Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,206,153 members, 7,994,929 topics. Date: Wednesday, 06 November 2024 at 03:01 AM |
Nairaland Forum / Nairaland / General / Politics / Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk (23151 Views)
3050MW Mambilla Hydropower Project Set To Start / 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off / Fashola Opens Apapa-Ijora Bridge As Emergency Repair Works Attains Milestone(pix (2) (3) (4)
(1) (2) (3) (4) (5) (Reply) (Go Down)
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 6:30pm On May 07, 2016 |
Berra be |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by ALISMILE(m): 6:30pm On May 07, 2016 |
micktoxin:This will go a long way since it will almost double the current figure we re grappling with! 1 Like |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by tinsel: 6:30pm On May 07, 2016 |
daniska3yaro:You want the government to build it in your place so that you can go and blow it up or sabotage it. 6 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by clevadani: 6:30pm On May 07, 2016 |
G |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by ChrisObioha(m): 6:30pm On May 07, 2016 |
Nigerian government, making promises since 1960. 1 Like |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by tbaba1234: 6:34pm On May 07, 2016 |
kcnwaigbo: It is not difficult to diversify from oil, it will just take time. Oil is only 13% of GDP. With proper tax coverage, oil can be made less relevant. 4 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by thugthang(m): 6:34pm On May 07, 2016 |
My state daniska3yaro: |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by kokoA(m): 6:34pm On May 07, 2016 |
I just have this believe that any contract awarded by Buhari's government will be executed properly. People are so scared of looting under him. 5 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by IrradiatoR: 6:36pm On May 07, 2016 |
Penisinpenisout:thank you o, instead of them to simply tell us it'll take them about 5 1/2 years 2 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by datola: 6:36pm On May 07, 2016 |
63 months is over 5 years! |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by tbaba1234: 6:37pm On May 07, 2016 |
adeyemi2015: It takes 5 years to build a hydro power plant of this size. Mambilla is no rumour. 5 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by FOLYKAZE(m): 6:39pm On May 07, 2016 |
The North should gear up for solar farm for solar farm. The South east should revamp their Coal and use that as source of their power. We in the South west will develop nuclear power plant. Everyone needs to get off Niger Delat and their gas 5 Likes 1 Share |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by defash8: 6:39pm On May 07, 2016 |
No major projects will be commissioned in the first term of this government except those left by GEJ, the is because Buhari left it late to start. Even this project has not commenced hence 63 months commenced next few months. Anyway, a journey of 1000miles start with one step in right direction. |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nicepoker(m): 6:40pm On May 07, 2016 |
oduastates:continue to deceive ur self. Bad belle. 2 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by tobyemmanuel(m): 6:41pm On May 07, 2016 |
Rubbish! Mambilla PP is still under construction since jonathan regime. Now they are just awarding contract of an under construction plant. I am no wailer but who is fooling who. Check wikipedia, mambiila pp was expected to finish dis year 2 Likes 2 Shares |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nicepoker(m): 6:42pm On May 07, 2016 |
bettercreature:u use crude oil to power gas plants |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by GWMI(m): 6:42pm On May 07, 2016 |
I laugh when people say we will soon leave the oil from Niger Delta.The last time i checked above 75% of our revenue still comes from the oil how can you then build or develop other regions without money?Think sometimes and stop writing nonsense all because you want to be holier than the north or maybe you want to continue the hate buhari have sow between the north and the south.Whether you like it or not the economy of this nation is tied to the South and no matter what will happen the south will still be more devloped and advance than the north .Thanks. 1 Like |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 6:43pm On May 07, 2016 |
Penisinpenisout:Or you can say 5 yrs 3 months |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by chudionu58(f): 6:44pm On May 07, 2016 |
Zombies, Jonathan has already awarded the two biggest hydro projects in Nigeria...Mambilla and Zungeru hydro power projects. http://www.thetidenewsonline.com/2012/11/19/fg-signs-mou-with-chinese-firms-…terminates-manitoba’s-hydro-power-contract/ What stalled the flag off(of the mambilla) was because of the 15% counterpart funding which was expected to be recouped from the privatisation of the NIPPs but which wasn't ready due to some teething challenges. Therefore, Fashola should quietly continue the implementation of the two contracts and not trouble our ear drums as if they've done something we've never seen on the two projects. 3 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nicepoker(m): 6:44pm On May 07, 2016 |
FOLYKAZE:that's how it should be leave ND alone. Slave |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 6:45pm On May 07, 2016 |
FOLYKAZE:Solar power can be utilized in any area of the country. I'd recommend solar power for largely rural communities where electricity demand isn't too high 2 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by symbianDON(m): 6:46pm On May 07, 2016 |
UjGina:considering that the Chinese are bringing 75% to the table while our government brings 25%, I don't see how 'cronies' will benefit. Also, I doubt the Chinese will want to see their money go down the drain. however one looks at it, this is laudable project if executed as planned. 5 years and 3 months isn't such a long time really. 3 Likes 1 Share |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by tbaba1234: 6:47pm On May 07, 2016 |
tobyemmanuel: Mambilla has not started. The idea was first conceived in 1982. Jonathan tried to revive it but it was cancelled again in 2013. Nigeria could not pay their part of the money which was 15%. But Buhari renegotiated the deal. 8 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by colosa: 6:48pm On May 07, 2016 |
DAT is great, good work of GEJ |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by tbaba1234: 6:49pm On May 07, 2016 |
colosa: No it isn't... 4 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by keaderr: 6:49pm On May 07, 2016 |
The Ikere Gorge Dam that was abandoned can generate close to 4000MW; I wonder why nobody is talking about it. FG needs to revisit this project. 2 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by colosa: 6:49pm On May 07, 2016 |
Good work of GEJ 1 Like |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by kayfra: 6:50pm On May 07, 2016 |
tobyemmanuel: Can you stop sucking on GEJ's balls so hard? This has been in the works for decades. 7 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by tbaba1234: 6:53pm On May 07, 2016 |
chudionu58: All these Jonathan fans def... Mambilla was cancelled in 2013 due to the failure of Nigeria to meet their part of the agreement. http://sweetcrudereports.com/2013/12/26/nigeria-admits-failure-to-award-mambilla-hydro-contract/ The deal was renegotiated by Buhari. http://thenewsnigeria.com.ng/2015/12/buhari-woos-china-over-20-3b-rail-projects-mambilla-dam/ 6 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Nobody: 7:00pm On May 07, 2016 |
kcnwaigbo:Very unwise comment from you, they are other ways to generate revenue apart from oil, agriculture is also coming up, even we in the nd delta have started tinking beyond oil, uduaghan started the delta beyond oil campaign and its working fine. Our dependency on oil will reduce over the years. 4 Likes |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by Angoni(m): 7:00pm On May 07, 2016 |
For 4.5 Billion USD, Ethiopia will be getting 6,000 megawatts from the Renaissance dam. Nigeria wants to get 3,000 Megawatts with 5 Billion USD investment. Fashola will always take a cut like he did for his trains. 1 Like |
Re: Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk by ritahot(f): 7:00pm On May 07, 2016 |
Any serious government will fix power in six months...fashola 2014. He is a typical yoruba, hypocrisy is his surname! 2 Likes |
'I Won’t Change If Reelected' - Buhari Assures / The People's Presidential Debate Live On TVC / Kwankwaso Did Not Congratulate Tinubu — NNPP
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38 |