Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,197,810 members, 7,965,981 topics. Date: Friday, 04 October 2024 at 06:34 AM

CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI - Properties (57) - Nairaland

Nairaland Forum / Nairaland / General / Properties / CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI (231478 Views)

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI / Construction Process Of A Wing Duplex+flat At Ajah (2) (3) (4)

(1) (2) (3) ... (54) (55) (56) (57) (58) (59) (60) ... (102) (Reply) (Go Down)

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by n3xt(m): 7:53am On May 23, 2016
segcymoor:
Partitioning wall for the units.........
MOORE-DESIGNBUILD LTD
.....we do structures right!
mooredesignbuild @gmail.com

Nicely done, Baba!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by DesBuild: 7:39pm On May 23, 2016
n3xt:


Nicely done, Baba!





Hey! D man of the people. How are u doing?
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:24pm On May 25, 2016
DesBuild:






Hey! D man of the people. How are u doing?
Hey! Man of the people..... How runs
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:15pm On May 25, 2016
Finishing touches!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:12am On May 26, 2016
segcymoor:
Finishing touches!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:31am On May 27, 2016
Tastefully finished terrace house now available for sale!

*4Bedroom with attached BQ
*Ample parking
*Serene environment
*Good paved road to the site
*Easy accessibility..... Just by the chevron toll gate
*Approved plan with Cosent

50m only!

2 Likes

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Chekitaut: 9:03am On May 27, 2016
Beautiful works from a wonderful engineer.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:25pm On May 27, 2016
Chekitaut:
Beautiful works from a wonderful engineer.
Bro...no be small things

-------------------
Na thorough attention to details

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Chekitaut: 8:30pm On May 27, 2016
Still available
Chekitaut:
OFFER while STOCK last
Buy GRANITE from us, get Cement @ N1,450-N1,500/bag

Call: 08055545355
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:17pm On May 28, 2016
Moulding of interlocking

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:48am On May 30, 2016
Happy Holiday!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 11:50am On May 31, 2016
segcymoor:
Moulding of interlocking

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:29pm On Jun 01, 2016
Construction of inspection chambers

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:30pm On Jun 01, 2016
segcymoor:
Construction of inspection chambers

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:17pm On Jun 01, 2016
In terms of quality delivery......





--------------------------------------------------
We surpassed everyone of them shocked

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Onuokwu: 7:27pm On Jun 01, 2016
Its been a beautiful 3.5 years journey.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:25am On Jun 02, 2016
Onuokwu:
Its been a beautiful 3.5 years journey.




---------;----
and we won't let you down!

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Nobody: 9:58am On Jun 02, 2016
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by jodeci01: 12:45pm On Jun 02, 2016
segcymoor:


1-First 6 terrace building was completed at the figures of 120m

2-The 8 units blocks of flat gulp 120m

3.........and this particular 9 terrace house is expected to be completed at 150m in less than 4 months away!


For more enquiry-mooredesignbuild@gmail.com
08091110234


MOORE-DESIGNBUILD LTD

--We actually do structures right!

Apologies for digressing, but is cost of land inclusive in 9 terrace house? Thanks!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:21pm On Jun 02, 2016
jodeci01:


Apologies for digressing, but is cost of land inclusive in 9 terrace house? Thanks!
Bros no be so o.Land alone na 140m

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:05pm On Jun 02, 2016
Tritri:
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?

Ok
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:05pm On Jun 02, 2016
Tritri:
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?

Ok......
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:05pm On Jun 02, 2016
Tritri:
@segcymoor Can you please Call Baba at egbeda, He want to talk with U.?

Ok..............
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:48am On Jun 03, 2016
Finishing Target....

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:58pm On Jun 03, 2016
Getting. Closer.....

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:36am On Jun 06, 2016
Completed stanchion!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:45pm On Jun 06, 2016
Kitchen. Cabinet

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:27am On Jun 08, 2016
View

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:12am On Jun 10, 2016
Construction of inspection Chamber

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:15pm On Jun 12, 2016
Water supply pipe

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:17pm On Jun 12, 2016
segcymoor:
Water supply pipe

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by cleric(m): 7:03pm On Jun 12, 2016
segcymoor:
Tiling on step

____
steeping up in style

Your tiler is very good.

(1) (2) (3) ... (54) (55) (56) (57) (58) (59) (60) ... (102) (Reply)

How Large Is 'A Plot' Of Land? / Prices For These Paints / Best Architectural, Interior And Construction Works

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 16
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.