A Diary Of My 2nd Building Project - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / A Diary Of My 2nd Building Project (13543 Views)

How To Calculate Number Of Blocks For Your Building Project In 2 Simple Steps. / Who Should Supervise A Building Project; Architects, Builders Or Engineers / A Nairalander's Building Project -from Foundation To Plastering (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: A Diary Of My 2nd Building Project by RobbStark(m): 7:28am On Apr 16, 2017
jus want to find out the location cos it seems.to me that the price of the 20 ton sand is on the high side
Re: A Diary Of My 2nd Building Project by blessme2019(m): 7:31am On Apr 16, 2017
Following
Re: A Diary Of My 2nd Building Project by shedy03(m): 7:34am On Apr 16, 2017
edshaf:
Block molding completed (for now) with a total of 4000 6" blocks and 6600 9" done.

Currently preparing the bungalow for demolition by removing the roof and roof structure.

With CofO process on the way for the land, I was advised not to start any form of construction work pending government site visitation. Infact I now intend on waiting to get all necessary approvals before commencing work. The wait should grant me the opportunity to raise money for quick progression.
good job, its nice.
how about services drawings (electrical&plumbing designs), have you gotten it done? if no, contact me for that. quote me back.
Re: A Diary Of My 2nd Building Project by Azcreativ(m): 7:35am On Apr 16, 2017
Nice one!
Re: A Diary Of My 2nd Building Project by opobo007: 7:50am On Apr 16, 2017
Nice one bro, keep it up. I love your stage by stage update.
Re: A Diary Of My 2nd Building Project by danemenike: 8:03am On Apr 16, 2017
Nice work
Re: A Diary Of My 2nd Building Project by Connoisseur(m): 8:07am On Apr 16, 2017
edshaf:
Block molding completed (for now) with a total of 4000 6" blocks and 6600 9" done.

Currently preparing the bungalow for demolition by removing the roof and roof structure.

With CofO process on the way for the land, I was advised not to start any form of construction work pending government site visitation. Infact I now intend on waiting to get all necessary approvals before commencing work. The wait should grant me the opportunity to raise money for quick progression.

Edakun baba could you please explain the bold text. I am not understanding
Re: A Diary Of My 2nd Building Project by Nobody: 8:34am On Apr 16, 2017
edshaf:
As I get closer to the commencement of the project, I felt the need to start coming up with ideas of my own.

I want to have a general idea of what I want in drawing before my meeting with my architect. That way, there would be no challenge in expression.

Below is a sketch of what I want, with the rough plan of the ground floor.

nice design sir! am freelance Architect, my services might be of help to you anytime pls, just contact me via my signature
Re: A Diary Of My 2nd Building Project by fendorf(m): 8:54am On Apr 16, 2017
Contact us for ur granite and sharpsand
Re: A Diary Of My 2nd Building Project by nateevs(m): 8:59am On Apr 16, 2017
Edshaf,

Did you eventually wait until you obtained all approvals before commencing works?
Re: A Diary Of My 2nd Building Project by idiagbo86(m): 9:01am On Apr 16, 2017
I just think the passage will be dark.try create light by providing a window inside to transfer light from outside .great job though.
Re: A Diary Of My 2nd Building Project by idiagbo86(m): 9:21am On Apr 16, 2017
Pls op find a way and create light in the passage.nice job anyway.
Re: A Diary Of My 2nd Building Project by westfield: 9:31am On Apr 16, 2017
Please sir i work with a furniture company and i can assure you we can give you high quality products. We do kitchen cabinets and wardrobes. You can send me your email and i can forward you our portfolio. Thank you. Contact number and email 08133572363, ngbulie60@rocketmail.com. Nnamdi
Re: A Diary Of My 2nd Building Project by timmykaydude: 9:47am On Apr 16, 2017
edshaf:

Yes 42.5
call us for quality blocks@blossom blocks.
Re: A Diary Of My 2nd Building Project by segzicres(m): 10:02am On Apr 16, 2017
small suggestion. its possible to have all room ensure with that for area. kitchen can be bigger. lobby space is too much. can't be included in other rooms to increase their floor space. otan.

1 Like

Re: A Diary Of My 2nd Building Project by ArcFresky(m): 10:06am On Apr 16, 2017
Why are your rooms no longer ensuite....?
I think you should make them ensuite...apart from the increase in rentage value, it would be more appealing in the years to come.
Re: A Diary Of My 2nd Building Project by ArcFresky(m): 10:09am On Apr 16, 2017
I can see your spaces are well managed? But I think its too managed, for example, a single window in the lounge is inviting uncomfortable conditions.
Re: A Diary Of My 2nd Building Project by edshaf: 10:19am On Apr 16, 2017
Connoisseur:


Edakun baba could you please explain the bold text. I am not understanding

Yes. The normal trend in Lagos is to commence building before paper work (if at all). With Lagos drive for revenue generation, several penalties are now levied if you build without building approval (and get caught).
Sadly, you cannot get building approval without a title on the land.
Since the location is under government acquisition with consent to regularize, the Regularization process takes about 6 months to complete. But one can still get building plan approved with the letter of regularization, which takes about 3 month or less to be ready.
Re: A Diary Of My 2nd Building Project by meezynetwork(m): 10:43am On Apr 16, 2017
edshaf:
Demolition in progress...
Was the building used for making of sachet water? It looks so familiar
Re: A Diary Of My 2nd Building Project by Skoopy(m): 10:43am On Apr 16, 2017
Great project sir, I'm a young man, January this year, i acquired a piece of land in port Harcourt and my idea is to develop a storey building with single unit 2 bedroom flat on the ground floor and a single unit 3 bedroom flat on the top floor. I am very scared to start it now because of the rough estimate I am getting from sources.

This is a moral booster to me sir. God grace upon you.

1 Like

Re: A Diary Of My 2nd Building Project by edshaf: 10:48am On Apr 16, 2017
meezynetwork:

Was the building used for making of sachet water? It looks so familiar
Not that I know of. Unless the person was using well water kiss
Re: A Diary Of My 2nd Building Project by edshaf: 10:56am On Apr 16, 2017
ArcFresky:
Why are your rooms no longer ensuite....?
I think you should make them ensuite...apart from the increase in rentage value, it would be more appealing in the years to come.

We had the challenge of space. The plot is slightly skewed resulting in smaller buildable area.

My archi suggested all ensuite in flats on the upper floors but after careful deliberations putting all factors into play, we decided to go with the plan as is.
Re: A Diary Of My 2nd Building Project by sonety2k(m): 11:03am On Apr 16, 2017
Nice One
Re: A Diary Of My 2nd Building Project by Nobody: 11:10am On Apr 16, 2017
Dear Edshaf you didn't give us the total estimated cost of the first building apart from the land,foundation and decking .Biko don't do that for the second building. Thanks

1 Like

Re: A Diary Of My 2nd Building Project by Emeraldz(f): 11:31am On Apr 16, 2017
Nice one. I pray for divine provision for you all the way
Re: A Diary Of My 2nd Building Project by money121(m): 11:32am On Apr 16, 2017
Ok
Re: A Diary Of My 2nd Building Project by money121(m): 11:33am On Apr 16, 2017
Contractor: *Ayyub*

Client: Nairalander

Material: *Aluminum (0.45mm thick)*

Style: *Metcoppo*

Colour:North brown

*Roof:* 394.3sqm @ N1900/sqm = *N749,170*

*Flashing:* 58m @ N1700 = *N98,600*

*Cladding:* 68.5m N1700 = *N116,450*

*Accessories:* = *N30,000*


Bending =#4,500
Transportation =#27,000
Workmanship =#70,000

*Total* = *N1,095,720*

Location: Idi-Iroko, Soka Area Ibadan Oyo State

For your next Roofing Project call/WhatsApp
080-85-310-359

1 Like

Re: A Diary Of My 2nd Building Project by Alasi20(m): 11:39am On Apr 16, 2017
Owkay
Re: A Diary Of My 2nd Building Project by edshaf: 12:06pm On Apr 16, 2017
RobbStark:
jus want to find out the location cos it seems.to me that the price of the 20 ton sand is on the high side

That's what I got it for, full volume.

From Ikorodu to Boknor (near Okota). I am open to better or equal product & service at a reduced rate if available. What rate is a good rate sir?
Re: A Diary Of My 2nd Building Project by kenraj(m): 12:37pm On Apr 16, 2017
Please mention me when you continue. I'm inspired.

Thanks sir.
Re: A Diary Of My 2nd Building Project by RobbStark(m): 2:50pm On Apr 16, 2017
edshaf:


That's what I got it for, full volume.

From Ikorodu to Boknor (near Okota). I am open to better or equal product & service at a reduced rate if available. What rate is a good rate sir?

Cant tell cos I dont stay in Lagos.
But here in Ph, we get as low as 24k to 40k depending on the location of drop.

(1) (2) (3) (Reply)

Two-storey Building Collapses In Ogidi, Anambra, 7 Feared Dead / Delta Building Collapse: Four Feared Dead, Others Trapped / Granite,Sharp sand,plastering sand Supply To Anywhere On The Island In Lagos

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 32
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.