Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 2:44pm On Oct 23, 2017 |
Mrjaz:visit the builder's market bro |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 2:51pm On Oct 23, 2017 |
Mrkumareze: toastedbread: i wld NEVER advice a client to do a lintel and tie it all round the structure because like they say; its gives the building strength, prevents cracks or helps carry the roof etc etc... so many reason ppls give. A lintel isnt same as a beam? in-fact unnecessarily putting lintel all round is an added load on the structure (in places like Ajah with water-logged land) it cld collapse the building under weight... IF YOU'RE SURE OF YOUR FOUNDATION, BLOCK SETTING, WHY WORRY? Lintel i repeat is just a bridge, the only reason it was designed into a building is because of the void created by windows and doors - its not a structural element. NO STRUCTURAL ENGINEER DESIGNS A LINTEL, I'm yet to see one - what they design is beams and columns - I'm sure there must be a reason why? U can use L Sections steel, wood, flat bars etc for you lintel - CARRY GO.... (just do it right using a professional) Thanks.... 6 Likes |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by jamal230(m): 3:11pm On Oct 23, 2017 |
Edison design for you floor and walls call 08037688028 1 Like
|
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by sonety2k(m): 3:14pm On Oct 23, 2017 |
saydfact: Please What's the rate of self contain going for per year |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 3:19pm On Oct 23, 2017 |
sonety2k:at Ilese its 54k max |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Jointhemiltons2(m): 3:19pm On Oct 23, 2017 |
modelmike7:So the total amount for building dz is just 8/9mil? Wow nice 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by kingxsamz(m): 3:32pm On Oct 23, 2017 |
Nice 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by kopell: 3:42pm On Oct 23, 2017 |
Daboomb:My brother thanks for picking that up, not only reading oh. They don’t listen or pay attention to details too. 2 Likes |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by delishpot: 3:48pm On Oct 23, 2017 |
Lovely. More blessings |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by gbolex(m): 3:51pm On Oct 23, 2017 |
Your client will be spending over 23 years before ROI |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 3:53pm On Oct 23, 2017 |
gbolex: He's not in the country, he built to honour those asking him to do something on his dad land... lol he's yet to see the building except through pics i sent to him.. 3 Likes |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Nobody: 3:57pm On Oct 23, 2017 |
@saydfact, how much would it cost to build a four flat two bedroom ensuite on an half plot in the suburbs of Lagos? |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by cooljoe7(m): 4:05pm On Oct 23, 2017 |
That's nice. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 4:06pm On Oct 23, 2017 |
ollah1: 4 bedroom flat with 2 rooms ensuite - depending on finishes shd be around 5m-6m 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by ogoplus: 5:25pm On Oct 23, 2017 |
saydfact: Money well spent! 1 Like 1 Share |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Petitol(m): 5:31pm On Oct 23, 2017 |
Nice work |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by PTNL: 6:02pm On Oct 23, 2017 |
Well done bro. This is a nice job. Could u plz lemme have your number on 08035094801 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by eddyline(m): 6:16pm On Oct 23, 2017 |
saydfact: I noticed tour stand for the tank is not welded but rather... Dont know the right word. screwed together. how strong is this compared to the welded version? |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 6:44pm On Oct 23, 2017 |
eddyline: Believe me when I say it's stronger and more expensive... On of those anchor is 4500 naira. (the right name is Salford clips) It's the standard method used in erecting scarfold in multi storey structures 2 Likes |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by piagetskinner(m): 6:47pm On Oct 23, 2017 |
very nice op...I'm guessing each room will go for around 150k |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by okikigsm: 7:00pm On Oct 23, 2017 |
Good work op.you economised to the extent of not having a plan.agbari na everything. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 7:02pm On Oct 23, 2017 |
okikigsm: I'm an Architect... We even did approval and survey plans... Approval cost about 400k and that's not part of the 8m spent on the building itself 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Glocal1: 7:22pm On Oct 23, 2017 |
saydfact:What is your profession bro? A builder or and architect. 2 Likes |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by rajman4001(m): 7:24pm On Oct 23, 2017 |
Nice one. Good Work. .. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Sunnyja: 7:44pm On Oct 23, 2017 |
Daboomb:It was a grate concept, but using scaffolding pipes for overhead tank! What happens when those clips starts to rust? Also, it means that there was no plan to have gate in the self contain considering the span of each unit. These are my few observation. Once more, grate work. 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 9:58pm On Oct 23, 2017 |
Glocal1:Architect |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 10:02pm On Oct 23, 2017 |
Sunnyja: Ur comments on scalford clips implies u maybe do not have adequate knowledge of them... They last the life of the building and can easily be replaced without calling any workman to do same... For as long as 20yrs.. You're covered and even beyond... Its like saying the piped wld rust and the tank wld fall... 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 10:05pm On Oct 23, 2017 |
Sunnyja: Ur comments on scalford clips implies u maybe do not have adequate knowledge of them... They last the life of the building and can easily be replaced without calling any workman to do same... For as long as 20yrs.. You're covered and even beyond... Its like saying the pipes wld rust and the tank wld fall... Where I live, my landlord has installed his for close to 20yrs without replacing.. 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by true2home(m): 10:42pm On Oct 23, 2017 |
Hi, you did a good job on this project in terms of neatness. That said, pls dont get offended when people ask you questions on your project. They are trying to understand your methods and the reason for them. On piler issue, this particular one level project can do without it. The reason beening that there are lots of divider vertical wall such that it can support the roof both horizontally and vertically... we also dont experience seizmic condition much in Nigeria too. So you are good. Six units, with Kitchenettes and toilet wall, all cramed into one small build. quote author=saydfact post=61709412] Ur comments on scalford clips implies u maybe do not have adequate knowledge of them... They last the life of the building and can easily be replaced without calling any workman to do same... For as long as 20yrs.. You're covered and even beyond... Its like saying the pipes wld rust and the tank wld fall... Where I live, my landlord has installed his for close to 20yrs without replacing.. [/quote] |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Daboomb: 11:48pm On Oct 23, 2017 |
saydfact: Below is a picture you supplied on page zero. What do you call this sort of Piping? Conduit or Surface Piping? Again, you seem not to remember that "forces on a Building" are not just vertical? They could be vertical, Horizontal and even sheer forces (that pull things apart) The building elements themselves themselves (including weight of Blocks and Mortar, wood noggins and roofing sheets, e.t.c) all introduce different forces due to their weight, no matter how small (especially sheer forces) that can only be counter-balanced by adequate linking/chaining together. And to think that because your ground is "Rock" therefore the building does not experience "ground forces" is like saying Earthquakes can NEVER occur where the ground is hard! The Earth's crust is in continous motion and upheveal, that is a fact Anyone who has done a little Physics would have encountered all these in a section called "Moment and Froces". (Basic level physics). Most of us talking about adding pillars at specific points in thebuilding at looking at the "long-term" stability fo the building, not the short term. Blocks wear and disintegrate over time, it is the concrete elements that last longer. Anyway, what is done, is done. We are not here to argue but to commend your work and encourage people like you even further. 3 Likes
|
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by eddyline(m): 12:47am On Oct 24, 2017 |
saydfact:I've learnt something today. will keep this in mind until such a time when am blessed 1 Like 1 Share |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (Reply)
The Port Harcourt Luxury Flats / Eko Atlantic Newest Updates In Pictures / Edo Landlord Burns Down His House Over Tenants’ Refusal To Pay Rent (Video)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 43 |