Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,206,153 members, 7,994,929 topics. Date: Wednesday, 06 November 2024 at 03:01 AM |
Nairaland Forum / Nairaland / General / Politics / Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk (23151 Views)
3050MW Mambilla Hydropower Project Set To Start / 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off / Fashola Opens Apapa-Ijora Bridge As Emergency Repair Works Attains Milestone(pix (2) (3) (4)
(1) (2) (3) (4) (5) (Reply) (Go Down)
Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by kayfra: 5:55pm On May 07, 2016 |
The federal government has commenced discussions with the Taraba State Governor, Mr Dickson Ishaku to construct a 3050megawatts (mw) Mambilla Hydropower Plant in the state, Power Minister, Babatunde Fashola has announced. “We have opened discussions with the Governor of Taraba State, Governor Dickson Ishaku, who incidentally was once a minister of state for power," he said. “The first thing to do is to acquire the land and deal with compensation issues, which the governor has promised to deal with.” He said the project would be “the single largest power plant with over 3,000mw in one place and it potentially takes us close to steady power" if built. “The feasibility study has been done and so too the environmental impact assessment. We move one day at a time closer to starting Mambilla," he added. The project has been valued at $5.732billion (about N1.140trillion) with the Engineering, Procurement and Construction (EPC) contract proposed for two Chinese companies, Gezhouba Construction Group Corporation (CGGC), and the Sinohydro Corporation. An official said the project would take 63 months to complete and be handed over to the federal government. Nigeria is expected to contribute 25 per cent of the project’s fund while the China Export Import Bank provides 75 per cent. www-nigerianbulletin-com-threads-fashola-opens-talks-on-construction-of-3050mw-power-plant-in-taraba-210850 18 Likes 3 Shares
|
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by oduastates: 5:57pm On May 07, 2016 |
Step in the right direction. No more gas plants until other sources of gas are tapped. All those gas Wells in the benue and Niger basin,that the government sealed off in the 70's,should be brought back to play. Fashola said that Nigerian windspeed is not strong enough for win power. Maybe in Nigeria. Definitely not in yorubaland Has he been to badagry? Like 100 meters to the shoreline. I've been close enough to windmills in Netherlands, United Kingdom and America. The windspeed in those locations have nothing on badagry. Potential sites for hydro power in yorubaland.some are small and some are massive. They can supply between 10MW and 1000MW each. Supply the energy generated to local communities and feed the excess into the grid. Hopefully an autonomous or independent yoruba grid and country. Some (not all of the potential hydro) Eriwe Fish Farm Reservoir Farm Complex Reservoir Oyan River Dam Texagari Dam Awara Dam Egbe Dam Ero Dam Erusu Dam Ogbese Dam Owena Dam Asejire Reservoir Ede/Oshogbo Reservoir Eko-Ende Reservoir Erelu Reservoir Eruwa Reservoir Esa-Odo Reservoir Eni-Osa Ojoo Dam I.I.T.A. Reservoir Model Fish Farm Reservoir Ogbomoso Reservoir Ogunpa Reservoir Otiki Reservoir Shaki Dam Jebba dam 71 Likes 2 Shares
|
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by ALISMILE(m): 6:01pm On May 07, 2016 |
This govt is wise in taking steps to gradually move away from oil dependence! It will get to a stage our oil in d ND will no longer be relevant! 66 Likes 3 Shares |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by UAE123(m): 6:03pm On May 07, 2016 |
I seriously appreciate the federal government on this move and they should immediately award d contract because I am tired of the unstable power supply with high billing. 25 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by daniska3yaro(m): 6:04pm On May 07, 2016 |
Taraba hmm |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by maryam6(f): 6:05pm On May 07, 2016 |
Nice one 4 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by kcnwaigbo: 6:05pm On May 07, 2016 |
ALISMILE: Lolz will the hydro power plant also provide enough forex and revenue for you to run the country? 12 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 6:10pm On May 07, 2016 |
One quote says The project is going to take 63 months to complete Thats roughly 2,190 days Or more importantly 52,560 hrs One could even say 3,153,600 minute Perhaps it could also be 189,216,000 seconds Start counting. 20 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by ALISMILE(m): 6:10pm On May 07, 2016 |
kcnwaigbo:That why I said steps! Note the plurality! Tthe govt is serious about diversifying the economy! Its gonna take time! But I believe the govt can do it! The unpredictability of oil prices and the unprovoked militant activities re already enough motivation for the govt! 29 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 6:21pm On May 07, 2016 |
We've been hearing this since 1975. No need to still be excited. Lubbish 12 Likes 1 Share |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Keshkele: 6:21pm On May 07, 2016 |
APC is running out of time to fix this country 5 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Akby(m): 6:22pm On May 07, 2016 |
Fashola is working 7 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by micktoxin(m): 6:23pm On May 07, 2016 |
This isn't enough to power a fully industrialised Lagos let alone a whole country. This is a good step nevertheless. 1 Like |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Ajibel(m): 6:23pm On May 07, 2016 |
I like the idea of this government to build power generating infrastructures in areas that have competitive advantage of the required natural resources to generate power. That way, there wont be need of these long transmission lines that are always vulnerable to be vandalized. And then, no one can hold the country afterwards by destroying gas pipes that supply gas to power infrastructures, because if they do, it'll only affect their area. But then, it'll take up to 5 years to complete Nigeria's Electricity Challenge: A Roadmap For Change: http://www.tundefashola.com/archives/news/2016/05/05/20160505N01.html 15 Likes 1 Share |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Amberon: 6:23pm On May 07, 2016 |
yep |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by UjGina: 6:24pm On May 07, 2016 |
63 months indeed!Another white elephant project to settle cronies. 7 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by WASMOG(m): 6:24pm On May 07, 2016 |
ok |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 6:24pm On May 07, 2016 |
I lost interest in the Project after reading it will take up to 63 Months! When am I gonna enjoy steady power supply for God's sake?! Seems the News is a rumor! Still liking PMB and his polices though! 12 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Decibel: 6:24pm On May 07, 2016 |
Coming from the Minister of darkness, clowns everywhere 10 Likes
|
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Deen77: 6:25pm On May 07, 2016 |
Keshkele: If you wait for 16 years of PDP, wait for APC 4 years. 48 Likes 3 Shares |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Firefire(m): 6:26pm On May 07, 2016 |
Well done to FG, let apply speed. 3 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by cold(m): 6:27pm On May 07, 2016 |
Ok let's just say i'm in a light mood right now so would restrain myself and watch this space... |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Deen77: 6:27pm On May 07, 2016 |
adeyemi2015: That is why PDP failed for 16 years, major project take years, power plant and refinery. 15 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Febilish(m): 6:27pm On May 07, 2016 |
Hopefully there would be tangible action to follow. |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by bettercreature(m): 6:27pm On May 07, 2016 |
This silllly people should build one power plant in ibadan,lagos or ondo state,those 3 states are the safest and most stable states Lagos and ondo are now producing oil so their is going to be enough gas to fuel the plants I don't trust the north or those region called south south/east part of Nigeria 6 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Skykid1208(m): 6:28pm On May 07, 2016 |
It's gonna take 5 years 3 months from start to finish?? That means another tenure for APC led government!!! Nice on though 5 Likes 1 Share |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 6:28pm On May 07, 2016 |
Ishaku talk to your boys Mama Taraba pls talk to the girls and mothers Fashola talk to Adeosun for cash Chinese can you scale up the MW to 10,000 3 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by gunuvi(m): 6:28pm On May 07, 2016 |
any sensible government should be able to fix power problems in 6 months...fashola, 2015 mambilla powerplant alone will be completed in 63 months....fashola, 2016 8 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by donfranklin(m): 6:29pm On May 07, 2016 |
Ok |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by teehay45(m): 6:29pm On May 07, 2016 |
Steps in the right direction If completed it will reduce the dependence on the gas stations 2 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by malton: 6:29pm On May 07, 2016 |
adeyemi2015: Building of power plants isn't child's play. It takes time, resources and commitment. The Three Gorges Dam in China took 15 years and 25 billion pounds to build to completion. 16 Likes 1 Share |
'I Won’t Change If Reelected' - Buhari Assures / The People's Presidential Debate Live On TVC / Kwankwaso Did Not Congratulate Tinubu — NNPP
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 27 |