Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,206,603 members, 7,996,194 topics. Date: Thursday, 07 November 2024 at 05:08 AM |
Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4808652 Views)
Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)
(1) (2) (3) ... (135) (136) (137) (138) (139) (140) (141) ... (3774) (Reply) (Go Down)
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Arnoldfish(m): 10:35pm On Feb 12, 2016 |
Onion16:going through again, the cost of labour for foundation is 870k while the 2.9m is a grand total of different stuffs(total labour) I guess. 870 is very ok for labour only. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by abdulwastecx(m): 10:36pm On Feb 12, 2016 |
EgunMogaji: I am in total agreement with you sir, we need to upt our game and do things properly. I love that that wooden framed cabin you built yourself sir. I can you been a very good carpenter from what you built over their sir. The bottom line is continuous education and further improvement based on current practice. When I look at a project, I look at a better way to get them done at the cheapest cost possible, for example their was one project like that that was done in cross river ( calabar) by a non Nairalander engineer/ builder. The building was done on a sloping terrain and I believe a lot of resources was extended to the project without proper analysis and study of the slope properties. So much money could have been saved by trying something different such as grading the soil to the back and build a retaining wall to support the earth and do a proper foul drainage to take whatever water to the front. This is is just one example of things that can be done properly. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dieumerci(m): 10:42pm On Feb 12, 2016 |
Horlawoomey: Pls sir, what is the difference between orally and verbally. And what is little financial assistance meant for? |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dieumerci(m): 10:45pm On Feb 12, 2016 |
lastpage: I heard it's 21 - 28 days to allow for proper curing and to prevent a collapse. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Horlawoomey(m): 11:21pm On Feb 12, 2016 |
Dieumerci: Thanks for the question, let me address that of finance first. Little financial assistance means token that will serve as a form of motivation, it may be a little bellow average but should be able to cover daily transport fare and feeding. on orally and verbally, I think I goof on that, repeating two words with same meaning. Oral and written communication should have been appropriate. That said, Sir, I am happy you went through my plight and will like to know how you can be of help to my request. Thanks in anticipation. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dominionng(m): 11:30pm On Feb 12, 2016 |
mufutau55: lawali: Thanks for the 'heads-up' Sir. Below are pics of PVC ceiling with POP cornice at the edge of the wall. POP cornice is calculated in metres and price ranges from N1,000 - N1,300 per meter. And POP pre-cast ceiling ranges from N2,600 - N3,500 per sqm. Volume, location and designs a deciding factor. 1 Like
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Horlawoomey(m): 11:31pm On Feb 12, 2016 |
lastpage: It should be 28 days after casting, that time the concrete would have reached it maximum strength. Make sure it is well cured though. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 11:46pm On Feb 12, 2016 |
abdulwastecx: Trust me I fought both my architect Darynex and my builder on changing my plan to suit my sloppy site. I think I even got pissed at you too because you designed something other than what I want. We have a saying in Yoruba, a prayer of sorts, "may god not let us eat what we find, but to reach into our pocket and buy what we wish to eat". At the end of the day I would have "settled" for a reasonable plan that took advantage of my lot but then I would never be happy with it because it wasn't what I envisioned. So who knows about that Calabar issue, maybe the owner is a bullheaded knucklehead like me that see's a vision that no one else sees Again, a tip of my bowler hat to you Sir. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mikymouse1(m): 1:56am On Feb 13, 2016 |
Good Morning Ladies and Gentlemen. Please, what is the fair amount to pay a builder who supervised the construction of my 4 bedroom bungalow from Clearing of the site to 'move in stage '. We did not bargain nor negotiate before he started. I have not asked him yet, he is a good friend of mine and like a brother too and I don't want this job to adversely affect our relationship . The house is in abuja. Pls guys, assist me |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by spyder880(m): 2:28am On Feb 13, 2016 |
mikymouse1: Just close your eyes and write a cheque for a billion naira for him! (what are friends for?) On a serious note, there is no way of finding a fair price in this regard because we dont know; If he was coming from Bayelsa to work in the site everyday or based in Abj city If he was working full time everyday or part time If he was sleeping in a shack on site or at Sheraton Abuja If the building lasted a month or a year If the 4 bedroom bungalow was of normal standard or Dangote taste The best thing to do is to ask him now, (since you may have missed the chance earlier) and whatever he says, negotiate the price down to manageable levels. 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mufutau55(m): 2:59am On Feb 13, 2016 |
Dominionng: I know you are the best in the POP business... and this is a fact not a theory. Your work has never disappointed any of my friends sent to you. Thanks for the pictures. Hajji M. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Arnoldfish(m): 8:27am On Feb 13, 2016 |
lastpage:normally it takes between hours and 3 day for concrete to set, but theres no specific duration for it to cure completely, but 28day is the generally accepted duration for it to achieve a reasonable compressive strength of abt 3000psi. thus being able to carry load on its own without any failure. this also varies depending on the strength due to mix, admixtures used and all that.... the little I know 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mikymouse1(m): 9:01am On Feb 13, 2016 |
spyder880:Thanks my brother, I will surely ask him, I just wanted to have an idea of what to expect. As per the other variables, raised in your response; 1. He lives and works in abuja. 2. The job was done part time as he was handling 2 other jobs while executing mine. 3. The job lasted approximately one year. 4. Minus the cost of land and building approval, the total cost was about 8m. In the light of the aforementioned , what do think constitute a 'fair' price to both parties. Thank you. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by brokensword: 9:32am On Feb 13, 2016 |
Lol thanks Egun .I appreciate, if I've my way which I'm already planning, I'll go for a technical course that will last for a year, (wall framing,building maintenance,or construction technology-residential building and renovation! any idea again? |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by EndiaSami: 9:35am On Feb 13, 2016 |
mufutau55:"best in the POP business".... Dominionng!! |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by brokensword: 9:39am On Feb 13, 2016 |
abdulwastecx Lol you know Nigeria is quite far from modern civilization in terms of construction/due to the fact we lack the technical know how to execute any intended project, ask yourself why do we prefer foreigners to execute our project (huge project) than our own engineers? even in finishing, Nigerians do employ foreigners with the skill to de the job,not that we can't do it the rightful way but,the skills we acquired during the course of our training is limited. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by abdulwastecx(m): 11:58am On Feb 13, 2016 |
Dominionng: Dominion is a game changer.... I love ideas like this and neat workmanship like yours, we will surely work together 1 Like |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mufutau55(m): 12:00pm On Feb 13, 2016 |
abdulwastecx: To put it simply... it will be one of the best "Collabo". I have sent many people his way, and he has never disappointed. Hajji M. 2 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by abdulwastecx(m): 12:00pm On Feb 13, 2016 |
mufutau55: Thanks sir |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by abdulwastecx(m): 12:11pm On Feb 13, 2016 |
This is a low cost three bedroom mini estate design I have been playing with for some days. My aim is to produce simple design with a very low cost appeal. 1 Like 1 Share
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by befto: 1:39pm On Feb 13, 2016 |
Nice one. This is what I need. Dominionng: |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by 4nobody4every1: 2:19pm On Feb 13, 2016 |
abdulwastecx:.........Nice concept, how much will 4unit go for a design like this within Lagos Mainland..(dry land ) |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by abdulwastecx(m): 2:29pm On Feb 13, 2016 |
4nobody4every1: Send me your mail sir |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dominionng(m): 2:33pm On Feb 13, 2016 |
mufutau55: You have been too kind Sir. You honour me more than I deserve. Thanks for being a worthy mentor. Kind regards... Dominion. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by olumide4christ: 3:15pm On Feb 13, 2016 |
abdulwastecx: Wow!! I love your good use of flat lean-to roofs in a simple way to economise cost. Keep on the good work! |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 3:56pm On Feb 13, 2016 |
abdulwastecx: Lovely |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PeoplesArmy: 4:14pm On Feb 13, 2016 |
mikymouse1: Paying him anything between 5% to 7.5% of that amount won't be a bad idea. I believe friends should remunerated fairly if they have done a good job. |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by PeoplesArmy: 4:19pm On Feb 13, 2016 |
abdulwastecx: This looks great! What is the size of the plot? How many flats are in this first picture? |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by abdulwastecx(m): 4:56pm On Feb 13, 2016 |
PeoplesArmy: The plot is 72m x 72m and we are planning to have 16 units on it. The building is designed to be for low income income families. Each of the building will sit on a 16m x 18m each. The layout is designed in a way to allow a six meters width road.
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Gloriouspa(m): 5:30pm On Feb 13, 2016 |
Hello House, We at Gloriouspath Nigeria Enterprises, are into horticulture, landscaping and beautification works. We do plant fresh grasses, flowers, shrubs, palms, trees etc. that will make your house, office and environment looks more beautiful at affordable prices. Please call us today for a quote on your project. Call Mr. John 08161613188 email: gloriouswrite@gmail.com
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 5:44pm On Feb 13, 2016 |
abdulwastecx: Are you going to have a high slope ceiling or the regular low flat ceiling? I'm facing this quagmire. Is the cost difference minimal? Thanks.
|
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Aventures(m): 6:00pm On Feb 13, 2016 |
Horlawoomey:i like your sense of communication and determination. How i wish i have a placement for you right now. I started like this i went through a training under a well grounded engineer for four straight years after my my first degree in civil engineering at a very small salary and that really helped me even to attained my professional certification. I just engaged some young Engineers and i hope to be of help shortly. |
(1) (2) (3) ... (135) (136) (137) (138) (139) (140) (141) ... (3774) (Reply)
Viewing this topic: seunben(m), beejay1(m) and 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 71 |