PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI / Construction Process Of A Wing Duplex+flat At Ajah (2) (3) (4)

(1) (2) (3) ... (53) (54) (55) (56) (57) (58) (59) ... (102) (Reply) (Go Down)

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by FastShipping: 7:40pm On Apr 25, 2016
EndiaSami:


Alright.
Yes, white it is
Yes. 07036341294.
Would show u via whatsapp.















Na my oga thread be this grin

I will call you shortly. Show me the toilet sets here. I don't want to view it through my phone
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by haryomikun(m): 11:28pm On Apr 25, 2016
Nice
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:00pm On Apr 26, 2016
haryomikun:
Nice
thanks Bro
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:10pm On Apr 27, 2016
Onuokwu:
Did you do the 3D rendition of this project yourself?

The balcony railings...are they wrought iron or steel pipes?
Yes. It's steel pipes


-----
MOORE----we design and build!

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:31pm On Apr 28, 2016
pmil:
GREAT JOB
hey . Quite a while.
Good to see you

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by majorbravo: 12:26pm On Apr 29, 2016
Just found this thread, well done op. I'm indeed impressed.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:57am On Apr 30, 2016
majorbravo:
Just found this thread, well done op. I'm indeed impressed.


------
And we won't let you down! Thanks.

2 Likes 1 Share

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:04pm On May 01, 2016
Happy New month!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:10pm On May 02, 2016
D stanchion in progress

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 11:06am On May 03, 2016
MOORE-DESIGN BUILD LTD
mooredesignbuild@gmail.com
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:15pm On May 04, 2016
We do structures right!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:57am On May 07, 2016
Imported flush doors

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by semitunde: 8:58am On May 07, 2016
segcymoor:
Imported flush doors

Pls how much is for a door like this? Did you pay for iinstallation and door handle apart? I want to compare it with an equally good locally made one I know...

Thanks.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by twinskenny(m): 9:59am On May 07, 2016
Baba Eku ise sir..thanks for the recommendation too
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:22pm On May 07, 2016
twinskenny:
Baba Eku ise sir..thanks for the recommendation too
Don't mention!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:36pm On May 08, 2016
semitunde:


Pls how much is for a door like this? Did you pay for iinstallation and door handle apart? I want to compare it with an equally good locally made one I know...

Thanks.
Brought by client from abroad. Don't ve idea of the price.

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by semitunde: 8:40pm On May 08, 2016
segcymoor:

Brought by client from abroad. Don't ve idea of the price.

Thanks bro.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Chekitaut: 6:22am On May 10, 2016
Delivered

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:57am On May 11, 2016
Chekitaut:
Delivered
yeah. Confirmed!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:45pm On May 11, 2016
Coping........neatly done!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:35pm On May 12, 2016
Going higher......

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:20pm On May 13, 2016
Partitioning wall for the units

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:28pm On May 13, 2016
Partitioning wall for the units.........
MOORE-DESIGNBUILD LTD
.....we do structures right!
mooredesignbuild @gmail.com

1 Share

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Topselg: 11:40pm On May 13, 2016
Good speed boss. Almosst completed
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:20am On May 14, 2016
[quote author=Topselg post=45599936]Good speed boss. Almosst completed[/quote
..Na so o. I hope you are still handling the external works for us
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Topselg: 8:24am On May 14, 2016
Na so o. I hope you are still handling the external works for us
[quote author=segcymoor post=45603714][/quote]

We are waiting for the completion of water stanchion and compound filling so that we commence the exteernal work. We are on standby. Am happy to be part of this great project

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:51pm On May 14, 2016
Topselg:
Na so o. I hope you are still handling the external works for us


We are waiting for the completion of water stanchion and compound filling so that we commence the exteernal work. We are on standby. Am happy to be part of this great project
Good!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:48pm On May 16, 2016
Kitchen. Cabinet

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:28pm On May 17, 2016
Dining fittings

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:17pm On May 19, 2016
MOORE -DESIGNBUILD LTD


--------------
We do structures right!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:18pm On May 19, 2016
MOORE -DESIGNBUILD LTD


------------------------------------
We do structures right!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:44pm On May 20, 2016
View

(1) (2) (3) ... (53) (54) (55) (56) (57) (58) (59) ... (102) (Reply)

How Large Is 'A Plot' Of Land? / Prices For These Paints / Best Architectural, Interior And Construction Works

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 20
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.