Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 11:35pm On Sep 12, 2017 |
What is the cost of drawing a 4 bedroom plan. Thanks |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 4:25am On Sep 13, 2017 |
Please was the estimate of getting this attached file from the foundation to roof stage. Block work and labour all included. Please your contributions are highly appreciated. Thank you! |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Fadelex(m): 4:13pm On Sep 14, 2017 |
couragemath:your drawing has no dimension, and are you sure your plot will take this building? if yes, pm me for more discussion |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by kenazuu(m): 5:09pm On Sep 14, 2017 |
Like others have said, it depend on your design, taste and finishing. I am presently working on one, my brother is by his Grace considering the cost of things now. Things I can remember cos at a point I lost count on keeping record. 4 bedroom bungalow with two sitting rooms, all room ensuit and big kitchen. Total sqm is 200. Roofing using longspan .45mm , wood and labour including transport=980k POP= 3500*200= 700k Window casement and burglaries= 630k Conduct and Wiring plus labour= 600k but wire was stolen so I will have to do the wiring again Tiles plus labour= 1m 4500 blocks @ 170 = 765k Laying of block= 247k Plastering in and out= 320k Casting of parapet ( cement,granite, iron rod, wood and labours) =580k Garman floor= cannot remember how much Total numbers of cement used for foundation, laying of blocks, plastering, cement for tiles. Not included cos I cannot remember again. Toilet seats= 5 @ 65k= 325k Doors for toilets with store = 6 @ 23k=138k Internal room doors with kitchen = 6@30=180k Wall screeding 300 Sam @ 300= 90k excluding materials Exit doors 2 (3ft) @ 85k each and 4ft @120k =290k excluding installation Also mechanical (plumbing work) forgotten amount spent Soak away, facing security house. Cannot remember amount spent. I and am still trying to finish. 5 Likes |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 2:32am On Sep 15, 2017 |
Thank u @kenazuu for your time. You mentioned you used 4500 blocks. Was that from foundation to roof. Thank you and I'm so happy for you |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by lancee(m): 1:37am On Sep 16, 2017 |
adebaxton: Oga adebaxton pls send me estimate /floor plan @ larrysole77@gmail.com...Thanks |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 7:46pm On Sep 16, 2017 |
Is it reasonable to dig a foundation with 45000 thousand naira. the guy drawing my plan say that will be the amount for a 4bedroom bungalow . And also he says it cost 55naira to set one block. is it cheaper to buy blocks than moulding. Please everyone I need your contribution. Thank you for your time. |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Chukazu: 7:54pm On Sep 16, 2017 |
Politicowizard: very logical and incisive . the amount should be enough up to" carcass level" then the finishing level depends on ones taste |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Chukazu: 8:04pm On Sep 16, 2017 |
couragemath: very wrong advice. it is far cheaper to mold your own block. one bag of cement gives about 30pcs block ,I can't recollect the exact amount I spent on the labour for brick layer .but over all it was far cheaper molding my own block. you can check post on my building experience on this forum and the project was exactly as yours... 4bed room bungalow |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 11:08am On Sep 18, 2017 |
thank you @chukazu and others for your contribution. I really appreciate men like you taking out time keeping people informed. As said by chukazu, I calculated that moulding blocks is really cheaper than buying. but is it reasonable to pay someone 8k for moulding 10 bags of cement. please I look forward to you guys reply. Thanks once again. |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Chukazu: 2:06pm On Sep 18, 2017 |
couragemath: the calculation should be based on " a Day's job" and in if you calculate a day wage , the bricklayer should be able to exhaust the 10 bags of cement in two days and so 5k should be a good wage for the duration as much as possible, do more of direct labour... what I mean, I had an experience where someone quoted 120k for plastering the house ,I tried negotiations and the least offer I had was around 90k but some1 suggested we hire labourers and pay them on daily basis which I did, at the end I ended up spending about 45k now that is massive. so don't pay base on contract but on direct labour with maximum supervision 2 Likes |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 10:32am On Sep 19, 2017 |
Thanks chukazu for the reply. Please the attached below is the quotation given me from foundation to dpc. Is this okay guys. Thank you.
|
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 10:56am On Sep 19, 2017 |
Here is the estimate
|
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Nobody: 12:30pm On Sep 19, 2017 |
couragemath:mould your own block. Pegging is 8k, digging and pouring should be 8 persons at 3500 each. Laying of blocks is 50 naira per block 3 Likes |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by kenazuu(m): 1:26pm On Sep 19, 2017 |
couragemath: Yes. 1 Like |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 11:20pm On Sep 20, 2017 |
ayodele234:Thank you so much for this insight. I just discussed with the guy that I have made my research and he was so surprised. And he has agreed to do the work based on your quote. Is so surprising how people exploit their fellow man. Thank you guys for the response!!! 3 Likes |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by PAO429: 4:34am On Sep 21, 2017 |
ibkgab001:Help with pictures |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by ibkgab001: 12:15pm On Sep 21, 2017 |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 11:19pm On Sep 27, 2017 |
Thanks to you guys. Foundation went so well. Is funny how people try to exploit you but thanks to you guys for your contribution. Now that the foundation is done, does anyone know the cost of digging a 10 feet soakaway. Someone told me 70k. I was thinking of digging the soak away so I can use the sand for filling. Secondly, how many tipper load of sand will be needed for the filling. My foundation is really high (5 coach of block). At this stage, how much should move the progect from the foundation to lintel level. It has 8 pillars because of parapet. Thanks again to you guys. Persons like me really appreciate your Precious time and contribution 3 Likes |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Nobody: 5:23am On Sep 28, 2017 |
couragemath:12,000 naira to dig the soak away 2 Likes |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 12:16pm On Sep 28, 2017 |
ayodele234:Thank you @ayodele. I really appreciate this info. I just found out that a tipper load of red sand is 8k |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 2:23am On Sep 30, 2017 |
please guys, what is the cost of german floor and how important is it. thank you once again! |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by ceelog(m): 5:21am On Sep 30, 2017 |
SEOManiac: So Bros this your friend used 9.5 million (that is excluding 4.5m for land, 4m for roof and 1m for lights) to build, plaster, paint, tile, interlock, put amenities in a 6bed duplex? Please there is a lot you are not telling us. Give us a rough breakdown of how that was achieved. I ask because am directly involved in my own low cost build. 1 Like |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Nobody: 8:28am On Sep 30, 2017 |
couragemath:pay 35,000 for german floor labor and use 15 bags of cement |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 4:46pm On Oct 02, 2017 |
ayodele234:@ayodele please what is the cost of filling the foundation, labour included. Thank you. |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by Nobody: 8:10pm On Oct 05, 2017 |
couragemath:16 trips of red sand at 8,000 each and 25,000 naira for labor 1 Like |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 12:16am On Oct 07, 2017 |
ayodele234:Thanks for the info @ayodele. I’m really grateful |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 10:15am On Oct 10, 2017 |
couragemath:at @ayodele thank you so much. You have been so helpful. Please can you give me your email so can email you Secondly how much is town planing. They came and size our work equipment yesterday and they are saying I pay 170000 naira to approve my plan/drawing. Guys please I need your response. Thank you. |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by adebaxton(m): 6:16pm On Oct 12, 2017 |
lancee: sent√ 1 Like |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 1:51pm On Oct 15, 2017 |
Does anyone know the cost of roofing a 4 bedroom bungalow with aluminum roofing sheets. Thank you. |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by timesup234: 7:49pm On Oct 15, 2017 |
couragemath:..... |
Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by couragemath: 1:02am On Oct 20, 2017 |
Please was the cost of casting a lintel (4 bedroom bungalow with 8 pillars). Labour and material included. Also I will also like to have an idea of the cost of a roof parapet. The bags of cement needed and also the rod. Thank you everyone for your help. You guys have been so helpful. |
(1) (2) (3) (4) (5) (6) (7) (Reply)
Landlord, Pastor Daniel Obasi Killed As 2-Storey Building Collapses (Graphic) / Top 10 Biggest Estates In Nigeria / My Landlord Sneaks Into My Apartment
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 55 |