Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,218,138 members, 8,036,798 topics. Date: Wednesday, 25 December 2024 at 08:47 AM |
Nairaland Forum / Nairaland / General / Properties / NextHome Project Gallery (14987 Views)
Construction Journal | Browne Mews By Nexthome / PLOT 10AB HAVEN & THE RESERVE IN AGUNGI By NextHome / Nexthome Builders: 2014/2015 New and Ongoing Projects (2) (3) (4)
(1) (2) (3) (4) (5) (6) (Reply) (Go Down)
Re: NextHome Project Gallery by brabus(m): 9:48pm On Sep 22, 2015 |
Electricals ~ High Quality fittings and fixtures our hallmark 2 Likes
|
Re: NextHome Project Gallery by brabus(m): 5:38am On Sep 24, 2015 |
Casa Nee, a family beach house. Just steps to the Atlantic Client: Private Designer/Architect/Builder: NextHome Builders Project Location: Lagos, Nigeria Delivery Method: General Contractor Sector: Residential (Mixed-use) Status: Ongoing Start Date: Jan 2014 Value: 17,000,000 2 Likes
|
Re: NextHome Project Gallery by Waterway: 5:58am On Sep 24, 2015 |
brabus: Brabus can I get contact for the contractor for this custom wooden door 1 Like |
Re: NextHome Project Gallery by brabus(m): 6:03am On Sep 24, 2015 |
Waterway: The door was made by a local carpenter at a sawmill in Ijebu-Omu junction. It has been a while but I'll try to get his contact from a friend who linked me up with him. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:03am On Sep 24, 2015 |
|
Re: NextHome Project Gallery by brabus(m): 6:19am On Sep 24, 2015 |
Walls that speak! [size=15pt]We design for simplicity.[/size] 2 Likes
|
Re: NextHome Project Gallery by brabus(m): 7:46am On Sep 24, 2015 |
Overhead Tank Tower ~ Fabricated and professionally installed by NextHome in Ondo State in 2013. 2 Likes
|
Re: NextHome Project Gallery by brabus(m): 3:20pm On Sep 24, 2015 |
Awoyaya Mixed-Use Development Client: Private Architect: Foreign Architectural Design Firm Build/Remodelling/Interiors and Exteriors: NextHome Builders Project Location: Awoyaya, Lagos Delivery Method: General Contractor Sector: Residential Status: Ongoing Value: 1 Like
|
Re: NextHome Project Gallery by mavverick(m): 4:39pm On Sep 25, 2015 |
Hi All. I find it very rich that Brabus/Nexthome/Bosun Davies is opening up a new thread scouting for new customers whilst old Ex-customers like myself are dealing with the following. 1) Non-accountability of materials used, he even asked me to call a scientist to verify what he has used. I have screenshots and evidence. 2) Shoddy work on my building (Still fixing till today and still costing me extra money) 3) Stealing of my materials 4) Fraudulent documentation (serious matter, plans are underway to deal with this) 5) Numerous attempts to collude with my security guard to defraud me. 6) Heavy financial losses as a result of using your services. 7) Non-performance and serious incompetence (who inserts used cement bag into concrete) In actual fact, I am not the only person. There is another thread which I will bring up shortly. There are dozens who have fallen into this trap, and I will urge anyone to do their research. The fact that he's still being allowed to post on this forum despite all the grievances that remain unresolved, is simply beyond me. Wise words for anyone. 1 Like |
Re: NextHome Project Gallery by brabus(m): 6:33pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:37pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit by NextHome Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:41pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:47pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit by NextHome Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:53pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:56pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit by NextHome Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 7:08pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 7:13pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit by NextHome Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like 1 Share
|
Re: NextHome Project Gallery by brabus(m): 7:16pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit Client: Sir Mavvericks Architect: Nairalander Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Sector: Residential Status: Contract Terminated Amount Paid to NextHome: 5,827,700 Job Covered: Foundation, Ground Floor Block Work, First Floor Slab Work and part upper floor block work. 1 Like
|
Re: NextHome Project Gallery by FastShipping: 7:18pm On Sep 25, 2015 |
mavverick: Can we have detail information about what brabus did at your site? You gave some points but no details about how brabus didn't meet your expectation. Brabus already countered your highlights with pictures of what he did at your site. It is now up to you to give details about the highlights of what you claimed brabus did. 2 Likes |
Re: NextHome Project Gallery by brabus(m): 8:17pm On Sep 25, 2015 |
Oko-Ado Multi-Dwelling Unit Client: Sir Mavvericks Builder: NextHome Builders Project Location: Oko-Ado, Lagos Delivery Method: Construction Management Amount Paid to NextHome: 5,827,700 Period of Construction: May - July 2015 Building Dimension: 10.5 x 33.625m (6 planks raft) Funds Allocation Excavation Uprooting of Trees, Roots Blinding Granite (Foundation work) Sharp Sand (Foundation Work) Cement (Blinding only) Marine Board Rental (Raft) Nails (Foundation) Plumbing Materials (Foundation Stage) Filling Sand/Labour for Packing/Surface Treatment Hardcore DPC Membrane Omo onile settlements during casting and workers levies Marine Board Rental (First floor slab) less N135,000 deducted for 150 planks bought by NextHome Labour Charges Carpentry works (Raft, Columns and Lintels, Upper Floor Slab and Four (4) Staircase) Iron Bending Works (Raft, Column extension, Lintels, Beams, First Floor Slab and Four (4) Staircase) Casting/Concrete Works (Raft, DPC, Columns and Lintels, First Floor Slab) Ground Floor Block Work (@ N55,000 per 1000 blocks) Upper Floor Block Work (@ N60,000 per 1000 blocks) First fix mechanical/electrical works (Foundation, Block setting stage and First Floor Slab) _____ Kobo by kobo breakdown of cost will be made available later on this thread. 1 Like |
Re: NextHome Project Gallery by brabus(m): 8:45pm On Sep 25, 2015 |
Crystal Chandelier ~ Timeless Elegance and Classic Beauty I took delivery of crystal chandeliers for one of my ongoing project from my supplier this afternoon. So Beautiful! ______ Let me take some time to go through the instruction/assembly manual. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 9:46pm On Sep 25, 2015 |
High-Quality SweetHome Faucets ~ Stylish and Comfortable to use. Supplied by Endiasami 4 Likes
|
Re: NextHome Project Gallery by brabus(m): 6:11am On Sep 26, 2015 |
Luxury Apartment Client: Private Designer/Architect/Builder: NextHome Builders Project Location: Arepo, Ogun Delivery Method: General Contractor Sector: Residential (Mixed-use) Status: Completed Start Date: Jun 2011 Value: Unknown RIP to my client's late father! The one who has been the main brain behind this project. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:38am On Sep 26, 2015 |
Grohe Tub ~ Simply modern Whatever a mind can conceive, we can achieve. ______ ...when the price is right. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:44am On Sep 26, 2015 |
Upcoming: Spotlight on Akoka Multi-Dwelling Unit. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:48am On Sep 26, 2015 |
Fences, Here and There! ~ Quality Build by NextHome 1 Like
|
Re: NextHome Project Gallery by brabus(m): 6:50am On Sep 26, 2015 |
Fences, Here and There! 1 Like
|
Re: NextHome Project Gallery by brabus(m): 8:20am On Sep 26, 2015 |
Affordable Homes ~ Modern design with low budget by NextHome 1 Like
|
Re: NextHome Project Gallery by brabus(m): 8:27am On Sep 26, 2015 |
Affordable Homes ~ Simply2 I'm obsessed with small but efficient homes nowadays. Building something like this wouldn’t cost too much. Much better than taking mortgage for bigger and less functional houses. 1 Like
|
Re: NextHome Project Gallery by brabus(m): 8:33am On Sep 26, 2015 |
Septic Tanks ~ The traditional way! Pic: Septic tank at Ikeja Flats in 2013 1 Like
|
Re: NextHome Project Gallery by brabus(m): 8:40am On Sep 26, 2015 |
Septic Tank ~ When nature gets in the way. https://www.youtube.com/watch?v=WjwqRk8DkV0 Pic: Septic tank at Forthright Estate, Magboro 2013 1 Like
|
Re: NextHome Project Gallery by brabus(m): 8:44am On Sep 26, 2015 |
Yes, we built it! ~ A porch with a view 2 Likes
|
(1) (2) (3) (4) (5) (6) (Reply)
If You Share One Prepaid Meter, Then This Is For You / Luxury Construction - 7 Bedroom Smart Duplex (mansion) - Lekki Lagos / Anything You Want To Know About Building APPROVAL PROCESSING AND BUILDING DESIGN
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36 |