Nigerian Power Plants Coming On Stream In 2018 by NASTYNASOSO: 9:26pm On May 28, 2018
NIGERIAN POWER PLANTS COMING ON STREAM IN 2018

3 Likes

Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 9:35pm On May 28, 2018
16 Years of PDP + $16 BILLION = 2050MW

3 Years of PMB + $5.792 BILLION 3,050MW Mambilla power project and many more.


The difference is clear.

10 Likes 1 Share

Re: Nigerian Power Plants Coming On Stream In 2018 by apriko(m): 9:36pm On May 28, 2018
Parasites....... The 3 major sites is in the south.
Nobody should quote me or else I will transmission something!!

1 Like

Re: Nigerian Power Plants Coming On Stream In 2018 by ALMUSTAQIM(m): 9:37pm On May 28, 2018
YES,
FASHOLA IS WORKING
NIGERIA MOVING FORWARD

#PMB1523

4 Likes 1 Share

Re: Nigerian Power Plants Coming On Stream In 2018 by Omololu007(m): 9:41pm On May 28, 2018
deomelo:
16 Years of PDP + $16 BILLION = 2050MW

3 Years of PMB + $5.792 BILLION 3,050MW Mambilla power project and many more.


The difference is clear.





the mambilla power project was started during the tenure of shagari(not so sure), I don't think it has been completed sef.

And power situation keeps on getting worst where my two house are located
Re: Nigerian Power Plants Coming On Stream In 2018 by thesicilian: 9:49pm On May 28, 2018
Is there another 2018 coming after this?
Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 9:51pm On May 28, 2018
Omololu007:
the mambilla power project was started during the tenure of shagari(not so sure), I don't think it has been completed sef.

And power situation keeps on getting worst where my two house are located


1. You are lying, it was on the drawing board for 30 years and previous governments ignored it even though this single project with less cost than the $16 billion PDP looted can generate 3050MW.


2. Is it even possible to start any project that money was never budgeted for and the contract was never awarded in the first place?


FG awards $5.8bn Mambilla power plant contract
Published August 30, 2017



http://punchng.com/fg-awards-5-8bn-mambilla-power-plant-contract/


I understand that Nigerians are seeing improved power supply while Igbos and PDP roupies are not. Very understandable, no worries.

5 Likes 2 Shares

Re: Nigerian Power Plants Coming On Stream In 2018 by nwaanambra1(m): 10:46pm On May 28, 2018
thesicilian:
Is there another 2018 coming after this?


my brother pls helep me ask themooo i am confusion! sorry transfusion! i mean transmission! no transfusion! sorry confusion! i mean! em! sorry! transmission! no! sory! angry

1 Like

Re: Nigerian Power Plants Coming On Stream In 2018 by buhariguy(m): 10:49pm On May 28, 2018
Let it come, to use it to laugh the evil idiotic pigs of Biafra party PDP.
Re: Nigerian Power Plants Coming On Stream In 2018 by AZeD1(m): 10:58pm On May 28, 2018
deomelo:
16 Years of PDP + $16 BILLION = 2050MW

3 Years of PMB + $5.792 BILLION 3,050MW Mambilla power project and many more.


The difference is clear.


Bros stop lying. The Mambilla project is not even 5% complete.

Nigeria has an installed capacity of 12500MW.

2 Likes 1 Share

Re: Nigerian Power Plants Coming On Stream In 2018 by CodeTemplar: 11:13pm On May 28, 2018
apriko:
Parasites....... The 3 major sites is in the south.

Nobody should quote me or else I will transmission something!!
Without taking sides, I think it will be more reasonable to use average power figure over the last year of the 16 years.
If you quote the figure at handover date it will be wrong because every nation experiences power failure and vandals loyal to one party can easily do that few days to handover.
Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 11:25pm On May 28, 2018
AZeD1:

Bros stop lying. The Mambilla project is not even 5% complete.

Nigeria has an installed capacity of 12500MW.



I don't remember saying it was completed or commissioned. Learn how to read and comprehend.
Re: Nigerian Power Plants Coming On Stream In 2018 by AZeD1(m): 12:11am On May 29, 2018
deomelo:




I don't remember saying it was completed or commissioned. Learn how to read and comprehend.


Omotosho 1 & 2
Papalanto
Geregu 1 & 2
Omoku
Afam V & Vi
Calabar
Alaodji
Egbema
Olorunsogo 1 & 2.

Those are some of the power stations built under PDP.

If you are going to credit the APC with a power station not 5% complete, be a MAN (an honest one) and list the power stations completed between 1999-2015.

3 Likes

Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 1:09am On May 29, 2018
AZeD1:

Omotosho 1 & 2
Papalanto
Geregu 1 & 2
Omoku
Afam V & Vi
Calabar
Alaodji
Egbema
Olorunsogo 1 & 2.

Those are some of the power stations built under PDP.

If you are going to credit the APC with a power station not 5% complete, be a MAN (an honest one) and list the power stations completed between 1999-2015.


Instead of listing power plants to fool people, why add them all together and list the total MW.

Again, I don't remember saying MaMbila is completed so stop repeating the same rubbish if you don't know how to read and comprehend.

I even posted a link stating that the contract for the project was awarded just last year and the expected completion date is 6 years from now.

I was trying to show how crooked, corrupt, thoughtless and incompetent OBJ and the PDP clowns were.

They spent $16 billion and end up with 2050MW, but the plan and design for 3050mw Mambila were on OBJ's table, on Jona's table too so why not spend $5 billion on 3050MW instead of spending $16 billion on 2050MW? Because multiple contracts means opportunity to loot all over the place.


Btw, with all the power plants you listed and after $16 billion and 16 years of PDP and Jona, they gave us nothing but darkness in return, so exactly what's your point?

1 Like

Re: Nigerian Power Plants Coming On Stream In 2018 by AZeD1(m): 2:22am On May 29, 2018
deomelo:



Instead of listing power plants to fool people, why add them all together and list the total MW.

Again, I don't remember saying MaMbila is completed so stop repeating the same rubbish if you don't know how to read and comprehend.

I even posted a link stating that the contract for the project was awarded just last year and the expected completion date is 6 years from now.

I was trying to show how crooked, corrupt, thoughtless and incompetent OBJ and the PDP clowns were.

They spent $16 billion and end up with 2050MW, but the plan and design for 3050mw Mambila were on OBJ's table, on Jona's table too so why not spend $5 billion on 3050MW instead of spending $16 billion on 2050MW? Because multiple contracts means opportunity to loot all over the place.


Btw, with all the power plants you listed and after $16 billion and 16 years of PDP and Jona, they gave us nothing but darkness in return, so exactly what's your point?


As at today, Nigeria has a total installed capacity of 12500MW. Saying the PDP spent $16Billion and ended up with 2050MW is a bloody lie because before 1999, Nigeria had an installed capacity of more than 2050MW.

Egbin built in 1984 1320MW
Kanji built in 1968 800MW
Jebba built in 1985 540MW
Shiroro built in 1990 600MW
Ughelli completed in 1990 900MW

Even before PDP came into power, Nigeria had more than 2050MW. As at 1999, none of them was working at full capacity and a lot of them are still not working at full capacity 3 years into Buhari's tenure.

As for the ones built by PDP between 1999 - 2015
Geregu 1 414MW 2007
Geregu 2 434MW 2012
Omotosho 1 338MW 2005
Omotosho 2 450MW 2012
Papalanto 335MW 2018
Alaoji 1074MW 2012
Olorunsogo 1 336MW 2007
Olorunsogo 2 675MW 2012

This is not the full the list, you do well to to find out about the NIPP project. The Niger Delta powe company (Buhari appointed a new head) has about 10 power stations alone.

Most of this stations are not operation because of Gas issues (OBJ's fault) but 3 years into Buhari's tenure, he still hasn't fixed the gas issues.

If you want to give empty praise, you can say for each year of PDP's rule, a power station was built, PMB has been here 3 years not one has been built.

You can be a praise singer for Buhari, that's your business but stop lying.

3 Likes 1 Share

Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 3:02am On May 29, 2018
[s]
AZeD1:

As at today, Nigeria has a total installed capacity of 12500MW. Saying the PDP spent $16Billion and ended up with 2050MW is a bloody lie because before 1999, Nigeria had an installed capacity of more than 2050MW.

Egbin built in 1984 1320MW
Kanji built in 1968 800MW
Jebba built in 1985 540MW
Shiroro built in 1990 600MW
Ughelli completed in 1990 900MW

Even before PDP came into power, Nigeria had more than 2050MW. As at 1999, none of them was working at full capacity and a lot of them are still not working at full capacity 3 years into Buhari's tenure.

As for the ones built by PDP between 1999 - 2015
Geregu 1 414MW 2007
Geregu 2 434MW 2012
Omotosho 1 338MW 2005
Omotosho 2 450MW 2012
Papalanto 335MW 2018
Alaoji 1074MW 2012
Olorunsogo 1 336MW 2007
Olorunsogo 2 675MW 2012

This is not the full the list, you do well to to find out about the NIPP project. The Niger Delta powe company (Buhari appointed a new head) has about 10 power stations alone.[/s]



Irrelevant, PDP and their 16 years gave us 2050MW and darkness.



Most of this stations are not operation because of Gas issues (OBJ's fault) but 3 years into Buhari's tenure, he still hasn't fixed the gas issues.

You mean PMB should have fixed in less than 3 years the gas problem worthless and corrupt PDP didn't fix in 16 years even though they presided over the largest earnings in the history of Nigeria.

Shouldn't the worthless PDP have fixed it in the first place?

You are either clueless or just not smart at all.

If you want to give empty praise, you can say for each year of PDP's rule, a power station was built, PMB has been here 3 years not one has been built.

PDP spent $16 billion and 16 years on 2050MW

PMB is spending $5 billion on 3050 Mambila and to be ready in less than 6 years.

So, explain the difference between $16 billion/16 years on 2050MW Vs $5 billion on 3050MW and 6 years.

Useless PDP, OBJ and incompetent Jona should have spent 5 billion on 3050 Mambila and the plan and design were on their table, it's been on the drawing board for over 30 years.

In 2018 alone, we are getting over 1.000MW and on top of that, 450MW Geregu2, plus tons of transmission projects, all in less than 3 years.

You can be a praise singer for Buhari, that's your business but stop lying.


Thank God I'm a praise singer for PMB and not some crooked and corrupt clowns that saddled us with darkness in return for $16 billion and wasted 16 years.


And you wonder why Nigerians kicked them out...

1 Like

Re: Nigerian Power Plants Coming On Stream In 2018 by AZeD1(m): 5:38am On May 29, 2018
deomelo:
[s]



Irrelevant, PDP and their 16 years gave us 2050MW and darkness.





You mean PMB should have fixed in less than 3 years the gas problem worthless and corrupt PDP didn't fix in 16 years even though they presided over the largest earnings in the history of Nigeria.

Shouldn't the worthless PDP have fixed it in the first place?

You are either clueless or just not smart at all.



PDP spent $16 billion and 16 years on 2050MW

PMB is spending $5 billion on 3050 Mambila and to be ready in less than 6 years.

So, explain the difference between $16 billion/16 years on 2050MW Vs $5 billion on 3050MW and 6 years.

Useless PDP, OBJ and incompetent Jona should have spent 5 billion on 3050 Mambila and the plan and design were on their table, it's been on the drawing board for over 30 years.

In 2018 alone, we are getting over 1.000MW and on top of that, 450MW Geregu2, plus tons of transmission projects, all in less than 3 years.




Thank God I'm a praise singer for PMB and not some crooked and corrupt clowns that saddled us with darkness in return for $16 billion and wasted 16 years.


And you wonder why Nigerians kicked them out...





Stop lying, even Buhari himself knows you are lying. See the figures stated by Buhari in 2015 and see your figures and tell us who is lying.


Nigeria’s former military leader Muhammadu Buhari has blamed the ruling People’s Democratic Party (PDP) for the country’s continuing power problems and claimed that there is less electricity now than there was at the end of military rule in 1999.

In a speech announcing his decision to run as an opposition candidate in the country’s February 2015 elections, the retired general said: “When PDP came to power in 1999 Nigeria was generating about 4,000 MW of electricity. After 15 years and $20 billion spent we are generating between 3,000 and 4,000 MW.”

The ruling party responded with a sharp rebuttal, stating that “as at May 29 1999, when PDP took office, Nigeria was generating 1,600 MW”, but that today the country generates “4,568 MW of electricity”.

1 Like

Re: Nigerian Power Plants Coming On Stream In 2018 by amaechi1: 6:34am On May 29, 2018
Omololu007:
the mambilla power project was started during the tenure of shagari(not so sure), I don't think it has been completed sef.

And power situation keeps on getting worst where my two house are located
You may consider relocating. The facts about Manbila are there, this administration has done well to remove both the political and legal bottle neck around the progress of the project.
Re: Nigerian Power Plants Coming On Stream In 2018 by Clentuzbaba(m): 7:38am On May 29, 2018
I think d ministry shd deal wt d 2000mgwt rejected load first or at least along side. If we can't distribute our generated load now, wat do we intend to do wt d additional loads to b generated?
Re: Nigerian Power Plants Coming On Stream In 2018 by hakimi1974(m): 7:43am On May 29, 2018
AZeD1:

Stop lying, even Buhari himself knows you are lying. See the figures stated by Buhari in 2015 and see your figures and tell us who is lying.


Nigeria’s former military leader Muhammadu Buhari has blamed the ruling People’s Democratic Party (PDP) for the country’s continuing power problems and claimed that there is less electricity now than there was at the end of military rule in 1999.

In a speech announcing his decision to run as an opposition candidate in the country’s February 2015 elections, the retired general said: “When PDP came to power in 1999 Nigeria was generating about 4,000 MW of electricity. After 15 years and $20 billion spent we are generating between 3,000 and 4,000 MW.”

The ruling party responded with a sharp rebuttal, stating that “as at May 29 1999, when PDP took office, Nigeria was generating 1,600 MW”, but that today the country generates “4,568 MW of electricity”.
and how many times p.d.p governments, commision papalanto and geregu.
Re: Nigerian Power Plants Coming On Stream In 2018 by Omololu007(m): 12:40pm On May 29, 2018
amaechi1:

You may consider relocating. The facts about Manbila are there, this administration has done well to remove both the political and legal bottle neck around the progress of the project.
you want me to turn from being a landlord in ikorodu and lekki,to now be a Tennant abi?
Re: Nigerian Power Plants Coming On Stream In 2018 by Omololu007(m): 12:44pm On May 29, 2018
deomelo:







I understand that Nigerians are seeing improved power supply while Igbos and PDP roupies are not. Very understandable, no worries.

Why are most of you guys on nairaland this way sef

Power has become worst at my house in lekki and ikorodu,the only thing you can say is only Igbos and PDP roupies are saying power situation is getting worst,guy I don't think you are okay at all.

I was one of the people that voted this man into power,all he knows how to do is to give excuses. with guys like you, Nigeria will never develop

1 Like

Re: Nigerian Power Plants Coming On Stream In 2018 by omowolewa: 12:49pm On May 29, 2018
Fear God
deomelo:
16 Years of PDP + $16 BILLION = 2050MW

3 Years of PMB + $5.792 BILLION 3,050MW Mambilla power project and many more.


The difference is clear.







Those projects were started by PDP, except for Mambila and kudos to PMB for that

1 Like

Re: Nigerian Power Plants Coming On Stream In 2018 by anibirelawal(m): 2:23pm On May 29, 2018
PMB is working.
Re: Nigerian Power Plants Coming On Stream In 2018 by anibirelawal(m): 2:25pm On May 29, 2018
deomelo:
16 Years of PDP + $16 BILLION = 2050MW

3 Years of PMB + $5.792 BILLION 3,050MW Mambilla power project and many more.


The difference is clear.







Imagine PMB spending just $5.8 billion on 3050MW in the spate of 3 years.
Just imagine if it was PMB handling and in control of such huge amount of $16 billion as at then, can you possibly imagine what will be of our power generation by now.

Our past governments are bunch of squanderers.


God bless PMB!

2 Likes 1 Share

Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 2:35pm On May 29, 2018
omowolewa:
Fear God


Those projects were started by PDP, except for Mambila and kudos to PMB for that



What's my business with useless PDP projects that gave us nothing but continued darkness?

I was talking about Mambila.


Learn how to read and comprehend.
Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 2:39pm On May 29, 2018
anibirelawal:



Imagine PMB spending just $5.8 billion on 3050MW in the spate of 3 years, just imagine if it was PMB handling such huge amount of $16 billion as at then, can you possibly imagine what will be of our power generation by now.


If PMB was in charge, we definitely won't have darkness today.

Just imagine, $16 billion for 2050MW instead of $5 billion for 3050MW



OBJ and his PDP looting gangs are nothing but crooks, they practically set us up to fail.
Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 2:42pm On May 29, 2018
Power supply: Fashola to commission new giant transformers in Kaduna




The Minister of Works, Power and Housing, Mr Babatunde Raji Fashola is set to commission two installed Mega Volt-Amps (MVA) and Kilovolt Amps (KVA) giant transformers as part of the government efforts in addressing power outage in the country in Kaduna next month (June).
This was disclosed by the Managing Director, Transmission Company of Nigeria (TCN), Usman Muhammad Gur after the inspection of the power projects in Kaduna on Sunday..

He said the transformer installation project was parts of efforts to quit redundancy in the power transmission, assuring, that, the textile industry in Kaduna, which became moribund due to the inadequate power supply will soon bounce back.


In fact, a Chinese company that produces electrode will soon come to Nigeria, because we have assured them of constant power. Not only that, all the companies that ran to Ghana and other African countries will soon prefer to do business in Nigeria.”


http://www.tribuneonlineng.com/power-supply-fashola-to-commission-new-giant-transformers-in-kaduna/
Re: Nigerian Power Plants Coming On Stream In 2018 by anibirelawal(m): 2:42pm On May 29, 2018
deomelo:



If PMB was in charge, we definitely won't have darkness today.

Just imagine, $16 billion for 2050MW instead of $5 billion for 3050MW



OBJ and his PDP looting gangs are nothing but crooks, they practically set us up to fail.


And not to think of how valuable money was then.
Re: Nigerian Power Plants Coming On Stream In 2018 by deomelo: 2:59pm On May 29, 2018
anibirelawal:



And not to think of how valuable money was then.



Probably cost us about half of the $5 billion cost because I'm sure construction cost increased over the years.

The sad part is the fact that the plan was right there in front of them, they just ignored.

(1) (Reply)

BREAKING: Fulani Herdsmen Kills Two Soldiers In Benue, Mutilate Sex Organs / Osun: 3,439 Delegates Pick PDP Candidate Saturday / Buhari To Grant Presidential Pardon To Ambrose Ali

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 71
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.