(1) (2) (3) (Reply) (Go Down)

“FG Requires N2trn To Complete Ongoing Road Projects –fashola by catchfun: 6:50pm On Apr 25, 2016
Babatunde Fashola, Minister of Power, Works and HousingThe Federal Government will require about N2trillion to complete no new fewer than 226 ongoing road projects across the country.
The Minister of Works, Power and Housing,Mr Babatunde Fashola made the disclosure in Lagos while speaking at a Town Hall meeting organized to brief the public on the activities of the government in the last 11 months.
He, however, said the total amount allocated to all the sectors under his ministry in the 2016 budget was less than N500 billion,stressing that the government did not have enough resources to complete all the projects at present.
Fashola added that the focus of the government for now would be to complete some of the projects and not to undertake new ones.
“The Ministry of Power, Works and Housing proposed N423billion at the Federal Executive Council and the information reaching us is that we are not going to get all that.
“Ongoing road projects alone awarded by the government before we came– about 266 roads awarded in the various states– the liability to complete them is about N2trillion.
“So, when you look at N400billion,you know that that that is not enough, but when you compare what this administration is going to do with the N400billion, with what the last administration did,you will know it is much progress.
“What the last administration did was to budget N18billion for all the roads in the country, knowing the liability was in excess of N2trilion.
“For the three sectors,that is Works,Housing and Power, the total budget by the last administration was N24.5billion. So,this administration decided to move away from that and that is why we have a figure that may not be enough, but substantial for the sectors“he said.
In the power sector,the minister said though there were many challenges facing the sector ,the government would do everything possible to fulfill its promise to revamp it.
He said the 5,000megawatts the country was generating was inadequate and explained that the government was completing some ongoing power projects and and taking other steps to boost generation.
On electricity metering,Fashola said his ministry was engaging the distribution companies to ensure that they distribute metres to households.
He said it was through metering that consumers could be appropriately charged and that power companies themselves could block revenue leakages.
The minister said government was designing a housing model for the country that would not only take care the problem of affordability but also take into consideration cultural suitability in every part of the nation

http://www.pmnewsnigeria.com/2016/04/25/fg-requires-n2trn-to-complete-ongoing-road-projects-fashola/

2 Likes 1 Share

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by catchfun: 6:51pm On Apr 25, 2016
Tor

2 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by inforesource: 7:01pm On Apr 25, 2016
You need more than 2tr, just know that govt is continuum. Do your best and leave the rest.

9 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by basilo101: 7:05pm On Apr 25, 2016
The honourable minister of darkness has spoken

65 Likes 4 Shares

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by DesChyko: 8:00pm On Apr 25, 2016
The money will be disbursed with With one set of conditions:

The first being That you will not open another website again to showcase the roads this administration may build.

The second is to denounce allegience to a '6-letter' word beginning with T and ends with U.

18 Likes 2 Shares

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by paix(m): 8:32pm On Apr 25, 2016
The honorable minister should not forget our (Kaduna) Eastern Bye-pass , that road has been abandoned for over 10 years now.

3 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Nairadays: 8:41pm On Apr 25, 2016
Thinking Minister cheesy

"So, when you look at N400billion,you know that that that is not enough"

Was the Honourable Minister quoted out of context or it's just a grammatical overfault? I sincerely know that this work might be too much for our dear minister.

God help him.

5 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Trexnemesis(m): 8:43pm On Apr 25, 2016
Nairadays:
Thinking Minister cheesy

I think.

1 Like

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by adex15: 8:43pm On Apr 25, 2016
2trn ke..where you wan c am..Naija Go beta..shey na 2dy?

2 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Category1: 8:45pm On Apr 25, 2016
[size=15pt]the kind ministers wey bubu appoint sef dey give me headaches....
U go see minister of petroleum dey talk about power, u go see minister of power dey talk about road, u go see minister of transportation dey talk about finance..

Which kind dullardinhós full ministers sef? [/size]

19 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Akwasi(m): 8:46pm On Apr 25, 2016
These guys just don't respect us.

8 Likes 1 Share

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Nobody: 8:46pm On Apr 25, 2016
please Oga face the electricity situation first angry

13 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Akwasi(m): 8:46pm On Apr 25, 2016
Hmm

11 Likes 1 Share

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by timilehing(m): 8:46pm On Apr 25, 2016
2 trillion pere

2 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by motobid(m): 8:46pm On Apr 25, 2016
comot the money for TSA now, we go still get balance sef.
Thank you sir.

2 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Sunofgod(m): 8:47pm On Apr 25, 2016
Only...
Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Daniel058(m): 8:47pm On Apr 25, 2016
Make una go print more money nah..

4 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by YOMIT(m): 8:48pm On Apr 25, 2016
This people can complain for Sango sha. sad

4 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by daniska3yaro(m): 8:48pm On Apr 25, 2016
Hmmm

1 Like

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by raycoolman(m): 8:48pm On Apr 25, 2016
ok

2 Likes 2 Shares

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by macaranta(m): 8:49pm On Apr 25, 2016
Okay
Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by SamuelAnyawu(m): 8:49pm On Apr 25, 2016
That's quite a huge sum of money

3 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by ednut1(m): 8:50pm On Apr 25, 2016
instead of Them to find solution all they do is restatement of problem. i remember when i dey primary 6 Mr okafor taught us diversification of d economy. tomrw osibanjo will come nd tell us same. bloody kunts

2 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Pavarottii(m): 8:50pm On Apr 25, 2016
That's why I don't like APC as a party, even I try to manage dem cos they think we are still campaigning. Must they talk about last administration every time they talk or want to make promise. The blame on the past government is NAUSEATING.
All these talk ain't working again. Let work start. Thank God GEJ's budget was never more than 4.5trillion and projects were going. Let's see wat buhari's budget of over 6trilllion naira yield."Only time will tell"

Everybody is writing how much dey need. Is this how GEJ's ministers where mentioning how much dey need?

9 Likes 2 Shares

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by vickylincon(m): 8:52pm On Apr 25, 2016
just loved this man, He acknowledge there's problem, he also acknowledge he's not doing though due to some constraints which he identified. He proffer near solutions to it, he states the steps he will take to achieve his objectives and how far he had gone. that's an administrative man

10 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by CaptainBomb(m): 8:54pm On Apr 25, 2016
Talk to saraki.

1 Like 1 Share

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by Almajiri1: 8:54pm On Apr 25, 2016
The 2 trillion is already domiciled in the TSA. It's all yours for the taking.

9 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by yinkslinks(m): 8:54pm On Apr 25, 2016
I am tired of APC, just in one day, lie mohammed, osinbade and fashola has made different statement with no action cry cry cry cry cry cry cry

9 Likes 2 Shares

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by mej67: 8:55pm On Apr 25, 2016
Nairadays:
Thinking Minister cheesy

Scare us with big figures. Fake over sold Fashola.

Why won't you tell the truth that most of the roads are multiple are projects, requiring multiple budgets.

Making it sound like all data money required na na.

6 Likes

Re: “FG Requires N2trn To Complete Ongoing Road Projects –fashola by blackpanda: 9:03pm On Apr 25, 2016
[s]
Pavarottii:
That's why I don't like APC as a party, even I try to manage dem cos they think we are still campaigning. Must they talk about last administration every time they talk or want to make promise. The blame on the past government is NAUSEATING.
All these talk ain't working again. Let work start. Thank God GEJ's budget was never more than 4.5trillion and projects were going. Let's see wat buhari's budget of over 6trilllion naira yield."Only time will tell"

Everybody is writing how much dey need. Is this how GEJ's ministers where mentioning how much dey need?
[/s]

What a mess!

1 Like

(1) (2) (3) (Reply)

No Money To Fix Refineries – FG / Abaribe: There’re Over 30 Separatist Groups In South-East Nigeria Alone / APCy Aspirants In Ondo Lobby First Lady, Tinubu’s Daughter Ahead Of Primary

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.