Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by twinskenny(m): 7:15pm On Aug 10, 2015 |
mavverick: hello sir.. i dont offer any of the services but you may require someone to do: dstv wiring and installation? cctv? need for wireless or wired door bell? wired or wireless intercom? i will be glad to work with you sir 08051355133 |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:54pm On Aug 11, 2015 |
twinskenny:Yeah. They can do even better |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Meritgoal(m): 9:35pm On Aug 11, 2015 |
I can handle your aluminium window , with good price and quality job. Call 07038092452. ak.medular@gmail.com |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:39pm On Aug 15, 2015 |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:00am On Aug 18, 2015 |
Meritgoal:[b][/b]ok |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:32pm On Aug 19, 2015 |
segcymoor: Preliminary work in progress! |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:28pm On Aug 25, 2015 |
MOORE -DESIGNBUILD LTD | We do structure right! |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:58pm On Aug 26, 2015 |
segcymoor: Meanwhile, we have actually fence d land in question .....but later |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by benelix: 11:45pm On Sep 03, 2015 |
TWINS BUNGALOW FOR SALE IN IBADAN CONACT ME ON : 08068775723 OR EMAIL : benelix@engineer.com OR CONTACT ME ON FACEBOOK PAGE BENELIX@FACEBOOK.COM 1 Like
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:31pm On Sep 04, 2015 |
benelix:we don hear.. |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by iykmon: 2:05am On Sep 16, 2015 |
segcymoor: What is the cost in setting up a water treatment plant. How do you plan to send water to the highest floor , put in mind a situation when every flat is using water at the same time. The is always a pressure drop. looking forward for response I am correctly facing this challenge. many thanks Great seycymoor. |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:13pm On Sep 16, 2015 |
iykmon:Average of 250k for water treatment plant. I don't actually get u. The tank is positioning above the each level b the floor for proper pressure |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by DiroiD(m): 2:21pm On Sep 20, 2015 |
We are into construction of roads, drainage, paving tones, buildings in lekki, mainland and every part of lagos, ibadan, ogun and every part of nigeria... We shall do estimate based on the soil conditions and area. Pls call engr Ola on 07057255428 for further enquiry... Thanks |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Chekitaut: 5:36pm On Sep 20, 2015 |
DiroiD:Open your trend. haba |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by iykmon: 5:02pm On Sep 23, 2015 |
Please can anybody tell me the duties and responsibility of an estate surveyor when he is managing your property. What role does he play when things go wrong. How is the agree percentage paid. many thanks |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:12pm On Sep 25, 2015 |
MOORE concept...... 1 Like
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:55pm On Sep 29, 2015 |
Our new project shall be 9 units terrace building just at the second toll gate by chevron Project manager:MOORE-DESIGNBUILD LTD Client:Non -Nairalander Project duration: less than 4months ....it going to be the fastest so far! ......details later 1 Like
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:03pm On Sep 29, 2015 |
We have completed the fence and all necessary drawing. Contract agreement has been drafted but yet to sign
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:26pm On Oct 12, 2015 |
Something is about to happen. .......... 1 Like
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by paulasca4real(m): 1:39pm On Oct 12, 2015 |
Nice job. i appreciate the quality work on ground. well done. |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:02pm On Oct 12, 2015 |
9 UNITS TERRACE HOUSE: Targets:All foundation must be completed on or before ending of this very month Watch out for the faster one ever Starting date:Oct., 12 -2015
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:03pm On Oct 12, 2015 |
Taking level. ..... |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:09am On Oct 13, 2015 |
Review design for the fully attached 1 Like
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by topsy23: 7:40am On Oct 13, 2015 |
segcymoor: A massive project boss.....like an estate. Can't. Wait |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by EndiaSami: 8:25am On Oct 13, 2015 |
segcymoor: |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:20pm On Oct 13, 2015 |
Mobilisation of materials
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:18pm On Oct 14, 2015 |
Busy!
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:03pm On Oct 14, 2015 |
Delivery of marine plywood in progress
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:19am On Oct 15, 2015 |
Here is our Ukraine reinforcement to carry the 2 slab......the starter bar! The best quality of reinforcement!
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 11:29am On Oct 15, 2015 |
Busy!
|
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by topsy23: 5:29pm On Oct 15, 2015 |
Weldone boss |
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:23pm On Oct 15, 2015 |
Arrival of more materials
|
(1) (2) (3) ... (40) (41) (42) (43) (44) (45) (46) ... (102) (Reply)
How Large Is 'A Plot' Of Land? / Prices For These Paints / Best Architectural, Interior And Construction Works
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36 |