems) around the world. Share Innovative Ideas, Engineering Challenges and Solutions. Visit http://fedpforum.epcmengineers.com Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 3:51pm On Jul 29, 2015 |
Week of July 19-25, 2015: The contribution by Chris10, on the topic As an Engineer, if you had the opportunity to change one thing in Nigeria, what would you Change?, was adjudged to be worthy of recognition in the content, context, delivery and flow. He is thus awarded a N3,000 GSM Recharge Voucher. Rewards for best weekly contributor may be open recognition or some other ways but solely at the discretion of The FEDP Forum Team. Regards, Nigel K. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 3:52pm On Jul 29, 2015 |
Week of July 19-25, 2015 Quiz Winner: Enwose. No member met the target 100% score. However, the highest score of 5 out of 7 was by Enwose. He is awarded 50% of the week's $70 cash prize ($35). The target remains Excellence. This week's Quiz prize is $100!!! Send in your answers to this week's quiz and stand a chance to win. Winner(s) will be published next week Wednesday. |
Re: Engineering (Oil And Gas) Forum For Innovation And Development by Nigel1: 3:53pm On Jul 29, 2015 |
1. Re-arrange the following in Order of start-to-end for an Oil and Gas Brownfield Facilities Project a. Process Flow Diagram b. Preliminary Block Flow Diagram c. Management of Change Risk Assessment d. Constructability Review e. Field Data gathering and measurements f. Pre-Construction Risk Assessment g. Piping and Instrumentation Diagram-IFC 2. Arrange the following in sequence: Earliest-to-Latest a. Front End Engineering Design b. Feasibility Study c. Start-Up/Operations d. Procurement of Long Lead Items e. Detailed Engineering Design f. Commissioning g. Construction/Fabrication 3. What is the name of the document that is developed to guide the process of a HAZOP Study in terms of Scope, Timing, Venue, Methodology, Boundaries, Participants, etc.? 4. Which of the following is NOT a PARAMETER in a typical Guide-Word HAZOP study a. FLOW b. TEMPERATURE c. HEIGHT d. PRESSURE e. DENSITY f. VISCOSITY g. SPEED 5. Can a regular 90 DEG ELBOW be used in the construction of a main pipeline segment (Not in Pig Launcher or Pig Receiver areas). YES/NO. Give reasons to support your answer. 6. During the operation of a newly installed 3-Phase Oil, Gas, Water separator connected to a knock-out vessel and flare, persistent high level and liquid carryover to flare was observed. As an engineer, identify at least 5 potential CAUSES that could result in this deviation. 7. A new Marginal field Operator is located 250m away from an existing Natural Gas Pipeline. The gas pressure in the pipeline is 30 Barg. The Marginal field is mostly non-associated gas but they have one dual completed well with a combined tested capacity of 3,000 BOPD, GOR of 1200 SCF/Barrel, FTHP 1,650 Psig, FLP 700 Psig. What surface production configuration would you advise for adoption to minimize or possibly eliminate compression power and costs to enable timely injection of gas sales through the existing pipeline i.e. minimize flaring and generate early revenue? Support your answer with a sketch. This question carries 60% of the total quiz score. ONLY 100% Correct Answer wins the Star prize. Highest Score for all entries, but below 100% wins only 50% of Star Prize To submit answers, click the 'SUBMIT ANSWERS' Visit http://fedpforum.epcmengineers.com Regards, Nigel K. |
Apply For Adexen Recruitment Agency Job Recruitment (5 Positions) / Nigeria Customs Recruitment / The Cost Of Mba Programme In Unilag
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 46 |