Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,206,220 members, 7,995,118 topics. Date: Wednesday, 06 November 2024 at 08:49 AM

CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI - Properties (42) - Nairaland

Nairaland Forum / Nairaland / General / Properties / CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI (232586 Views)

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI / Construction Process Of A Wing Duplex+flat At Ajah (2) (3) (4)

(1) (2) (3) ... (39) (40) (41) (42) (43) (44) (45) ... (102) (Reply) (Go Down)

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:08pm On Jun 22, 2015
iykmon:

Sir how do charge carpenter for installation of pvc ceiling.
What is the cheapest pricing.
Thanks for the great service.
I don't used to do that sir. .....but 1k per sqm should be ok (labour only)
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:59pm On Jun 25, 2015
segcymoor:

Gone!.....alert don drop..

Urgent request:minimum of 1000 sqm urgently needed within agungi and ikate with good title. ......need to reinvest the money!
Behold! Something is about to happen
Watch out!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by iykmon: 8:15am On Jun 26, 2015
Oga segcymoor please what is the best material for aluminum windows.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by emman44(m): 8:19am On Jun 26, 2015
Here is another opportunity at your door step, don't miss it.. Buy a good land at the front gate of FEDERAL UNIVERSITY OF AGRICULTURE ABEOKUTA. Where electricity of more than 12hours is guarantee... We do proper investigation of land before we put it up for sale.. You can also use the land to build a Good HOSTEL which will be given u back good profit. A self is nw 130k per year..you can never find a problem in the land you get from us.. Call or whattapp Mr Taiwo on 07066474055 for more information... Grab this great opportunity.....we are the best you can contact for good land that will give u rest of mind.... I will b waiting for your calls..........
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:08pm On Jun 26, 2015
iykmon:
Oga segcymoor please what is the best material for aluminum windows.
nigalex
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Chekitaut: 1:04am On Jul 01, 2015
Chekitaut:
From Lagos-Island, Victoria-Island, Banana Island, Ikoyi, Lekki to Songotedo
[size=14pt]Granite= N4,350/Ton[/size](Transportation Fee included)
Minimum Order=30tons

[size=14pt]Stone Dust= N2,800/ton[/size](Transportation Fee included)
Minimum Order=30tons

Call Now: 08055545355, 08032887233
Hurry Now!!!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:08pm On Jul 21, 2015
segcymoor:

Behold! Something is about to happen
Watch out!
.....but now in a different dimensions
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by fembukin(m): 8:48pm On Jul 21, 2015
PhemCoat Paints... We Produce Quality Paints such as Acrylic Texcoat, Acrylic Emulsion, Spacel, Vinyl Matt Emulsion, Vinyl mattcoat, Silk, Satin, Flex, Flexcoat, Marble Trowel, Gravitex, Spatini,  Stucco, Leave Digital and Gloss Paints.

Our Paints are of good Quality and reasonable price

.... A trial will convince you


Image 1... silk paint
Image 2.... Matt Coat paint
Image 3.... Stucco
Image 4.... Leaves Digital


For inquiry
call: 08039777436, 09051709124
BB PIN: 2B111A7D
Whats App: 08039777436

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by blessedfavoured: 10:19pm On Jul 21, 2015
segcymoor:

.....but now in a different dimensions

I think i know the first building, Is the terrace building off abioro street in ikate, if not it looks similar.

Please how much did the block of flats cost +finishing (estimate) and how large is the piece of land. Can it fit 1000sqm?

sorry if you posted already.

Excellent Job btw
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:12pm On Jul 22, 2015
blessedfavoured:

I think i know the first building, Is the terrace building off abioro street in ikate, if not it looks similar.
Please how much did the block of flats cost +finishing (estimate) and how large is the piece of land. Can it fit 1000sqm?
sorry if you posted already.
Excellent Job btw
Sitted on 1020sqm

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by iykmon: 3:41pm On Jul 23, 2015
How much is sit and rest toilet WC now.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:41am On Jul 24, 2015
segcymoor:

Sitted on 1020sqm
But with ample parking. ..
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Nobody: 9:02am On Jul 24, 2015
Call Perfect Touch Aluminium today and we will give you the best service. Tel:08153665659,08067079715. Thanks
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by EndiaSami: 9:43am On Jul 24, 2015
iykmon:
How much is sit and rest toilet WC now.
If I get ur questions properly, the answer is it Ranges from 25000-50000. Click on my thread to view pictures,if necessary
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:08am On Jul 27, 2015
EndiaSami:

If I get ur questions properly, the answer is it Ranges from 25000-50000. Click on my thread to view pictures,if necessary
......I hope your question is being answer

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:35pm On Aug 05, 2015
We set to deal with about 2200sqm. .....
Watch out!
MOORE- DESIGNBUILD LTD | We do structure right!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by babalose: 6:49pm On Aug 05, 2015
WE WILL WORK TOGETHER SOON...NICE WORK.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:40am On Aug 06, 2015
babalose:
WE WILL WORK TOGETHER SOON...NICE WORK.
We shall be grateful for considering us worthy of working for you.















MOORE - DESIGNBUILD LTD | We do structure right!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:40pm On Aug 06, 2015
segcymoor:
We set to deal with about 2200sqm. .....
Watch out!
MOORE- DESIGNBUILD LTD | We do structure right!
First option

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:27pm On Aug 06, 2015
MOORE- DESIGNBUILD LTD | We do structure right!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:10pm On Aug 08, 2015
Second option!

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by mufutau55(m): 10:12pm On Aug 08, 2015
segcymoor:
Second option!

Barrister (SAN) Segcymoor, I like the second option better.

Hajji M.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by twinskenny(m): 10:43pm On Aug 08, 2015
segcymoor:
Second option!
wow awesome... the second option
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by makinde3: 11:07am On Aug 09, 2015
The second option is better
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:42pm On Aug 09, 2015
Thanks everyone. To be sincere those options has brought many controversy. Me and my client preferred 1st options just for its simplicity. We really love the concept and has being working towards it.
But due to strategy location of this project many clients opted to pay up front. But alas. virtually all of them prefered 2nd options so we don't have choice than to dance to their tone.
You guys were right after all.
mufutau55:

Barrister (SAN) Segcymoor, I like the second option better.
Hajji M.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by CHANCEMAN: 12:09am On Aug 10, 2015
segcymoor:

nigalex

Not tower?
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by kino47: 10:35am On Aug 10, 2015
is that not pete edochie taking a stroll in the compound grin
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:20pm On Aug 10, 2015
CHANCEMAN:

Not tower?

Actually, unless otherwise neccessary Standard tower is best and ideal for Window because Nigalex is normally used for commecial structure.
Yeah! Nigalex is the best quality but quiet expensive
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by mavverick: 5:31pm On Aug 10, 2015
Sergy,

Abeeg, do you have good people you can recommend for the following jobs.

* Tiler
* Electrician to do complete wiring for 7 flats.
* Window & Burglary proof.
* Plumber to do water installation for the whole flats and do the installation of sanitary wares.
* Someone to do external cladding.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by topsy23: 5:52pm On Aug 10, 2015
mavverick:
Sergy,

Abeeg, do you have good people you can recommend for the following jobs.

* Tiler
* Electrician to do complete wiring for 7 flats.
* Window & Burglary proof.
* Plumber to do water installation for the whole flats and do the installation of sanitary wares.
* Someone to do external cladding.

For electrical and mechanical(plumbing) design and installation. Contact us.

or further info call 08033643191 or 08051750560
Whatsap: 08033643191
Pin: 24ED26C9
Email; atope23@live.co.uk, topselg.engineering@gmail.com

You can visit our thread:
https://www.nairaland.com/1804476/complete-package-design-drawing-electrical

https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/9
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:10pm On Aug 10, 2015
topsy23:

For electrical and mechanical(plumbing) design and installation. Contact us.
or further info call 08033643191 or 08051750560
Whatsap: 08033643191
Pin: 24ED26C9
Email; atope23@live.co.uk, topselg.engineering@gmail.com
You can visit our thread:
https://www.nairaland.com/1804476/complete-package-design-drawing-electrical
https://www.nairaland.com/1233943/contact-us-electrical-mechanical-plumbing/9
Yeah. Topsy can do better. Send to my mail (mooredesignbuild@gmail.com) to get tiler contact and co because they were not here on NL.
.........I will give you a professional tiler! (But they don't collect less than 450k per sqm)
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by twinskenny(m): 7:12pm On Aug 10, 2015
segcymoor:

Behold! Something is about to happen
Watch out!

good one sir.. this is what we usually pray for!!! make sure we are on the list of your subconctractor sir grin grin

(1) (2) (3) ... (39) (40) (41) (42) (43) (44) (45) ... (102) (Reply)

How Large Is 'A Plot' Of Land? / Prices For These Paints / Best Architectural, Interior And Construction Works

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.