Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,740 members, 8,000,112 topics. Date: Monday, 11 November 2024 at 10:01 PM |
Nairaland Forum / Nairaland / General / Politics / Gbarainubie Power Plant Ready End Of Q1 2017 (10493 Views)
Osinbajo Visits Oba Of Benin, Inspects Azura Power Plant(photos) / Buhari Award $5.8 Billion Mambila Dam Power Plant Contract To Chinese State Firm / Century Power Begins 2000mw Power Plant Construction In Anambra (2) (3) (4)
Gbarainubie Power Plant Ready End Of Q1 2017 by osahonmk(m): 7:14am On Feb 08, 2017 |
The 252 megawatt-capacity GbarainUbie power plant being built by the Niger Delta Power Holding Company (NDPHC) under the National Integrated Power Project (NIPP) would be ready for commissioning by the end of first quarter 2017, the Managing Director of NDPHC, Mr. Chiedu Ugbo has said. Ugbo said recently during the inauguration of the presidential initiative on solar homes systems in Wuna Village Gwagwalad Abuja, that the completion and commissioning of the plant would add additional 252MW to Nigeria’s generation capacity. Work on the plant which has Rockson Engineering as its engineering, procurement and construction (EPC) contractor has stalled for a long time now. But speaking to the Vice President, YemiOsinbajo at the event, Ugbo said: “Your Excellency, strategies are also in place to complete the second unit of the Gbarain power station in Bayelsa State before the end of this quarter. This will add 225MW to the grid.” “In November last year, the Honorable Minister of Power, Works and Housing, commissioned the 12-circuit Ikot-Ekpene 330KVA Switching Station and the associated transmissions lines with a total of about 285KM completed by our new management. These projects are now assisting in evacuating into the national grid, electricity hitherto stranded in the Eastern Delta,” he added. Also, arrangements for gas supply to the plant may have been taken care of with a pledge by Shell Petroleum Development Company (SPDC) that it would solely supply gas to the 252MW gas turbine power station. In a 2015 paper titled: ‘Shell in Nigeria: Unlocking Nigeria Energy Potential,’ SPDC stated that it would single-handedly supply gas to the 225MW Gbarain power plant. It said in the paper: “Shell will be the sole supplier of a new 225 megawatts power plant being built in Gbarain by the Federal Government under the Nigerian Independent Power Project. “In 2010, SPDC began producing from the Gbarain-Ubie integrated oil and gas plant in Bayelsa State. Gbarain is designed to process one billion standard cubic feet of gas per day. In addition to supplying gas to the Nigerian Liquefied Gas (NLNG), Shell also supplies gas to the Bayelsa State power plant at Imiring.” The paper further indicated that the GbarainUbie plant was helping SPDC reduce flaring of associated gas from nearby gas fields, thus contributing to its wider flares reduction programme. “The GbairanUbie project has created a legacy of skills and capacity in complex gas projects, which will be vital in meeting Nigeria’s electricity supply challenges in the years ahead,” it added in the paper. http://www.energywatchng.com/gbarainubie-power-plant-ready-end-q1-2017/ 2 Likes
|
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by optional1(f): 7:17am On Feb 08, 2017 |
good 3 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by namqul(m): 7:21am On Feb 08, 2017 |
hmmmmmmm |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by CLASSMAN: 7:22am On Feb 08, 2017 |
Ok |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by information1: 7:25am On Feb 08, 2017 |
Hahahahah.. why are this(fill the space) nah.. 2 week or 4week ago you said a power plant is also ready, we still experience blackouts.. I hope this wont be future impossible tense sha?? http://talkgeria.com/topic/cia-declares-6-major-causes-of-nigerias-problems/ |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Nobody: 7:26am On Feb 08, 2017 |
Click 'like' if you think this would really change the state of power in this country and 'share' if you think it will. 3 Likes 1 Share |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by bettercreature(m): 7:26am On Feb 08, 2017 |
Useless token token meggawatts 2 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by fulaniHERDSman(m): 7:27am On Feb 08, 2017 |
As usual ... future impossible tense they will surely deny 2moro! 3 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by hermeen(f): 7:27am On Feb 08, 2017 |
Will be waiting to see |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by niyifour(m): 7:27am On Feb 08, 2017 |
I rep Bukola saraki |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by olaolulazio(m): 7:27am On Feb 08, 2017 |
FG working on the Influential Baboon's region. . This is government This is continuity. I typed those words from my sleep, no quote is expected. 1 Like |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by VIPERVENOM(m): 7:28am On Feb 08, 2017 |
I wonder why its hard for this country to build a power plant that can generate at least 1000MW instead of littering all these small tins everywhere. 1000MW power plant in each region could solve our power problems 9 Likes 1 Share |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Nobody: 7:28am On Feb 08, 2017 |
Hit the 'like' button if you think this is a lie 1 Like |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by NaijaFutbol: 7:28am On Feb 08, 2017 |
#IStoodWithGEJ 4 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by SexyNairalander: 7:28am On Feb 08, 2017 |
booked |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by SmartMugu: 7:29am On Feb 08, 2017 |
Hope masses don't chase una comot before Q1 2017. Na only naija where one lawyer claim say him sabi give electricity. Engineers and technocrats aren't qualified enough, one of the chosen ministers is in charge of what's not his area. 2 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by maxiflexy(m): 7:29am On Feb 08, 2017 |
nonsense. state should be allowed to fund their power grid 2 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Ahmed0336(m): 7:29am On Feb 08, 2017 |
Freiden:Maka why? 1 Like |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Antoeni(m): 7:30am On Feb 08, 2017 |
That is if militants will nt destroy it with RpG. Nice one sha 1 Like 1 Share |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by steveturner24(m): 7:30am On Feb 08, 2017 |
nice |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by shamecurls(m): 7:31am On Feb 08, 2017 |
Just a matter of time, I strongly believe Nigeria is almost there as we presently right on course! God bless His Excellence, President Mohammadu Buhari and his cabinet! 12 Likes 2 Shares |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by mykelmeezy: 7:31am On Feb 08, 2017 |
future probability tense 1 Like |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by feldido(m): 7:31am On Feb 08, 2017 |
More power to Bayelsa...imagine Bayelsa state cannot enjoy power for up to 10hours a day...what's the need to be an oil producing state? 2 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by jidxin(m): 7:31am On Feb 08, 2017 |
who cursed nigeria? 1 Like |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by olaolulazio(m): 7:31am On Feb 08, 2017 |
NaijaFutbol: You stood with nothing. 3 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Nobody: 7:31am On Feb 08, 2017 |
VIPERVENOM: am telling you. s ingle dam in china or so generates 20,000mw 2 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by nmreports: 7:32am On Feb 08, 2017 |
This is a potential recruiter. Watch out. |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Heemzy: 7:33am On Feb 08, 2017 |
We dey wait.. make e shaa better... |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Nobody: 7:33am On Feb 08, 2017 |
Change noni |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Lastborn12(m): 7:33am On Feb 08, 2017 |
Another propaganda from our promise and fail Government.. Watch as they will deny it when the date clock.. Btw why are you people always FCT before me?? God go judge unaaaaaaaa oooooo 1 Like |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Tokziby: 7:34am On Feb 08, 2017 |
I am still bemused that in 2017 we don't have a regular power supply despite the advancement in technology and the abundance of resources at our disposal. Its a shame that at a time when countries with uninterrupted power supply are making new ways to utilize nuclear energy, deep sea windmill and underwater current to enhance their productivity, Nigeria is still struggling with hydro-power generation . The sun in the north is enough to cater for the whole Nigeria if we invest in solar energy. The Hilly topography is the middle-belt with fast and unending wind will make a good source for a windmill farm. China as we speak still make use of coal energy to generate power and there is abundance of coal in Enugu that can do that. While the mass of water from the south-west to south-south will be more than enough to feed the nation. But all na lie, the poo people selling fuel and generators will never allow that. The poo politicians that only think about their pockets will never raise a bill talkless of supporting it. The poo government with no sense will travel and sign yeye contract instead of asking their counterpart to help them with best hands and privatize the poo out of this poo generating companies. They never seem to learn whenever they travel from countries like UAE, Saudi, Qatar etc that has no expert in any field but spent billions to bring them in and create a fantastic environment that even the western world marvel at. Pooo govt, pooo politician what a "C*ntry" called Nigeria 4 Likes |
Re: Gbarainubie Power Plant Ready End Of Q1 2017 by Ihateiboflaties: 7:35am On Feb 08, 2017 |
Scam and Nigerian leaders will be buried together.Every Nigerian has the right to be pisanthrophobic.Every Nigerian leader both past and present are robbers. If you believe this is a step forward, you'd believe your mum is a virgin.This is just a campaign report.Why am I a Nigerian sef... No light since last year! 1 Like |
Pantami's FUTO Professorial Fraud And Odious Comparisons By Farooq Kperogi / Aregbesola-Oyetola Camps Say No To Reconciliation Yet / Gunmen Raid Kwara Community, Abduct Residents
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 24 |