Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 8:02am On Oct 03, 2015 |
coming soon .november 1.; dry land, anteroom, parlor, visitors room, six rooms, living room, library, kitchen, store, its going to be a double faced duplex. on a 66 by54 feet is the area it will cover 1 Like 2 Shares |
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 10:20am On Jan 20, 2016 |
the project is for a brother. Am only supervicing ooh. The project is in anambra state, Actually, we started in august 2015 with block moulding. We saw hell. Will never advice anyone to mould during this period . We lost over 40bags of cement due to rain. Total of 100bags was bought at 1780, 10 trips of sand at 11500 per trip, a bag was 700 to mould at 35 pcs per bag. 3 Likes 1 Share |
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 10:55am On Jan 20, 2016 |
the target was to get over 3500 blocks that would cover upto the decking level. The project took off easily cos it was in an already habitant compund, . Although little site clearing was carried out. 2 palm trees nd kolanut tree was brought down at 3k each and chain sawed at 4k |
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 1:17pm On Mar 03, 2016 |
4bundle of pegging wood 600each 27 pics of 2by2 by12 250each 4rolls of colered ropes for fundation400 A square1000 And 6ft plum 2500 3shovel900 each 3headpan 600 each 55pic 16mm rod at1920ngn 20pic 12mm rod at 1100ngn 28pic of8mm rod at 900ngn 2bundles of binding wire 5000each 3"nail a bag 5000 2"nail a bag5000 100bags of cement 1450 each 4trips of sand at 11000 each 3trips of stone at 30000 each 1 Like 1 Share |
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 11:38am On May 08, 2016 |
pegging and digging of foundation. 1,200 per portion. 3ft dept it was a three days job. 300 per column for 34 column. blinding mixture 23;24;3. same as 8headpan of sand and stone to one bag of cement.90bags was spent here. 9iches thickness was used to take d level. 1 Like 1 Share |
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 7:42pm On May 13, 2016 |
pictures
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 7:51pm On May 13, 2016 |
more
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 8:24pm On May 13, 2016 |
m
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 8:32pm On May 13, 2016 |
more
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 9:13am On May 15, 2016 |
m
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 9:37am On May 15, 2016 |
filling of foundation was done with sand from 2 soakaway and an underground tank. labour for sand filling 60000. cost of digging the 2 pit 40000 cost of digging the tank 75000 6tanker of water for watering the foundation 45000 labour for lamering as it was called 15000
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 10:15am On May 15, 2016 |
labour carpenter 25000 labour iron bender 2800 1850 blocks was used for the foundation . 3trips of stone 90000 4trips of sand 44000 2tanker of water15000 supervision 120000 700 a bag for the casting 130bags of cement at 1400 labour for blinding 67000( 80bags) labour block setting (35/block + 8severs ) 85000 labour for chaining/casting( 30bags*700) 26000 |
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 10:30am On May 15, 2016 |
pix 1 Like
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 7:08am On Jul 08, 2016 |
German floor
|
Re: Construction Dairy Of A Seven Rooms Duplex . by ucheends(m): 2:56am On Jul 12, 2016 |
block work 1 Like
|
Re: Construction Dairy Of A Seven Rooms Duplex . by Nobody: 5:29am On Jul 12, 2016 |
Re: Construction Dairy Of A Seven Rooms Duplex . by veekid(m): 5:53am On Jul 12, 2016 |
Following |
Re: Construction Dairy Of A Seven Rooms Duplex . by xreal: 5:58am On Jul 12, 2016 |
ucheends: Nigerians should begin to learn. This type of 'large' building is only good/fun when the owner is young and the children are teenagers. After few years, maintenance will be hell. No child will surely be with them in few years. Climbing staircase becomes headache. Solution. There should be a plan to build a two bedroom bungalow to retire to. 5 Likes |
Re: Construction Dairy Of A Seven Rooms Duplex . by Larryfest(m): 6:00am On Jul 12, 2016 |
Why is it this slow |
Re: Construction Dairy Of A Seven Rooms Duplex . by dukeprince50: 6:00am On Jul 12, 2016 |
nice, u will definitely build yours, 2 Likes |
Re: Construction Dairy Of A Seven Rooms Duplex . by obaival(m): 6:13am On Jul 12, 2016 |
My next plan & target |
Re: Construction Dairy Of A Seven Rooms Duplex . by austin2all: 6:19am On Jul 12, 2016 |
SIR YOU DID'NT SHOW US YOUR PLAN WORK |
Re: Construction Dairy Of A Seven Rooms Duplex . by DVMtuppence(m): 6:24am On Jul 12, 2016 |
Congrat |
Re: Construction Dairy Of A Seven Rooms Duplex . by Israel5(m): 6:50am On Jul 12, 2016 |
Mine is undrway |
Re: Construction Dairy Of A Seven Rooms Duplex . by STARGREEN(m): 6:51am On Jul 12, 2016 |
Congrats. please help us with picture of the building plan. Once more thank you and congrats as urs will sooner be |
Re: Construction Dairy Of A Seven Rooms Duplex . by anyicash(m): 7:04am On Jul 12, 2016 |
I love this post, it is among the top 5 post i ve come across on nairaland.God bless you bro. plz more updates and plz i will like to know the total costs so far..thanks. |
Re: Construction Dairy Of A Seven Rooms Duplex . by wesley2288(m): 7:08am On Jul 12, 2016 |
op..I hail oo |
Re: Construction Dairy Of A Seven Rooms Duplex . by segneyukk(m): 7:15am On Jul 12, 2016 |
Nice one.. Keep on d gud work... Bt that circular hole though.. Whats dat for pls |
Re: Construction Dairy Of A Seven Rooms Duplex . by haconjy(m): 7:18am On Jul 12, 2016 |
continue I can build my house like this |
Re: Construction Dairy Of A Seven Rooms Duplex . by Emeka71(m): 7:19am On Jul 12, 2016 |
I want to buy land at Sango-Otta or Ifon for less than a N100,000.00 and then buy a tent to place on the land for my residential. |
Re: Construction Dairy Of A Seven Rooms Duplex . by ikorodureporta: 7:22am On Jul 12, 2016 |
Is it a milk factory 3 Likes |
Fire Outbreak At Mile 2 Estate (PHOTO) / NextHome Project Gallery / Floods Submerge 20 Houses, Render 1,000 Homeless In Akwa Ibom
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19 |