Nairaland Forum / Nairaland / General / Properties / Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis (40385 Views)
Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice / Construction Of My 3bedroom Flat All Ensuite (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (15) (Reply) (Go Down)
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by mufutau55(m): 3:49pm On Aug 31, 2015 |
brag3: I think he is just using woods not marine boards... I don't see any marine board in the formwork. Hajji M. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 3:51pm On Aug 31, 2015 |
Thanks Haji M, I thought as much as I could only see 3 woods from the pics. Just wanted to confirm the height of the foundation. Thanks again mufutau55: |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 5:24pm On Aug 31, 2015 |
brag3:The height of the fdn is 1.8m (by layman's term we ll say 6 boards) this include 0.2m raft slab, in some area the height is 1.5m (6 boards) including the raft slab. (this are the areas of car park under the house, it was reduced so that to allow for easy movement of the vehicles. The 3 board u saw is not an overall height yet, we did 3 for now because 5 to 6 boards will be too heavy to carry into the trench and set properly, also it will be too high for iron fixers to stand and work on it. After dropping the iron the remaining formwork will be added to meet up to various desired heights. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 5:25pm On Aug 31, 2015 |
sorry for the typo . 1.5m by layman's term is 5 boards |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by mufutau55(m): 6:21pm On Aug 31, 2015 |
Aventures: Professional explanation... Well understood. Thank you. We continue to learn. Hajji M. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by petikal(m): 6:29pm On Aug 31, 2015 |
Aventures: Great design, and interesting use of parking space. By a plot and half, do you mean 50x120? It seems much bigger than that. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 6:44pm On Aug 31, 2015 |
Aventures: Thank you very much for the thorough explanation. We learn every day from professionals like you. What is the minimum number of boards to use for a foundation? I know this will depend on the area itself so I expect somewhere like Lekki to use more boards than mainland lagos. Just trying to understand the minimum height to use irrespective of the area. This is minus the raft slab. Thanks again for your prompt answers to our questions. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by erico2k2(m): 8:01pm On Aug 31, 2015 |
Aventures:Ok we are waiting for updates |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 9:41pm On Aug 31, 2015 |
brag3:Sir, there are two determinant factors to the foundation height (raft fdn in particular) 1. The load that the beam is going to bear, this will be determined by structural design. 2. The desired height above the natural Ground level (NGL). In the case of our ongoing project the desirable depth was achieved at the point where there is soil bearing capacity high enuf for the this structure (900mm or 0.9 m or 3ft) and also i think the structural engr and Architect were of opinion of minimum of 600 mm above the natural ground level at the car park area and 900 mm at some other area. So it is basically the structural design and the site topography (i:e site natural grd level relative to the road or envisaged road level) petikal:This structure was designed to fit into one plot of 60 x 120 ft but when we got to site we discover that the plot was wider than 60 ft, and that becomes an additonal advantage to the car drive way it become bigger. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by oakhill: 3:25am On Sep 01, 2015 |
Can this building fit in a 50 x 100 plot of land..? |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by spyder880(m): 6:45am On Sep 01, 2015 |
Well done Aventures, good work. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 8:20am On Sep 01, 2015 |
oakhill:it cannot except the size of this design is reduced a bit. oga spyder880 tx for taking ur time to visit our humble thread Hat up, keep up the good work at the eastern end of nija. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 5:21pm On Sep 01, 2015 |
Aventures: @Aventures. Thanks for your detailed response. You always hit the nail on the head at all times. I have another question which may be digressing from the thread so apologies in advance. Please I need some advice from you. I am building quite close to near LASU first gate and was thinking of adding a Pent house to my project. The Ground floor and first floor have been completed (3 * 2 bedroom on each floor) The pent house will be a 3 bedroom flat but someone has advised me to consider using the Pent for 3 self-contained rooms to generate more rental income. What do you think? will the 3 bedroom flat be more profitable than 3 self-contained rooms? Appreciate any advice you can offer and also from other fellow NLs. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by kopell: 6:08pm On Sep 01, 2015 |
brag3:Man be careful is this idea was incorporated in the drawing at the begging? if not please stay clear of those people advising you of doing it now at this stange, on the house. Safety first before money, remember the church story in Idimu recently? This is just my two cent opinion take care. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 6:17pm On Sep 01, 2015 |
kopell:@kopell , Thanks for your advice. You are totally on point here. It was not incorporated in the original design but the structural Engineer and Architect have checked the design and existing work and have given the go-ahead for it to be able to hold a complete second floor. Thanks again for your advice. Safety should always come first. I totally agree. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by kopell: 6:33pm On Sep 01, 2015 |
brag3:My brother make sure the structural Egineer and the Architect make it legal backing on their assurance of what the give you go ahead to do. You never know 10 to 20 years from now, anything may happen, God forbid. You can be free of any lability. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 8:08pm On Sep 01, 2015 |
kopell: Amen my brother. God Bless. Thank you |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 9:00pm On Sep 01, 2015 |
@Brag3 if I get you right you said in the original drawing there is a pent floor meant to be 3 bedroom flat. You want to know if you can convert the 3 bedroom pent floor to 3 nos of self contain to generate more rental yield. This doesn't seems to be an additional load since you are only converting and not adding extra new floor. Since your architect has given you the go ahead, I am sure they must have checked that the conversion won't pose any challenge beyond the factor of safety they have considered during design. But one truth is that if your architect is an expert space manager he should be able to advice you that pent floor is always for an exclusive use. Now if you convert it to multiple apartment it may loose its functionality, as 3 occupants may have to use a very small lobby at the second floor. So I will advice you let it be as 3 bed flat except you are excepting students to be the tenants. 1 Like |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 9:07pm On Sep 01, 2015 |
Aventures: @Aventures , Thanks alot and all the others. It's always nice to have people like you who can always advice properly. I will take all this onboard. @Brabus, can you add anything to this since you helped with this from the beginning? |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by lafolabi(m): 1:18am On Sep 02, 2015 |
tweinskenny .We shall continue to do our best. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brabus(m): 10:59am On Sep 02, 2015 |
brag3: I really don't think adding a pent on the foundation is a good idea. The foundation was adequately designed to support one slab. It's possible to have two slabs but you need to consider the live loads. I've seen someone did something similar on NL and the house is settling faster and differentially even without the structure been completed. Pls take note, adding a pent means, there's another slab, block wall and roof structure. All these are extra loads. So, pls shelf the idea. I suggested having another row of shops at the back side for more income generation. It can be a storey building. It's far better than overloading the existing structure. My Oga Sir Aventures, well done sir! |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 3:31pm On Sep 02, 2015 |
brabus: @brabus. Thanks for your prompt response. Will take this on board. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Fhemmmy: 5:06pm On Sep 02, 2015 |
Awaiting picture update oh . . . . |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 9:44pm On Sep 02, 2015 |
Fhemmmy:Reinforcement fixing in progress
|
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 9:52pm On Sep 02, 2015 |
Work progress update: 1. Formwork taken to 70%, so iron fixers can do their work non stop. 2. reinforcement work up to 50% 3. We took delivery of reinforcement for ground floor slab and grd floor columns today (see above pics) so that as soon as we are done with grd beam casting, the iron prep commences while filling and surface prep is in progress. 4. Block making machine already onsite but we hold on production as every where is tight they could not get material into the side due to heap of sand, so as soon as we are done with grd beam and back fill the production will commence in earnest. 1 Like
|
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 9:59pm On Sep 02, 2015 |
more pics
|
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by kopell: 10:39pm On Sep 02, 2015 |
Aventures:@Aventures how many block can that machine make at a time? It looks like it's does not have any mechanized system attached to it. I hope it can make five blocks at one time. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by palserltd: 10:59pm On Sep 02, 2015 |
For your Aluminium & Glass systems (windows, doors, roofing, shower stalls, partitions, etc.) see our profile here https://www.nairaland.com/2547536/aluminium-glass-systems-windows-doors |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Fhemmmy: 11:29pm On Sep 02, 2015 |
Aventures: Awesome and looking great.... good work. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 7:43am On Sep 03, 2015 |
kopell:yes the mechanised systems are yet to be attached it will be fixed before commencing production. The machine can only produce on at a time. |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(m): 10:18pm On Sep 03, 2015 |
Reinforcement work to soon be completed and to be lowered. Hoping to pour ground beam concrete next week. 2 Likes |
Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Chekitaut: 7:44pm On Sep 08, 2015 |
Aventures:Weldone, great job... form work am highly waiting to see. |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (15) (Reply)
You Need Electric Car Jack Wheelspanner Pump As You Drive To See That Properties / Suspicious Looking Fence To A House / Governor Ishaku Commissions Uncompleted Housing Estate
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 78 |