Re: Can Someone Please Help Me With This ????? by jajajaja828: 7:13am On May 11, 2016
Can someone direct me where I Can see the price of building materials in Nigeria. Thanks.
Re: Can Someone Please Help Me With This ????? by Funseyi(f): 7:14am On May 11, 2016
[quote author=n3xt post=45508520]The figure quoted is not too much for any type of foundation adopted.

Just find out if all the items mentioned below are included in the scope of work (assuming it's a strip foundation):

1. Setting out
2. Excavation
3. Blinding
4. Preparation of Column Base
5. Starter Bars reinforcement
6. Foundation blocks
7. Formwork for the starter bars
8. Sandfilling
9. Surface treatment (Compacting, Laying of Damproof Membrane, Blinding, Mesh reinforcement etc)
10. DPC formwork
11. Rough-in pipe work for mechanicals
12. Pouring of the DPC concrete.

I'm 100% confident that the estimate given is not for a raft foundation.

Also find out the height of the foundation because if it includes materials, labour and supervision, you need to be sure of what you're walking into.

No matter how much of compromise your contractor is willing to make on this build, he will definitely need to make provision for the following if not more:

1. Granite - 150k
2. Sand (4) - 160k
3. Iron rod (1 ton) - 130k
4. Rings and binding wires - 20k
5. Cement (180 bags) - 270k
6. Blocks based on the partitions and 4 block height (1500 pcs) - 240k
7. Planks and Nails - 50k
8. Sandfilling - ??
9. Plumbing materials - ??
10. Miscellanous (DPM, etc) - ??

Please what if someone want to build 4 standard bedroom flat?
Re: Can Someone Please Help Me With This ????? by Kaldakinn: 7:15am On May 11, 2016
Present
Re: Can Someone Please Help Me With This ????? by Nobody: 7:18am On May 11, 2016
Exline101:
Please this is a plan of a house am building and am currently not in Nigeria to see how things are going.But the Engineer handling it gave me a quotation of 2M from Foundation to DPC ( German floor) he's labour and supervision is included on the amount..... He said materials will cost about 1.4M and while his labour and supervision will cost 600K making it a total sum of 2 M .... So what I want to know now is if the 600k for labour/supervision from just foundation to DPC ( German floor) is okay or is too much Please advice and suggestion needed.

You should hire a Quantity Surveyor.

Hey, @Tossen, how far madam? grin

1 Like

Re: Can Someone Please Help Me With This ????? by Okeyson4wisdom(m): 7:20am On May 11, 2016
Keneking:
3.5million budget pls including building approvals.

We don't support illegality on this forum.

Get approval before starting anything to avoid stories that touch.

Provide area boys and baale money as well.
u sound like one of those tax collectors grin
Keneking:
3.5million budget pls including building approvals.

We don't support illegality on this forum.

Get approval before starting anything to avoid stories that touch.

Provide area boys and baale money as well.
u sound like one of those tax collectors

1 Like

Re: Can Someone Please Help Me With This ????? by kingmassa(m): 7:21am On May 11, 2016
Cheap is expensive, that cost is not much, I took time to read many comments and I noticed a lot of quacks. Please sir I suggest u bargain with your engineer for a slash of 100k except you want him to do shoddy jobs for you. If u are in doubt of the cost, u can invovle ur family members who will buy the materials, pay the labourers den you pay ur engineer the supervision fee of 200k hw about that.
Re: Can Someone Please Help Me With This ????? by uvalued(m): 7:21am On May 11, 2016
that is why i check nl for interesting topic like thiw #2yearsfromNow
Re: Can Someone Please Help Me With This ????? by utenwuson: 7:22am On May 11, 2016
2m to foundation? u don't have a brother or nephew who can @ least get change frm d workmanship? this is more like a three day work, I wouldn't want 2 spoil my colleague contract but negotiate a bit, IT'S TOO much
Re: Can Someone Please Help Me With This ????? by clip: 7:23am On May 11, 2016
Exline101:
Please this is a plan of a house am building and am currently not in Nigeria to see how things are going.But the Engineer handling it gave me a quotation of 2M from Foundation to DPC ( German floor) he's labour and supervision is included on the amount..... He said materials will cost about 1.4M and while his labour and supervision will cost 600K making it a total sum of 2 M .... So what I want to know now is if the 600k for labour/supervision from just foundation to DPC ( German floor) is okay or is too much Please advice and suggestion needed.

From your write up,you do not have 100% confidence in your Engr to give you value for your money.In view of this, i will rather recommend that you consult any NIESV members company with your brief. They can get you property with C of O which can easily be verified.That we give you peace of mind than going through all the stages of construction.
Re: Can Someone Please Help Me With This ????? by utenwuson: 7:25am On May 11, 2016
2m to foundation? u don't have a brother or nephew who can @ least get change frm d workmanship? this is more like a three day work, I wouldn't want 2 spoil my colleague contract but negotiate a bit, IT'S TOO much, from d plan, ds is a renting house, 2 rooms n parlour, so u don't even need a heavy German floor,
Re: Can Someone Please Help Me With This ????? by n3xt(m): 7:26am On May 11, 2016
Funseyi:
Please what if someone want to build 4 standard bedroom flat?

Cost is dependent on location, design of the building and the terrain (dry or waterlogged)

1 Like

Re: Can Someone Please Help Me With This ????? by ladyF(f): 7:26am On May 11, 2016
Cost is 1.4m, and his supervision is 600K? shocked How can he be charging almost 50% for his supervision? So if you end up spending 10m on the house, you will give him 5m for supervision? It's not done anywhere abeg.
Re: Can Someone Please Help Me With This ????? by kinibigdeal(m): 7:30am On May 11, 2016
So you expected a bill of 1m for both materials and labour who you epp

1 Like

Re: Can Someone Please Help Me With This ????? by NwaEzefuNaMba(m): 7:31am On May 11, 2016
n3xt:
The figure quoted is not too much for any type of foundation adopted.

Just find out if all the items mentioned below are included in the scope of work (assuming it's a strip foundation):

1. Setting out
2. Excavation
3. Blinding
4. Preparation of Column Base
5. Starter Bars reinforcement
6. Foundation blocks
7. Formwork for the starter bars
8. Sandfilling
9. Surface treatment (Compacting, Laying of Damproof Membrane, Blinding, Mesh reinforcement etc)
10. DPC formwork
11. Rough-in pipe work for mechanicals
12. Pouring of the DPC concrete.

I'm 100% confident that the estimate given is not for a raft foundation.

Also find out the height of the foundation because if it includes materials, labour and supervision, you need to be sure of what you're walking into.

No matter how much of compromise your contractor is willing to make on this build, he will definitely need to make provision for the following if not more:

1. Granite - 150k
2. Sand (4) - 160k
3. Iron rod (1 ton) - 130k
4. Rings and binding wires - 20k
5. Cement (180 bags) - 270k
6. Blocks based on the partitions and 4 block height (1500 pcs) - 240k
7. Planks and Nails - 50k
8. Sandfilling - ??
9. Plumbing materials - ??
10. Miscellanous (DPM, etc) - ??


Bros planks and nails 50k??
When last did you visit timber marker?

2 Likes

Re: Can Someone Please Help Me With This ????? by Barselonia(m): 7:33am On May 11, 2016
Arcespion:
Materials won't cost more than 700-850k based on that plan. Workmanship varies according to location but for a place like Lagos which is the more expensive between the two cities I've experienced, it shouldn't cost more that 150-250k for 4-6 days of work.

brother, don't just jump into conclusion like that, u don't know the foundation type or thee section, all u see in the pic is excavation layout.... presenting handling a project like that now,although am nnot. in charge of material But with what we have use, nno be small thing
Re: Can Someone Please Help Me With This ????? by n3xt(m): 7:33am On May 11, 2016
NwaEzefuNaMba:



Bros planks and nails 50k??
When last did you visit timber marker?

Did you read the part where I said "No matter how much of compromise"

I was only giving a worse case scenario.
Re: Can Someone Please Help Me With This ????? by smiley001(m): 7:34am On May 11, 2016
My signature says it all.
Re: Can Someone Please Help Me With This ????? by NwaEzefuNaMba(m): 7:34am On May 11, 2016
n3xt:

Did you read the part where I said "No matter how much compromise"
I was only giving a worse case scenario.
sorry I did quote out of ignorant!
Just that sighted that particular paragraph as I was passing by. cheesy
Re: Can Someone Please Help Me With This ????? by Miscellaneous(m): 7:35am On May 11, 2016
Abdulwastecx et Podosci

your assistance is needed.... on this thread
Re: Can Someone Please Help Me With This ????? by n3xt(m): 7:36am On May 11, 2016
NwaEzefuNaMba:


sorry I did quote out of ignorant!

Just that sighted that particular paragraph as I was passing by. cheesy

Nice one mate. Have a good day!
Re: Can Someone Please Help Me With This ????? by fendorf(m): 7:38am On May 11, 2016
Exline101:
Please this is a plan of a house am building and am currently not in Nigeria to see how things are going.But the Engineer handling it gave me a quotation of 2M from Foundation to DPC ( German floor) he's labour and supervision is included on the amount..... He said materials will cost about 1.4M and while his labour and supervision will cost 600K making it a total sum of 2 M .... So what I want to know now is if the 600k for labour/supervision from just foundation to DPC ( German floor) is okay or is too much Please advice and suggestion needed.
Contact us for your Granite and sharpsand.07064696356
Re: Can Someone Please Help Me With This ????? by Barselonia(m): 7:40am On May 11, 2016
Exline101:
Please this is a plan of a house am building and am currently not in Nigeria to see how things are going.But the Engineer handling it gave me a quotation of 2M from Foundation to DPC ( German floor) he's labour and supervision is included on the amount..... He said materials will cost about 1.4M and while his labour and supervision will cost 600K making it a total sum of 2 M .... So what I want to know now is if the 600k for labour/supervision from just foundation to DPC ( German floor) is okay or is too much Please advice and suggestion needed.

sir can u b more specific about the foundation type or the area So we can know the type. of foundation going down there..

and again d engineer suppose to give the breakdown of the material to buy ...

And u need a friend or family member to represent u onsite as client
Re: Can Someone Please Help Me With This ????? by temiprinciple(m): 7:42am On May 11, 2016
just make sure u av a trustworthy person to be in charge since u are not in d country at d moment. avoid been use as ATM by d engineers. talking from experience
Re: Can Someone Please Help Me With This ????? by tossen(f): 7:44am On May 11, 2016
EgunMogaji:


You should hire a Quantity Surveyor.

Hey, @Tossen, how far madam? grin
. After ur epistle on how helplessly irrelevant I am... There's no need to further throw jabs. Help the man with his small problem while I focus on industrial and commercial projects.

1 Like

Re: Can Someone Please Help Me With This ????? by 4nobody4every1: 7:44am On May 11, 2016
EgunMogaji:


You should hire a Quantity Surveyor.

grin
l am a registered surveyor, l am the one who surveyed your land at Ibadan and l did a nice job and you compensated me with several gifts, why not recommend me to handle this job, l will handle it very well at a cheaper cost grin

1 Like

Re: Can Someone Please Help Me With This ????? by fippycbk(m): 7:45am On May 11, 2016
EgunMogaji:


You should hire a Quantity Surveyor.

Hey, @Tossen, how far madam? grin

Yes, he should. Make everybody play him wing. grin

1 Like

Re: Can Someone Please Help Me With This ????? by crystalzoe: 7:47am On May 11, 2016
utenwuson:
2m to foundation? u don't have a brother or nephew who can @ least get change frm d workmanship? this is more like a three day work, I wouldn't want 2 spoil my colleague contract but negotiate a bit, IT'S TOO much
Three days for pegging excavation columnbase foundationcasting blockwork boarding and casting of pillars backfilling ramming and German floor! Bros where u dey do ur own construction a beg?

2 Likes

Re: Can Someone Please Help Me With This ????? by fippycbk(m): 7:57am On May 11, 2016
crystalzoe:

Three days for pegging excavation columnbase foundationcasting blockwork boarding and casting of pillars backfilling ramming and German floor! Bros where u dey do ur own construction a beg?

I see the thing laugh... grin

1 Like

Re: Can Someone Please Help Me With This ????? by RALPHOW(m): 7:58am On May 11, 2016
Arcespion:
Materials won't cost more than 700-850k based on that plan. Workmanship varies according to location but for a place like Lagos which is the more expensive between the two cities I've experienced, it shouldn't cost more that 150-250k for 4-6 days of work.


THE QUOTATION IS ALRIGHT I AM IN NIGERIA AND JUST SPENT 1.6M ON ONLY 5 BEDROOM DUPLEX GERMAN FLOOR
GUYS SAID EVERYTHING WILL BE 850K, BY THE TIME I STARTED BUY THIS BUY THAT, I SPENT 1.6M
THE GUYS QUOTING LESSER ARE NOT BUILDING, IN REAL PRACTICAL THE QUOTATION IS ALRIGHT.
HOWEVER YOU NEED SOMEBODY YOU CAN TRUST WHO WILL MAKE SURE THE ENGINEER BUY GOOD AND QUALITY MATERIALS.
GOODLUCK
Re: Can Someone Please Help Me With This ????? by richling77(m): 8:01am On May 11, 2016
Barselonia:


brother, don't just jump into conclusion like that, u don't know the foundation type or thee section, all u see in the pic is excavation layout.... presenting handling a project like that now,although am nnot. in charge of material But with what we have use, nno be small thing


Hello,

kindly send me your phone number via richling77@yahoo.com
thanks
Re: Can Someone Please Help Me With This ????? by lmm4real: 8:02am On May 11, 2016
Exline101:
Please this is a plan of a house am building and am currently not in Nigeria to see how things are going.But the Engineer handling it gave me a quotation of 2M from Foundation to DPC ( German floor) he's labour and supervision is included on the amount..... He said materials will cost about 1.4M and while his labour and supervision will cost 600K making it a total sum of 2 M .... So what I want to know now is if the 600k for labour/supervision from just foundation to DPC ( German floor) is okay or is too much Please advice and suggestion needed.


its even too cheap, pay up fast and hold his balls if he doesn't deliver
Re: Can Someone Please Help Me With This ????? by solonzoteam(m): 8:04am On May 11, 2016
where s d location? if it's within South East or South South, den call me on 08080998012 let me tell u how to go abt it.where s d location? if it's within South East or South South, den call me on 08080998012 let me tell u how to go abt it.where s d location? if it's within South East or South South, den call me on 08080998012 let me tell u how to go abt it.

(1) (2) (3) (4) (Reply)

What Kind Of House Can I Build With 3m / BUY YOUR LAND IN ILORIN, KWARA STATE IN A NICE & SUITABLE LOCATION... / List Of Building Materials In Nigeria And The Price Qoutes

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 51
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.