Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,206,818 members, 7,996,898 topics. Date: Thursday, 07 November 2024 at 05:41 PM |
Nairaland Forum / Nairaland / General / Properties / Construction Of A 5bedroom Duplex + 2 Flats (60797 Views)
DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] / A 5bedroom Bungalow On 5plots Of Land In Osogbo / Construction Of A 6 Bedroom Duplex At Owerri (2) (3) (4)
(1) (2) (3) ... (11) (12) (13) (14) (15) (16) (17) (Reply) (Go Down)
Re: Construction Of A 5bedroom Duplex + 2 Flats by twinskenny(m): 8:44pm On Sep 10, 2015 |
kkonsults: baba been a while.. how is the job going |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 12:01pm On Sep 11, 2015 |
twinskenny:work is fine sir, Alhamdulilai.... sure you are doing great. K. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by airsaylongcon: 12:51pm On Sep 11, 2015 |
airsaylongcon: Am I gonna get this answered? |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 12:40pm On Sep 13, 2015 |
airsaylongcon:took a while.. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 12:49pm On Sep 13, 2015 |
KKONSULTS design & construction kkonsult0@yahoo.co |
Re: Construction Of A 5bedroom Duplex + 2 Flats by airsaylongcon: 5:38pm On Sep 13, 2015 |
kkonsults:A while as in? How many days? |
Re: Construction Of A 5bedroom Duplex + 2 Flats by topsy23: 5:42pm On Sep 13, 2015 |
airsaylongcon: I believe after a week you should be ready to start your block work |
Re: Construction Of A 5bedroom Duplex + 2 Flats by airsaylongcon: 6:01pm On Sep 13, 2015 |
topsy23:I'm still waiting for kkonsults to respond. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 11:08am On Sep 14, 2015 |
..
|
Re: Construction Of A 5bedroom Duplex + 2 Flats by nelsonB: 12:16am On Sep 15, 2015 |
Plls guys help me out pls, how many block can I get from 1 trip of sand giving 30 blocks per bag of cement. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by airsaylongcon: 12:31am On Sep 15, 2015 |
airsaylongcon : I guess this question is not going to be answered. Building standards state that concrete reaches 98% of it's strength after 29 days. In the UK this is extended to 42 days minimum. The standards also clearly state that NO Work can be done on the concrete until it reaches its maximum strength. "took a while..." Or "after a week" clearly indicates a lack of knowledge of these standards. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by Nobody: 12:33am On Sep 15, 2015 |
airsaylongcon:Please [abeg] and please lend me 2 mins of your time and 50kb of you data and kindly vote for me here https://mobile.twitter.com/runzlord/status/639602054546255872?p=v The link to the voting page is in that status, cos I can't post the link directly on Nairaland due to Nairaland restrictions. Thank you very much. It a a palm selfie contest by samsung. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 6:56pm On Sep 16, 2015 |
Good day |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 12:37am On Sep 25, 2015 |
picture updates
|
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 12:52am On Sep 25, 2015 |
picture updates
|
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 1:00am On Sep 25, 2015 |
..
|
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 7:08pm On Sep 25, 2015 |
Happy Eid celebrations... Kkonsults. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 10:18am On Sep 27, 2015 |
kkonsults:
|
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 10:22am On Sep 27, 2015 |
up next is the decking happy weekend |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 7:09pm On Sep 30, 2015 |
.. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by kkonsults: 6:51pm On Oct 14, 2015 |
Good day. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by smiley001(m): 10:06pm On Oct 14, 2015 |
Re: Construction Of A 5bedroom Duplex + 2 Flats by nigeriancuban: 10:35pm On Oct 14, 2015 |
airsaylongcon:curing should be a minimum of 21 days for concrete or a little less for beams and lintels |
Re: Construction Of A 5bedroom Duplex + 2 Flats by nigeriancuban: 10:38pm On Oct 14, 2015 |
kkonsults:learn to use skilled engineering terms ,there is no aivh thing as "filling the foundation" 1 Like |
Re: Construction Of A 5bedroom Duplex + 2 Flats by airsaylongcon: 10:39pm On Oct 14, 2015 |
nigeriancuban: Thank you! Someone here said 7 days. I asked cos I wanted to know how long the OP waited for the concrete to cure. The books I read said 28 days though. But I will be fine with at least 21 days for either decking or lintels and beams |
Re: Construction Of A 5bedroom Duplex + 2 Flats by nigeriancuban: 10:39pm On Oct 14, 2015 |
ebony202000:cost varies an it depends on the specifications you want,I doubt if your deck size is also similar too |
Re: Construction Of A 5bedroom Duplex + 2 Flats by nigeriancuban: 10:40pm On Oct 14, 2015 |
kkonsults:has it been rammed yet? |
Re: Construction Of A 5bedroom Duplex + 2 Flats by airsaylongcon: 10:42pm On Oct 14, 2015 |
nigeriancuban: At last, an engineering professional! Now I'm forced to follow you |
Re: Construction Of A 5bedroom Duplex + 2 Flats by nigeriancuban: 10:48pm On Oct 14, 2015 |
airsaylongcon:7 what?? hmm,some engrs can be way too wackoo,no wonder they go around building cracks around ,concrete expands during curing and without a firm grip on the reinforcement the desired strength will not be attained.. |
Re: Construction Of A 5bedroom Duplex + 2 Flats by nigeriancuban: 10:55pm On Oct 14, 2015 |
airsaylongcon:thanks for that compliment but like every other profession,we aren't perfect but at least one have to study in school to become something better,most of these cut and nail engineers neither went to college nor even acquired any degree and you can see the damages a lot of the so call renouned bricklayers have caused in the name of proving to be experts |
Re: Construction Of A 5bedroom Duplex + 2 Flats by airsaylongcon: 10:56pm On Oct 14, 2015 |
nigeriancuban: Go through the thread na. I've seen work commence on a decking 24 hours after it was cast! PS: I am a computing grad o. But I had to hunt books on building to get up to speed. I had always wondered why buildings built in the 80s and before were always orthogonal but not today's buildings. JB and Cappa built straight structures but not locals. Spoke with a Civil engineer and he complained of material quality and I said the more reason we should wait longer for concrete to cure! These days they just use POP to get a straight look with faulty underlying structures. The wood we use to build today sef is terrible! I always thought that engineered wood (plywood) was that standard for formwork |
Re: Construction Of A 5bedroom Duplex + 2 Flats by mufutau55(m): 12:58am On Oct 15, 2015 |
airsaylongcon: On what thread have you seen any Builder commencing block work after 24 hours of decking... Please point us to one of the specific thread. Hajji M. |
(1) (2) (3) ... (11) (12) (13) (14) (15) (16) (17) (Reply)
New Photos Of Eko Atlantic And How Much It Costs To Get A Land / Cost Of Rent Around Lagos / Price Of All Kinds Of Roofing Sheets In Nigeria
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 74 |