Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,211,989 members, 8,013,179 topics. Date: Monday, 25 November 2024 at 11:52 PM

From Foundation To Completion, Pictures Of What We Built For A UK Based Client - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / From Foundation To Completion, Pictures Of What We Built For A UK Based Client (11341 Views)

Build A 4 Bedroom Bungalow From Foundation To Roofing With 4.5 Million Naira / Old Building Renovation From Design To Completion, call 08141869662 / From Foundation 2 Pre Roofing Parapet Cast See What We Built 4a PH Based Client (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 6:51pm On Oct 24, 2016
Description:

A Completed 3 bedroom bungalow development

Project Duration from foundation to completion :

3 months (mid September - 20th December)

Location:

Ikorodu


Project Cost:

N3.5m (foundation to roofing)

N6,367,644 (roofing to completion)

Total Project Cost:

N9,867,644.00 (excluding cost of Land)

Clients Contact for verification of claims:

+447958049589. J.R. Ayeni


Vicoloni & Percee Ltd.
08065344562

vicolonipercee@gmail.com

4 Likes 3 Shares

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 6:58pm On Oct 24, 2016
Stage 2:

Blocksetting

1 Share

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 7:15pm On Oct 24, 2016
Stage 3:

Roofing (we used okinlolo wood and 0.45 aluminium long span)

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 7:47pm On Oct 24, 2016
Roofing cont'd

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 8:19pm On Oct 24, 2016
Cost Implication (foundation to roofing);

N3.5m (Approx.)

We have numerous satisfied clients in the diaspora.
Many Nigerians abroad wishes to invest heavily in the Nigerian property market but are discouraged by a plethora of woeful tales from victims of fraud.
I made an oath with God to be different by ensuring speedy and satisfactory project execution.
Need we say more? My reputation goes before me by the grace of God.

My name is Dcn. Victor Oniyire
08065344562
vicolonipercee@gmail.com

4 Likes

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 10:49am On Oct 25, 2016
Trustworthy people may not become rich but they never go broke

2 Likes

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 10:56am On Oct 25, 2016
2 partly fenced plots of 60x120m each is up for sale behind this project and both facing the road.

2.5m net for each plot.

From direct owner.

08065344562
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 8:16pm On Oct 25, 2016
2 acres of land available for farming at Igbalu Ikorodu off gberigbe.

350k per plot

Discount of 10k per plot if you are buying all.

From direct owner no third party.
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by lancee(m): 11:45pm On Oct 25, 2016
[quote author=vicoloni post=50478787]Cost Implication (foundation to roofing);

N3.5m (Approx.)

We have numerous satisfied clients in the diaspora.
Many Nigerians abroad wishes to invest heavily in the Nigerian property market but are discouraged by a plethora of woeful tales from victims of fraud.
I made an oath with God to be different by ensuring speedy and satisfactory project execution.
Need we say more? My reputation goes before me by the grace of God.

My name is Dcn. Victor Oniyire
08065344562
vicolonipercee@gmail.com
[/quot


Can u send more pictures to larrysole77@gmail.com or post more pixs here

Thanks
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by Babs612000(m): 1:20am On Oct 26, 2016
vicoloni:
Description:

A ongoing 3 bedroom bungalow development

Project Duration from foundation to roofing:

1 month

Location:

Ikorodu


Project Cost:

N3.5m


Vicoloni & Percee Ltd.
08065344562
Good job kindly give us the broke down of all the materials used e.g Nunmber of blocks,cement,labour cost e.t.c from foundation to roofing level with cost please.
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 7:37am On Oct 26, 2016
Babs612000:
Good job kindly give us the broke down of all the materials used e.g Nunmber of blocks,cement,labour cost e.t.c from foundation to roofing level with cost please.

Thanks so much for the compliment. Before close of today I shall oblige your request.

Thanks to the moderator for putting my post on frontage. You are blessed.

1 Like

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 4:08pm On Oct 26, 2016
Materials and Cost Analysis for foundation.

Pls note that prices of materials are not static nowadays.

2 Likes

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 4:26pm On Oct 26, 2016
Materials and Cost Analysis from foundation to window level

2 Likes

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 4:41pm On Oct 26, 2016
Window level to lintel

1 Like

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 5:10pm On Oct 26, 2016
Roofing

1 Like

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by Babs612000(m): 6:14pm On Oct 26, 2016
vicoloni:
Roofing
. Wow!!! This is great well done for a good job.
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by shakyriri: 6:16pm On Oct 26, 2016
Vicoloni.your type is rare.i went through the excel sheets and am shocked.shocked at your transparency and 100% honesty.words fail me.
May the good lord bless u.guide and guard your path.ease your affairs.grant you your innermost desires.
I don't knw if you are a certified qs or builder or engineer but I will gladly employ u for ur build in the future.i will also pay 8%. U deserve it.pls keep it up.you will go far in sha Allah.

5 Likes

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by AkProsper(m): 7:05pm On Oct 26, 2016
vicoloni:
2 partly fenced plots of 60x120m each is up for sale behind this project and both facing the road.

2.5m net for each plot.

From direct owner.

08065344562
Nice work there.
Especially those cost and expenses pictures.
Am a tiler in case you need one, feel free to contact me. I'll be glad to work with you.
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by twinskenny(m): 7:15pm On Oct 26, 2016
vicoloni:
Trustworthy people may not become rich but they never go broke

you are so straight forward.. nice one God will expand your coast..

you might want to consider us for the electrical thanks 08051355133
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 7:03am On Oct 27, 2016
Babs612000:
. Wow!!! This is great well done for a good job.

@Babs612000 thanks for the compliment.

1 Like

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 7:05am On Oct 27, 2016
shakyriri:
Vicoloni.your type is rare.i went through the excel sheets and am shocked.shocked at your transparency and 100% honesty.words fail me.
May the good lord bless u.guide and guard your path.ease your affairs.grant you your innermost desires.
I don't knw if you are a certified qs or builder or engineer but I will gladly employ u for ur build in the future.i will also pay 8%. U deserve it.pls keep it up.you will go far in sha Allah.

@Shakyriri thanks so much Sir firstly for the prayers (Amen) and the generous compliments. It makes me want to do better. Ese pupo o

2 Likes

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 7:07am On Oct 27, 2016
AkProsper:

Nice work there.
Especially those cost and expenses pictures.
Am a tiler in case you need one, feel free to contact me. I'll be glad to work with you.

@AkProsper many thanks sir I appreciate you
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 7:09am On Oct 27, 2016
twinskenny:


you are so straight forward.. nice one God will expand your coast..

you might want to consider us for the electrical thanks 08051355133

@twinskenny ejire ara isokun many thanks for the prayer and kind compliments.
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by shakyriri: 8:46am On Oct 27, 2016
vicoloni:


@Shakyriri thanks so much Sir firstly for the prayers (Amen) and the generous compliments. It makes me want to do better. Ese pupo o
Send me your email pls.wanna send u a mail
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by lummyD: 8:52am On Oct 27, 2016
please can i av your mail address?

A ongoing 3 bedroom bungalow development

Project Duration from foundation to roofing:

1 month

Location:

Ikorodu


Project Cost:

N3.5m


Vicoloni & Percee Ltd.
08065344562[/quote]
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 9:21am On Oct 27, 2016
lummyD:
please can i av your mail address?

A ongoing 3 bedroom bungalow development

Project Duration from foundation to roofing:

1 month

Location:

Ikorodu


Project Cost:

N3.5m


Vicoloni & Percee Ltd.
08065344562

My email address is vicolonipercee@gmail.com

Thanks and good morning
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by JossyYetty: 9:32am On Oct 27, 2016
I am the client in this post.
I was introduced to Deacon Oniyire (Vicoloni & Percee Ltd) by a professional colleague I worked with in Nigeria about 15 years ago.
We paid for the land in July 2016.
I visited Nigeria late August 2016 and met Deacon Oniyire for less than 30 minutes.
We started foundation work mid-September 2016.
The roofing was done 20th October 2016.
This is the Lord's doing and it is marvellous in my eyes.
I am happy to provide reference for Vicoloni & Percee Ltd if required.

Joseph & wife - UK.

10 Likes 2 Shares

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 10:26am On Oct 27, 2016
JossyYetty:
I am the client in this post.
I was introduced to Deacon Oniyire (Vicoloni & Percee Ltd) by a professional colleague I worked with in Nigeria about 15 years ago.
We paid for the land in July 2016.
I visited Nigeria late August 2016 and met Deacon Oniyire for less than 30 minutes.
We started foundation work mid-September 2016.
The roofing was done 20th October 2016.
This is the Lord's doing and it is marvellous in my eyes.
I am happy to provide reference for Vicoloni & Percee Ltd if required.

Joseph & wife - UK.

God bless you sir for this most humbling comment and recommendation. It is a more gratifying than money!

1 Like

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by twinskenny(m): 6:37pm On Oct 27, 2016
vicoloni:


@twinskenny ejire ara isokun many thanks for the prayer and kind compliments.
you are welcome Sir
Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by Babs612000(m): 8:30pm On Oct 27, 2016
vicoloni:


My email address is vicolonipercee@gmail.com

Thanks and good morning
. Please l have some questions for you.
1. How many feet did you dig for the foundation.
2. How many blocks did you lay in ground to level the floor l can see two set of blocks above the ground which is ok.
3. What is the length of the reinforcement bar from the ground to where we see it please.

1 Like

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by vicoloni(m): 9:32pm On Oct 27, 2016
Babs612000:
. Please l have some questions for you.
1. How many feet did you dig for the foundation.
2. How many blocks did you lay in ground to level the floor l can see two set of blocks above the ground which is ok.
3. What is the length of the reinforcement bar from the ground to where we see it please.

1) 4ft was dug for the foundation
2) 3 blocks was laid in the ground
3) the reinforcement bar is approx 6ft from bottom to the visible top

Thanks

1 Like

Re: From Foundation To Completion, Pictures Of What We Built For A UK Based Client by Babs612000(m): 9:40pm On Oct 27, 2016
vicoloni:


1) 4ft was dug for the foundation
2) 3 blocks was laid in the ground
3) the reinforcement bar is approx 6ft from bottom to the visible top

Thanks
Wow!!! Lovely many thanks keep the good work going God bless.

(1) (2) (3) (Reply)

Surulere (ojuelegba Axis) 1storey building for sale / Choosing Aluminum Windows / How To Obtain Certificate Of Occupancy In Oyo State

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 35
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.