Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,205,567 members, 7,992,946 topics. Date: Sunday, 03 November 2024 at 09:03 PM

Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government - Politics (3) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government (10111 Views)

Tribute To Tolulope Arotile, By Goodluck Jonathan / Emmanuel Oscar And Yohanah Kilus Executed By Boko Haram In Borno / ‘My Transition Hours’ A Book By Goodluck Jonathan (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 3:36pm On Oct 20, 2017
obailala:
Lol... achievements on paper right?.... I can see most of the projects having something to do with electricity, but as at the last week of May 2015 (week of handover), Nigeria's power generation crashed to less than 1500mw. From that list I can also see countless mushroom projects which one cant even confirm if they were accomplished or not. I can bet you, if APC decides to publish a similar list of it's so called mushroom achievements, the list will also be as populated; and of course it would be welcomed with the very typical response - 'propaganda'


A second look at that list, I just sighted PH - Owerri road listed as an achievement, Lawd av merci! A road which as at last year was still one of the worst roads in the country is listed as an achievement of GEJ. I can bet you that 90% of those projects on those lists were only awarded but no money released. Payment of debts owed to contractors for the little bit of the work they did is the main thing that has swallowed most of the capital budget of since the current admin took over. Yet someone still comes in 2017 to campaign for 2015 elections. Owing to the fact that this admin has had to finance/continue financing most of those projects mentioned, we can be safe to also list all these prijects again as the achievements of Buhari

don't mind the liars, we all knew GEJ was a failure, period, I remembered how reuben abati pasted a picture of a road in Cameroon as part of GEJ's achievements. It was really an online disgrace then lol

2 Likes 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by engineerboat(m): 3:41pm On Oct 20, 2017
AcquireCofOLand:
Hmmmm, I keep a sealed lip as I can observe these are all propaganda in politics to score cheap political points.



All you ca just do is show to us How the OP is not true

1 Like

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by engineerboat(m): 3:43pm On Oct 20, 2017
Goke7:


don't mind the liars, we all knew GEJ was a failure, period, I remembered how reuben abati pasted a picture of a road in Cameroon as part of GEJ's achievements. It was really an online disgrace then lol


What is the current power output and generation

1 Like 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Keballl: 3:43pm On Oct 20, 2017
obailala:
Lol... achievements on paper right?.... I can see most of the projects having something to do with electricity, but as at the last week of May 2015 (week of handover), Nigeria's power generation crashed to less than 1500mw. From that list I can also see countless mushroom projects which one cant even confirm if they were accomplished or not. I can bet you, if APC decides to publish a similar list of it's so called mushroom achievements, the list will also be as populated; and of course it would be welcomed with the very typical response - 'propaganda'


A second look at that list, I just sighted PH - Owerri road listed as an achievement, Lawd av merci! A road which as at last year was still one of the worst roads in the country is listed as an achievement of GEJ. I can bet you that 90% of those projects on those lists were only awarded but no money released . Payment of debts owed to contractors for the little bit of the work they did is the main thing that has swallowed most of the capital budget of since the current admin took over. Yet someone still comes in 2017 to campaign for 2015 elections. Owing to the fact that this admin has had to finance/continue financing most of those projects mentioned, we can be safe to also list all these prijects again as the achievements of Buhari

You are a terrible person. You can bet? If we challenge you na, story go develop.

The OP listed a lot and all you have is just flimsy rebuttal.

2 Likes

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by engineerboat(m): 3:52pm On Oct 20, 2017
Keballl:


You are a terrible person. You can bet? If we challenge you na, story go develop.

The OP listed a lot and all you have is just flimsy rebuttal.


That is what they are good at.

They have nothing to offer

1 Like

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 3:58pm On Oct 20, 2017
engineerboat:



What is the current power output and generation

something that fluctuates every now and then, today is 5000mw tomorrow is another figure, same thing we were experiencing under the last administration . let's not deceive ourselves, it's because we celebrate mediocrity in Nigeria, we think one administration is better than the other.
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 4:04pm On Oct 20, 2017
Goke7:


something that fluctuates every now and then, today is 5000mw tomorrow is another figure, same thing we were experiencing under the last administration . let's not deceive ourselves, it's because we celebrate mediocrity in Nigeria, we think one administration is better than the other.

Last admin is far better than what we have today.

2 Likes 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by luvinhubby(m): 4:11pm On Oct 20, 2017
Goke7:


and you were able to drive all through to coconut abi? again you guys are not helping GEJ's political career but mocking him. there are big craters before coconut where tankers and containers fall into regularly. smh

Oga keep quiet and stop rehearsing what you saw on facebook.
Where you have huge potholes is between Tin-can first gate and second gate.

2 Likes

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Keballl: 4:17pm On Oct 20, 2017
engineerboat:



That is what they are good at.

They have nothing to offer


Absolutely nothing to offer. They have been exposed.

2 Likes 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 4:20pm On Oct 20, 2017
lalastica help push this to frontpage.

2 Likes

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by father01: 4:21pm On Oct 20, 2017
hakimi1974:
thrash.

Why won't be trash, when you have refused to reason

2 Likes

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Cjrane2: 4:28pm On Oct 20, 2017
erunz:
Nice one, GEJ really tried his best even if he had some flaws. Buharideen over to you, show us project executed by this government in the North.

Okay o! Over to the Buhari Bin laden group to publish their own successful projects on state by state analysis. grin grin grin grin grin grin

I am already laughing because i know after they said they helped 1,000 people get married in Kano, they will write that they sent Python dance to immunize children of monkey pox and kill those that dared demonstrate peacefully. grin grin grin grin grin grin grin grin grin grin

Waiting patiently for Lie Mohhammed to come out with propaganda of how GEJ asked Baru to steal $25 billion which Buhari could have used for projects to improve Nigeria. grin grin grin grin grin grin grin grin grin

4 Likes

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by obailala(m): 4:56pm On Oct 20, 2017
Keballl:


You are a terrible person. You can bet? If we challenge you na, story go develop.

The OP listed a lot and all you have is just flimsy rebuttal.
Bro, sorry to disappoint you but I am not a terrible person. I didnt need to even look far to see how politically deceitful the list was... When I saw the list, first thing I did was to scroll down to my area and to my bewilderment, PH to Owerri road was listed as achievement. That's not just an insult to Nigerians, it's also a devilish claim. But then again, that is what politics is all about in our part of the world. If one of the worst roads in Nigeria can also be listed as an achievement, then kindly give me just one reason why I should regard the rest of the list?

If you think there's nothing wrong with what I pointed out, then it's okay to also list the following as the achievements of Buhari:-
-Lagos-Ibadan expressway reconstruction
-Onitsha-Enugu expressway reconstruction
-PH-Enugu expressway rehabilitation
-Owerri-Aba-Ikot Ekpene road
-Benin-Auchi-Okene-Lokoja road dualisation
-Abuja Airport revamp
-Upgrade of Sam Mbakwe Cargo Airport
-Construction of Abuja-Kaduna standard Gauge railway (N17bn out of the N60billion fund for that railway was paid off by the current admin)
-Construction of Lagos to Kano and Lagos to Calabar standard gauge railways
-Construction of the Largest power plant in Nigeria (Mambilla hydro dam)
-Construction of Zungeru hydro power dam
-Upgrade of TCN transmission capacity from 5000-7000mw
Etc etc etc...

1 Like 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by hakimi1974(m): 5:51pm On Oct 20, 2017
father01:


Why won't be trash, when you have refused to reason
you listed capital projects completed by the last administration. and you drew my attention to this abuja to kaduna standard guage railway project that was completed and commisioned by the present administration. what are you saying?
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by engineerboat(m): 6:14pm On Oct 20, 2017
Keballl:


Absolutely nothing to offer. They have been exposed.

Seriously Exposed.


They have been Blocked to a corner.

Just expect their reply soon

We are ready for them

3 Likes 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Keballl: 6:41pm On Oct 20, 2017
obailala:
Bro, sorry to disappoint you but I am not a terrible person. I didnt need to even look far to see how politically deceitful the list was... When I saw the list, first thing I did was to scroll down to my area and to my bewilderment, PH to Owerri road was listed as achievement. That's not just an insult to Nigerians, it's also a devilish claim. But then again, that is what politics is all about in our part of the world. If one of the worst roads in Nigeria can also be listed as an achievement, then kindly give me just one reason why I should regard the rest of the list?

If you think there's nothing wrong with what I pointed out, then it's okay to also list the following as the achievements of Buhari:-
-Lagos-Ibadan expressway reconstruction
-Onitsha-Enugu expressway reconstruction
-PH-Enugu expressway rehabilitation
-Owerri-Aba-Ikot Ekpene road
-Benin-Auchi-Okene-Lokoja road dualisation
-Abuja Airport revamp
-Upgrade of Sam Mbakwe Cargo Airport
-Construction of Abuja-Kaduna standard Gauge railway (N17bn out of the N60billion fund for that railway was paid off by the current admin)
-Construction of Lagos to Kano and Lagos to Calabar standard gauge railways
-Construction of the Largest power plant in Nigeria (Mambilla hydro dam)
-Construction of Zungeru hydro power dam
-Upgrade of TCN transmission capacity from 5000-7000mw
Etc etc etc...

You are simply a clown. The same LAGOS-IBADAN expressway abandoned by the construction. The rest of your list are just laughable. SMH..

6 Likes

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Bizibi(m): 7:19pm On Oct 20, 2017
Goke7:


PMB is actually your headache as i can see so why will you guys lie about GEJ's capital projects which are not there. You guys should come up with another lie that he completed Lagos-Ibadan express road grin
useless apc sycophant......

1 Like

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 7:30pm On Oct 20, 2017
father01:
Last admin is far better than what we have today.

keep the lies alive eh! unfortunately in my area, we even saw more light this year now than we've seen in the last 5 years. grin
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 7:43pm On Oct 20, 2017
luvinhubby:


Oga keep quiet and stop rehearsing what you saw on facebook.
Where you have huge potholes is between Tin-can first gate and second gate.

unfortunately you can't deceive me like you deceive others cos I work around trinity where the road is in a total mess. I know how much you guys love GEJ but you can't continue to launder his image with lies.

1 Like 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 7:45pm On Oct 20, 2017
Bizibi:
useless apc sycophant......

see painment grin
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by luvinhubby(m): 7:55pm On Oct 20, 2017
Goke7:


unfortunately you can't deceive me like you deceive others cos I work around trinity where the road is in a total mess. I know how much you guys love GEJ but you can't continue to launder his image with lies.

I equally work from Tin-can, so i ply that route almost on daily basis, you cannot tell me about the place.

1 Like

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by anonymuz(m): 8:25pm On Oct 20, 2017
sarrki:
Blantant lie

How many of this project was completed ?

How many was funded ?

What is the price of oil then ?

Most of this projects were fraudulent
before I checked ur monicker only your comment says it all.

1 Like 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by erunz(m): 8:27pm On Oct 20, 2017
Goke7:


keep the lies alive eh! unfortunately in my area, we even saw more light this year now than we've seen in the last 5 years. grin
which area

1 Like

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by erunz(m): 8:29pm On Oct 20, 2017
Goke7:


unfortunately you can't deceive me like you deceive others cos I work around trinity where the road is in a total mess. I know how much you guys love GEJ but you can't continue to launder his image with lies.
your hate for Gej have taken over your good sense of reasoning

1 Like 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Goke7: 8:59pm On Oct 20, 2017
erunz:
your hate for Gej have taken over your good sense of reasoning

so I should lie about the road to my work place because of your GEJ abi? smh
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by obailala(m): 12:02am On Oct 21, 2017
Keballl:


You are simply a clown. The same LAGOS-IBADAN expressway abandoned by the construction. The rest of your list are just laughable. SMH..
Wow! You couldn't even stand your own medicine for a second, you think I'm a clown for exposing your ridiculous hypocrisy right?

"You are a terrible person....."

Those were the exact words you tagged me when I asserted that majority of the so called 'GEJ achievements' on that list were either fake or just a bunch of uncompleted projects or even projects that never kicked off (e.g. the PH to Owerri road), or just mediocre projects labelled with big names.

You called me a terrible person for pointing out the scam in the list to you, so in the spirit of your 'mediocrity endorsement', I decided to play your game by pointing out similar examples of projects started or signed for by Buhari. But then, you think the Buhari projects are laughable but the GEJ uncompleted or even the 'never started' projects aren't laughable to you right?

In all honesty, who do you think is the bigger clown between us both?
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by joelfm(m): 2:24am On Oct 21, 2017
father01:

IMO STATE:
*NDDC Projects: St Marks Estate and Federal Housing Estate Internal Road, New Owerri Ejizie – Izuogu Road in Akeme community of Arondizogu, and the Solar Powered Water Project at Mbaoma in Owerri North & Owerri Urban Water Scheme Project, Rehabilitation of Opkpuala – Iguruta Road(Imo and Rivers States), Reconstruction of Elele – Owerri Road
Sea – Port and Naval Base Project in Osse – Motor
*Community (World Bank /FGN/Imo state) sponsored project.
*Construction of Administrative Complex and Entrepreneurial Studies Complex in Federal University of Technology Owerri (FUTO)
*Construction of the new Federal High Court Owerri division complex
*Establishment and Construction of a Court of Appeal Division in Owerri
*14Km Mbaise – Ngwa Road with a bridge at Imo/ Abia State (Cost ₦2.94Billoin)
*SURE – P Project on Primary Health Centres and other projects
*Rehabilitation of Owerri – Port Harcourt Road
*Ecological Control Projects at Nekede, Saint Kzito Secondary School in Muchina and the Umuoza – Ugri Erosion Control
*Rehabilitation of the Sam Mbakwe International Airport Owerri
*Egbema Power Plant (338MW)
*e-wallet System in distribution of the agricultural inputs to the Farmers and Dry Season Farming Project
*Ongoing Mbalano 2 x 30/40MVA, 132/33KV Substation and Okigwe 2 x 30/40MVA , 132/133KV Substation
*Dualisation of Ada Owerri – Ikot – Ekpene Border Section Phase one in Imo, Abia and Akwa –Ibom States
*Construction of Oguta River Port in Imo State

ABIA STATE:
Completion of Alaoji Power Plant (1074MW)
SURE – Projects on Primary Health Care (PHC) and others
MDG Projects ( in partnership with the state Government) 250 Health Centres and 10 Solar Powered
*Water Boreholes completed and commissioned
*Rehabilitation of the Federal Roads: Mbaise – Ngwa Road with a bridge and Owerri – Aba Road
*504MW Power Plant at Aba and 133KVA Substation in Umuahia (Under the Federal Government/Abia state Partnership Projects)
*e – wallet system in the distribution of Agricultural Inputs to the farmers and Dry Season farming projects
*Umuahia – Mbalano 132KV Line
*Mbalano 2 x 30/40MVA, 132/33KV Substation
*Ohafia 2 x 30/40MVA, 132/33KV Substation and Ohafia – Arochukwu 132KVA Line
*Okigwe 2 x 30/40 MVA, 132/33KV Substation
*Ongoing Ohafia 2 x 30 /40 MVA, 132/33KV Substation
*Umuahia – Ohafia 132KV Single – Circuit Line, Umuahia – Mbalano 132KV Line, Ohafia – Arochukwu 132KV Line
*Rehabilitation and Re – opening of the NNPC depot at Aba after 6years of closure.
*Rehabilitation and Construction of Goodluck Jonathan Barrack in Ohafia
*Establishment of Abia State Office of the National Productivity Centre.
*Rehabilitation of Agricultural Skills Training Centre
*NDDC – Obehia – Azumini – Ukanafun Road (Abia – Akwa Ibom) Roads Projects
*Construction of a storey building for 136 Inmates at Aba Prison.

SOUTH WEST GEO – POLITICAL ZONE
ONDO STATE:
*Omotosho I Power Plant Completed and commissioned
*Omotosho II Power generating plant built from the scratch and commissioned.
*Akure Airport One of the nine Airports remodelled
*Benin – Ore – Shagamu duel carriage way rehabilitated after years of neglect
*Akure – Ilesa express way rehabilitation
*Sure – P Projects on Primary Health Care and Transportation
*Erusu/ Arigidi Dam in Akoko North West Area of Ondo State under Benin – Owena River Basin Development Authority (BORBDA)
*e – wallet System in Agricultural Inputs supply to the farmers
*Dry Season Farming Projects
*NNDC has a total of 589 Projects in Ondo State out of which 317 are already completed while 15 Mega Projects are ongoing such as Township road in Ugbo – nla, boreholes, interlocking road project, solar powered street light Projects etc.
*Rehabilitation of Ipele – Idoani Road.
*Construction of Federal Highway Emergency Clinics (Oka, Isua Akoko)
*Periodic Maintenance of Akure – Owo Road.
*2 x 60MVA, 132/33KV Substation at Okeagbe Akoko
*2 x 60MVA, 132/33KV Substation at Ose Local
*Government Area Headquarters Ondo State.
*New Akure 2 x 150MVA, 330/132kv + 2 x 60MVA, 132/33KV Substation.
*NDDC Water Project at Ukparam, ondo state
*Establishment of a new Fed. Polytechnic at Ile – Oluji
*In 2012, FG Commissioned at Cultural Industry Centre in Owo
*Construction of MDG/NDE Skill Acquisition Centres in each of the 3 Senatorial districts of Ondo State.
*Construction of Jetties at Igbokoda.

LAGOS STATE:
Lagos – Kano Rail Revival Commissioning of New Air Conditioned Train Coaches and other rail way Services in Lagos
*SURE – P Projects on Primary Health Centre.
*e – Wallet System in the distribution of the agricultural inputs to the Farmers and the Dry Season Farming Projects.
*Construction of Adiuyan water works phase II near Lagos
*Third Mainland Bridge phase 2
*Apapa – Orile – Mile 2 – Cele, Oshodi road rehabilitated
*The Federal Government under writes a ₦40B loan for infrastructural and educational development in Lagos (2014)
*Rehabilitation of the Muritala Muhammed International Airport Lagos
*Lagos – Sagamu road rehabilitated
*Installation of 1000 Close Circuit Television (CCTV) cameras to boost security of lives and property
*Ikorodu – odogunyan – Shagamu 132KV double circuit transmission line
*2 x 60 MVA, 132/33KV Substation at Odogunyan and Ayobo with 132KV double – circuit transmission line Ikeja west – Ayobo.
*Omotosho – Epe – Aja 330KV double – circuit transmission Line, Omotosho – Erukan – Ogijo 330KV double Circuit transmission line
*Provision of additional 2 x 150MVA, 330 / 132KV Transformer capacity at Olorunsogo transmission station.
*Federal Government College Laboratory refurbished in Ijanikin – Lagos.
*Rehabilitation of the National Theatre Iganmu – lagos.
*Establishment of Nigerian Army dog Centre at Ipaja lagos.
*Establishment of Cancer Treatment Centre at the Federal Medical Centre, Ebutte Metta.
*Establishment of Maritime Institute at the University of Lagos

EKITI STATE:
*Establishment of a new Federal University in Oye – Ekiti
*SURE – P Projects
*e – wallet System in the distribution of the agricultural inputs to the farmers and the Dry Season farming projects
*Rehabilitation of Ekon – Alaaye – Erinmo – Iwaraja road in Ekiti and Osun States
*Omuo – Ifaki road of Ado – Ilumoba – Agbado Ikare Akoko Road sections A & B
*Construction of Model Skill Acquisition Centre

OSUN STATE:
*Ilesha Water Project (Ilesha Dam)
*Ogun – Osun River Basin Projects and Ife Dam
*e – wallet System in the distribution of the agricultural inputs to the farmers and the Dry Season farming Projects
*Construction of Silos
*Rehabilitation of Efon – Alaaye – Erinmo Ijesha – Iwarga Road ( Ekiti – Osun States)
*Oshogbo – Ede 13KV double – circuit transmission line, 2 x 60MVA, 132/ 33KV Substation at Ede
*Modernisation of Obafemi Awolowo University (OAU) Teaching Hospital Ile – Ife to meet International standard.

OYO STATE:
*Rehabilitation of the Ibadan – Ilorin Road (Dualization of road)
*Rehabilitation of the Ibadan – Lagos Road
*Lagos – Ibadan new gauge Rail Line Service
*University college Hospital Ibadan upgrade with facilities to commence open heart surgeries
*SURE – P Projects in Primary Health Care
*e – Wallet system in the distribution of the Agricultural Inputs to the farmers and the Dry season Farming Projects.
*Rehabilitation of the Ibadan Air port.
*Ibadan – Oyo road dualisation
*Construction/ Rehabilitation of Gbogan – Iwo Road
*Rehabilitation of Odo oba – Takie – Gambari otte in Oyo/Kwara States
*Rehabilitation of the Old Oyo – Ogbomosho Road
*2 x 60MVA, 132/33KV substation at Igangan and 132KV switching station at Igboora
*New Abeokuta – Igboora – Lanlate 132KV double Circuit Transmission Line and 132KV Tee – off at Igboora – Igangan
*Ganmo – Ogbomosho 132 KV Double – Circuit transmission line and 2 x 60MVA,132KV Substation at Ogbomosho
*2 x 30/40MVA, 132/ 33KV Substation at Lanlate
*Renovation of the Obafemi Awolowo Stadium Ibadan

OGUN STATE:
*Olorunsogo Power Plant (750MW) successfully completed and privatised
*The Procter & Gamble Plant in Agbara Ogun States has been commission(March 17,2014)
*e – wallet System in the Distribution of the agricultural inputs to the farmers
*Dry Season Farming Projects
*Lagos – Sagamu – Ore road rehabilitation
*Rehabilitation/ Construction of Ijebu Igbo Ajegunle – Araromi – Ife – Sekona Road (Section II) in Ogun State
*Rehabilitation of Otta – Owode Road in Ogun State


NORTH – EAST GEO – POLITICAL ZONE
TARABA STATE:
*SURE – P Project on primary Health Care ( PHC)
*Construction of Takum and the Kashimbila Multi – Purpose Dam Project in Yangtu.
*Establishment of a new Federal University in Wakari, Taraba
*e – wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming projects
*Construction of Silos in Taraba State
*Construction of Jalingo – Kuna Lau Road (Section II)
*Reinstatement of collapsed section of Wakari – Mutum Biyu Road in Taraba State.
*Rehabilitation of Wukari – Takum Road, Wukari /Akwana Road.
*Ongoing reconstructionof Zing – Yakoko – Monkin Road
*Construction of Perishable Cargo Terminal in Jalingo
*Ongoing recinstruction of Zing – Yakoko – Monkin road.

GOMBE STATE:
*Reinstatement of Collapsed section of Gombe – Potiskum road
*Construction of Gombe – By Pass Road
*Rehabilitation of Gombe – Numan – Yola Road (Section II)
*Establishment of a new Federal University in Kashere, Gombe State
*SURE – P projects on Primary Health Care (PHC)
*e – Wallet System in the distribution of Agricultural Inputs to the farmers and the Dry Season Farming Projects
*Construction of Export Crop Preservation and Conditioning
*Establishment and Construction of Special AlmajiriSchool
Provision of improved Cotton Seedlings Free of Charge
for farmers
Rehabilitation of Tumu – Pindaiga – Kashere Road
Establishment of a new Teaching Hospital

BAUCHI STATE:
*Federal Government spent ₦11Billion on MDG’s Project in Bauchi State as 2013.
*SURE – P Projects on Primary Health Centres
*e – wallet system in the distribution of the agricultural inputs to farmers and the Dry Season farming Projects – under which incentives were provided for nothing less than 10,000 Dry Season rice farmers in Bauchi State.
*Construction/ Rehabilitation of Yashi – Basher – Dengi section in Bauchi and Plateau States and Rehabilitation of Futuk – Yalo Road.
*Rehabilitation of Futuk – Yalo Bauchi State
*Establishment of Cancers Treatment Centre in Abubakar Tafawa Balewa Teaching Hospital Bauchi

ADAMAWA STATE:
*Establishment and Construction of Almajiri school
*Provision of improved Cotton Seedlings free of charge for farmers
*e – wallet System for the distribution of agricultural inputs to the farmers and Dry Season farming Projects
*Rehabilitation and remodelling the Yola Airport
*SURE – P Projects on Primary Health Centres
*2 x 60 MVA, 132/33KV substation at Mubi, 2 x 60 MVA, 132 / 33 KV Substations at Gulak 132 KV double circuit transmission line, 30 MVA, 132/33 KV mobitra at Mayo Belwa, Adamawa state.
*A new NAF Comprehensive Secondary School Yola commissioned.
*Partial State of emergency to enhance democratic stability in Adamawa, Yobe and Borno States
*Completion of Yola – Numan road in Adamawa
*Ongoing 30MVA, 132/33KV Mobitra at Mayo Belwa, Adamawa State. Yola – song – Litle at Gombi – Mubi – Gulak 132kv Double Circuit Transmission Line. 2 x 60 MVA, 132/33kv *Substations at song, Little Gombi, Mubi and Gulak

YOBE STATE:
*Gashua – Hadejia 132KV double – circuit trasnsmission line, 2 x 60MVA, 132/33KV substation at Gashua and 2 x 132KV Line Bays Extension at Damaturu and Hadejia Substations. Damaturu – Gashua 132KV double – circuit
*Transmission Line and Damaturu 2 x 150 MVA, 330/132KV Substation.
*SURE – P Projects on Primary Health Care (PHC)
*e – Wallet system in the distribution of Agricultural Inputs to the farmers and the Dry Season farming.
*Establishment and construction of Special Almajiri School
*Provision of improved cotton Seedlings free of Charge for farmers
*Gashua Power Station
Desertification Control Projects: Establishment of 15 Row Green Belt (80Km) and Presidential Initiative on Afforestation

BORNO STATE:
*Rehabilitation of Uba – Mbala Road
*Dualization of Maiduguri – Kano Road
*SURE – P Projects on Primary Health Care. (PHC)
*Rehabilitation of the Maiduguri Airport
*Enugu – PH – Maiduguri Railway Fixed.
*e – Wallet system for the distribution of agricultural inputs to the farmers at subsidized rate and *Dry Season Farming projects.
*Desertification Control Projects: Establishment of 15
*Row Green Belt (80 Km) and Presidential Initiative on Afforestation
*Maiduguri 1 x 150 MVA, 330/ 132KV + 1 X 6 MVA 132 /33 KV substations.
*Ongoing Maiduguri 1 x 150MVA, 330/132KV + 1x 60MVA, 132/33KV Substation
*33KVA Transmission substation at Damboa / Biu Road.
*Completion of Uba – Mbalala Road in Borno State



SOUTH – SOUTH GEO – POLITICAL ZONE
EDO STATE:
Ihovbor power Station (451 MW)
Rehabilitation of Benin – Ore – Sagamu dual carriage
way.
Asphalt overlay of 2km access road to the federal
Science & Technical College on Uromi
Emergency reinstatement of washout/gully erosion at
KM 127 + 000 at Auchi along Okene – Benin road and
14 + 000 Km along Auchi Agenebode Road
Benin – Auchi road rehabilitation and dualised
SURE – P Projects on Primary Health Care (PHC)
Ukpoke irrigation Projects
Water supply projects in Northern Ishan of Edo State (9
million litres per day plant capacity) for Uromi, Ubiaja,
Ugengu, Ugboha and Igueben
1 x 60 MVA , 132/ 33kv Substation reinforcement at
Ukpilla substation and 2nd Benin – Onitha 330kv single
– Circuit line
Land reclamation and Erosion Control works project at
Igonton – Igbanke and Iyom/Okhelen – Awo road Uromi
Modernisation of University of Benin Teaching Hospital,
Benin.
NDDC Reconstruction of Benin – Abraka phase I in
2012, FG Commissioned a cultural Industry Centre in
Auchi, Edo state.
Construction of Jetties at Agenebode

DELTA STATE:
* Ongoing construction of Itakpe – Ajaokuta – warri
modern railway
* Inauguration of Illah irrigation project.
* Second Niger Bridge – on going with SURE – P funds
* SURE – P Projects on Primary Health Care (PHC)
* Rehabilitation of Warri Refinery and the access roads
to the Refinery
* The NNDC Sponsored Projects: Nurse quarters,
electricity projects ultra modern Health Centre and Solar
Powered Water project
* Supply and installation of Laboratory equipment at
federal University of Petroleum Resources Effurun
* e – wallet system in the distribution of agricultural
inputs to the farmers and the Dry Season farming
projects
* New Library Projects at the Federal at the federal
Government College (FGC) Warri and at the federal
Government Girls College Ibusa
* The Proposed $16 B Gas City Project at Ogidigben in
Warri South West Area of Delta State to host: A gas
processing plant, a fertilizer plant and a petro chemical
plant
Sea Port
* 1 x 60 MVA Substation at Ughelli Power Plant and 1 x
30/40 MVA Substation reinforcement at Amukpe
* NDDC Construction of Orhorbo – Odurubuo, Kpakama
– Bomadi road phase I, Gberegolor – Ogriagbene Road
* Land reclamation and erosion control works projects in
Kurutie, Gbaramatu Clan Warri South, and Idumuje –
Unor Erosion Control Project.
* Canalization of Odobou – Ogbobagbene creek in
Burutu LGA
* Construction of Model Skill Acquisition Centre and the
Rehabilitation of Agric – skills Training Centre.
* Completion of the Capital dredging of the Lower River
Niger from Warri (Delta state) to Baro (Niger State)
532km.
* Supply of instruction materials to the Federal
Government College Warri
* Establishment of the Nigerian Maritime University and
the NIMASA Shipyard & Dockyard at Okerekoko Warri
CROSS RIVER STATE:
* Qua Falls Dam and Irrigation Project, Dry season
Farming and e – wallet system in the distribution of
agricultural inputs to the farmers
* Construction of an Export Crop Preservation and
conditioning centre
* Ongoing Obudu – Ogoja 132kv Double – Circuit
Transmission line, 2 x 30/40 MVA 132 /33kv Substation
at Ogoja
* Sure – P Projects on Primary Health Care and others.
* Periodic maintenance of Rumukurshi – Chokocho road;
Reconstruction & Pavement strengthening of Ikom –
Mfum Road
* Revitalised Calabar Substation (561mw)
* Rehabilitation of Ikom – Mfum (Cross River) –
Abakiliki – Mbok (Ebonyi)
* Construction of Calabar – Ikom – Katsina – Ala Road
in Benue state
* Rehabilitation of Margaret Ekpo International Airport
Calabar
* NDDC Ubana Utanga Water Project
* NDDC Electrification Project
* Modernisation of the University of Calabar Teaching
Hospital
* Land Reclamation and Erosion control works project in
Essien town – Ekorin in community.
* Construction of Agric Skills Training Centre in Cross
River state.

AKWA IBOM STATE:
* Complete of Nkari Earth dam
* Construction of 100,000 metric tonnes capacity silos
* e – wallet system in the distribution of agricultural
inputs to the farmers and the Dry season farming projects
* SURE – P Projects on Primary Health Care (PHC)
* Establishment of a new Federal Polytechnic in Ukana
* Approved building of Ibaka Deep Seaport
* Ibedu/Ibiako Rural Electrification Projects (Under
NREP) with JICA’S grant aid Intervention
* Land reclamation and erosion control works project in
Ibakang Nsit – Ikot Ekpo – Unyene Road, * Nsit Attai in
Akwa Ibom State.
* Remediation, Rehabilitation and Restoration of the Oil
impacted site at stubbs Creek, Eket –Akwa Ibom.
* NDDC –Idoro – Eaten – Itam Water Project
* Akwa Ibom State office of National Productivity
Centre was established
* Construction of 3 MDG/NDE skill Acquisition centres
in each of the three Senatorial Districts in Akwa Ibom
RIVERS STATE:
* Revived Omoku sub power station (225mw)
* Port Harcourt – Enugu – Maiduguri Rail Fixed
* Owerri – Port Harcourt Road ( Ongoing)
* SURE – P Projects on Primary Health Care (PHC)
* e – wallet in the distribution of subsided agricultural
inputs to the farmers and Dry Season farming Projects
* Rehabilitation of the Port Harcourt International
Airport.
* NDDC Electrification projects in Khana LGA and
Eleme
* 10 rooms hostel at Immigration Training School at
Ahoada
* Construction of Jetties at Degena.
* Establishment of Cancer Treatment Centre in
UNIPORT Teaching Hospital.
* Ongoing Rehabilitation of the Port Harcourt Refinery
* Transformation of the Onne Oil and Gas Free Zone
with 6 billion USD invested leading to the attraction of
150 companies into the zone with 30,000 jobs created to
date
* Establishment of a new Federal Oil and Gas
Polytechnic at Bonny

BAYELSA STATE:
* Periodic maintenance of East – West – Odi Road
* Gbarain sub power station (225mw) revitalized
* Establishment of a new federal University in Otuoke
* SURE – P Project on Primary Health Care (PHC)
* e –wallet system in the distribution of Agricultural
Inputs to the farmers and the Dry Season Farming
Projects
* Construction of the federal Government Secretariat in
Yanagoa.
* Central Ogbia Regional Water Supply Project in
Otuoke
* Construction of Jetties at Yenogoa
* NDDC Electrification Projects in Peremabiri –
Ogbokiri in Akassa Bayelsa State.
* Establishment of Maritime Institute at the Niger Delta
University Amasoma.


God will punish you for all these lies, 99 % of all the projects listed are product of your imagination

1 Like 1 Share

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Keballl: 8:25am On Oct 21, 2017
obailala:
Wow! You couldn't even stand your own medicine for a second, you think I'm a clown for exposing your ridiculous hypocrisy right?

"You are a terrible person....."

Those were the exact words you tagged me when I asserted that majority of the so called 'GEJ achievements' on that list were either fake or just a bunch of uncompleted projects or even projects that never kicked off (e.g. the PH to Owerri road), or just mediocre projects labelled with big names.

You called me a terrible person for pointing out the scam in the list to you, so in the spirit of your 'mediocrity endorsement', I decided to play your game by pointing out similar examples of projects started or signed for by Buhari. But then, you think the Buhari projects are laughable but the GEJ uncompleted or even the 'never started' projects aren't laughable to you right?

In all honesty, who do you think is the bigger clown between us both?

Stop the unnecessary rant over an apt description of your person. You counter was laughable at best.

You said you were certain over 90% were awarded but no money released. Can you back this claim? Yes?

Your subsequent replies are void cos they haven't challenged the list up there.

1 Like

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Keballl: 8:26am On Oct 21, 2017
joelfm:


God will punish you for all these lies, 99 % of all the projects listed are product of your imagination

You are already being punished cos you can't back up the nonsense you wrote with facts.

1 Like

Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by obailala(m): 8:48am On Oct 21, 2017
Keballl:


Stop the unnecessary rant over an apt description of your person. You counter was laughable at best.

You said you were certain over 90% were awarded but no money released. Can you back this claim? Yes?

Your subsequent replies are void cos they haven't challenged the list up there.
I don't need to challenge anything else, you put out a list of a thousand phantom achievements, I take a look at the list and the very first thing I saw was a blatant lie (and infact an insult to me as it is a road that concerns me). Please give me one reason why I should keep bothering myself with such a political scam of a list?...

You think it makes sense including uncompleted and unstarted projects in a list of achievements of GEJ, but you dont think it makes sense including uncompleted and recently started projects in the list of achievements of Buhari? You are a shamelessly hypocritical person for reasoning in such a manner.

Just to let you know again, if you think that list posted by the Op makes any sense, then be ye reminded that Buhari can also claim up to 90% of the projects on that same list as his own achievements too, because the current govt has also been involved in most of them too... If you still cannot see how laughable that list is, then that's your cuppa tea.
Re: Breakdown Of Capital Projects Executed By Goodluck Jonathan's Federal Government by Keballl: 9:44am On Oct 21, 2017
obailala:
I don't need to challenge anything else, you put out a list of a thousand phantom achievements, I take a look at the list and the very first thing I saw was a blatant lie (and infact an insult to me as it is a road that concerns me). Please give me one reason why I should keep bothering myself with such a political scam of a list?...

You think it makes sense including uncompleted and unstarted projects in a list of achievements of GEJ, but you dont think it makes sense including uncompleted and recently started projects in the list of achievements of Buhari? You are a shamelessly hypocritical person for reasoning in such a manner.

Just to let you know again, if you think that list posted by the Op makes any sense, then be ye reminded that Buhari can also claim up to 90% of the projects on that same list as his own achievements too, because the current govt has also been involved in most of them too... If you still cannot see how laughable that list is, then that's your cuppa tea.

Until you prove that silly 90% assertion of yours. You are a clown not worth taking serious. A sham of a list you cant counter.

Shameless lots. Shame on you.

1 Like

(1) (2) (3) (4) (Reply)

Former Speaker, Agbakoba, Balewa, Awolowo Lead Pt's Olawepo Hashim's Campaign / Anti-Open Grazing Bill Scales Second Reading In Akwa Ibom Assembly / LASG To Hold Groundbreaking Of $100m Lagos Film City On Wednesday

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 106
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.