Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by mufutau55(m): 3:02pm On Apr 14, 2016 |
I am surely following... good work. Hajji M. 1 Like 1 Share |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 2:41pm On Apr 17, 2016 |
More block works pictures. Thanks for following this thread; more so, stay tuned. 1 Share
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 6:39pm On Apr 20, 2016 |
Stage 8: Casting of the connecting lintel and columns: Excavation for perimeter fence, and soak away (Completion) Details Beam Depth of lintel beam: 225mm Width of lintel beam: 225mm Columns 225mm x 225mm Materials: Cement: 25 bags Sharp sand: 10 tonns Granite: 10 tons 1 x 12" 60 length 2" Concrete nail Workmanship for Carpenter; N25,000 Casting: N50,000 Y12 iron bars: 20 lenghts. Y10 iron bars: 8 lenghts.
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 9:27pm On Apr 20, 2016 |
More pictures
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 10:43am On Apr 27, 2016 |
Images of: More Block work on the Main Building Block work for the Soakaway PreCast column finishes[b][/b]
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 10:45am On Apr 28, 2016 |
More pictures.
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 10:29am On May 04, 2016 |
More block work images/ form work for Gate house Dpc
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by NaijaFutbol: 2:07pm On May 18, 2016 |
Awesome work on the redesign! Some questions though: 1. why the rods on the floor DPC for a bungalow. 2. I can see you will use precast parapet roofing. Shouldn't you have had rod pillars at all corners and at some spacing say every 4 meters. Let me call on some other experts. I need to learn. CC: spyder880, abdulwastecx NF 2 Likes |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by abdulwastecx(m): 3:26pm On May 18, 2016 |
NaijaFutbol: This a wonderful project by my very good friend olabamijie... another wonderful product of fut Minna. Coming to your question, the rod for the dpc is to to make the building better, this reduce any possibility of settlement of the dpc. The building look solid enough with those corner pillars and it will be able to carry the precast provided their a well reinforced head beam... . 2 Likes |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 11:20am On May 21, 2016 |
NaijaFutbol: Thanks 1. If you look at the layout, you'll notice we implemented the interior changes after the dpc not at the initial digging/excavation stage; the reinforcement was to provide necessary and required support for the the internal walls so as to further prevent any case of settlement. Note: we ensured it is economical by using Y8 iron bars. 2. We plan to do Insitu cast for the Concrete facial though but to further answer your question, the four edge columns are functional; we'll adequately reinforce our head beam bearing in mind that the relative weight of our roof will be resting on those four ends, we ensured our lintel beam runs through the whole building thus linking the components (Beam/columns/foundation) adequately as you can see in the pictures. That's considerably efficient and cheaper compared to having columns at every here and there as you must have been used too. Once again, thanks for following and most importantly, your input. Regards Olabamijie 2 Likes |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 12:57pm On Aug 16, 2016 |
Hello everyone, sorry there had been no update on this particular project for a while now, that’s due to paucity in cash flow and colliding engagements. Henceforth, I will bring you up to date on how far we’ve gone and subsequently keep up with timely updates. Regards, Olabamijie. |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 1:15pm On Aug 16, 2016 |
Stage 9. Construction of form work for the Concrete fascia (Carpentry works, Reinforcement works). CONCRETE FASCIA: Type: in-situ cast Materials: Wood: Ply wood 15 1 x 12” 95 lenghts 2 x 3” 90 lenghts 3” nails 2” nails 1.5”nails Machine works. Reinforcement. Y12 Iron rods: 33 lenghts Y10 Iron rods: 30 lenghts Y8 Iron rods: 22 lenghts Binding wire: I roll
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 7:14pm On Aug 16, 2016 |
More images 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 12:20pm On Aug 18, 2016 |
Stage 10. Casting of the Concrete Fascia. Materials: Cement: 35 Bags Sharp Sand: 20 tons Granite 1/2": 20 tons Water: 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 4:26pm On Aug 18, 2016 |
More images
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 8:09pm On Aug 19, 2016 |
Casting of the Soakaway slab / Perimeter fencing 2 Likes
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 11:44am On Aug 22, 2016 |
Stage 11. CONSTRUCTION OF ROOF CARCASS. Expected roof height: 3.90m Day 1: Purchase and supply of timber for roof carcass. Materials; 2 x 6” Akputu wood 190 lenghts 2 x 4” Akputu wood 200 lenghts 2 x 3” Ebuni wood 290 lenghts 2 x 2” Ebuni wood 160 lenghts 4” nail 2cartons 3” nail 1carton 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 11:32am On Aug 24, 2016 |
Day 3
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 9:21am On Aug 25, 2016 |
More images
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 4:26pm On Aug 25, 2016 |
Updates on the Perimeter fencing...
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 3:51pm On Aug 27, 2016 |
Stage 12. FIXING OF LONG SPAN ALUMINIUM. Total Area: 340m2 Type of sheet: 0.55 foreign sheet. 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 5:08pm On Aug 28, 2016 |
Photo Speaks: Update on roof works. 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 1:27pm On Aug 30, 2016 |
Stage 13. ELECTRICAL PIPING AND PLUMBING WORKS. At the moment, we are working on both plumbing and electrical piping of the main building, perimeter fence and the gate house.
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by ricki: 4:09pm On Aug 30, 2016 |
I have to admit...... Just enjoying looking at this thread.....GOOD work guys 1 Like 1 Share |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 10:18am On Sep 01, 2016 |
Stage 13. PLASTERING. Day 1: Concrete fascia. 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 8:35pm On Sep 07, 2016 |
Picture update on the plastering works so far. 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 11:41pm On Sep 09, 2016 |
More photo update
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by OpaqueGroup: 6:00am On Sep 10, 2016 |
Cheap and spacious self contain apartment located in the heart of maitama. Client will have to renovate the apartment to personal taste, no brokers fee, no addition charges. 1 bedroom 1 toilet 1 kitchen parking lot security provided water provided 24/7 General Features Borehole Electric Fencing Flatlets Pets Allowed Satelite External Features Access Gate Garden Price N400,000 Maitama Abuja contact +2348174751876 |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 5:31pm On Sep 10, 2016 |
Placement and casting of base support for the Water tank stand. 1 Like
|
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 1:20pm On Sep 14, 2016 |
Hello everyone following this thread, thanks for your time and input. There is a little twist to this project: my client has been evicted by his landlord and he had vowed not to further pay rent or homage to any other landlord but rather he wants to start living the “lord” life as soon as possible despite the fact that he is technically broke at the moment. He consulted us at AJIB SHELTER for professional advice and we offered him the following which he gladly accepted. As we all may recall, that he is to reside in the One bedroom apartment (refer back to the Intro), while he let out the Two Bedroom section. As such, We resolved to: 1. Focus works henceforth on the one bedroom section to make it relatively conducive for him to pack in. 2. Use relatively cheap and durable materials for some of the building components while placing then on a short term use of about 3-4months in particular, the Ceiling. We’ll use the PVC material for the main time. We’ll revert back to POP when he must have saved enough to install that for the whole building. 3. Provide/Introduce Burglary at both entrances to cater for self-protection pending the time we’ll construct the Frontal perimeter fence and gate (Bearing in mind that this is also dependent on the bore hole drilling process and time) 4. Provide adequate electrical fittings 5. Place the screeding/ painting process as part of the long term as this will be done at once for the whole building once his cash flow is buoyant enough. I’ll post pictures as this unfolds. Stay tuned. Warm regards, Olabamijie cc. Hajji M cc. Lawyer 2 Likes |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 8:24am On Sep 18, 2016 |
ricki:b Yes boss, thank you sir. Olabamijie |
Re: DESIGN & CONSTRUCTION Of A 2 BEDROOM & 1 BEDROOM BUNGALOW(semi-de)IN LUGBE ABUJA by Olabamijie(m): 11:43am On Sep 22, 2016 |
Sequel to my last post, the following activities are going on at the moment on the project: i. Installation of Ceiling PVC. ii. Tilling works. iii. Electrical fittings. iv. Plumbing (water and waste system) fittings. More relative picture updates coming up soon. Regards, Olabamijie
|
What The Building That Collapsed In Port Harcourt Looked Like 3 Weeks Ago / DIY Construction Of My House In PH. / Can You Swim In These Swimming Pools!? -(pics Attached)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 32 |