Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,688 members, 7,999,959 topics. Date: Monday, 11 November 2024 at 05:38 PM |
Nairaland Forum / Nairaland / General / Travel / Egina FPSO Sails To Offshore Field (20247 Views)
With Flights Banned, Son Sails Solo Across Atlantic To Reach Father, 90 / The Battle-Field Called “Lagos Traffic” / World's Largest Plane With A Wingspan Longer Than A FOOTBALL FIELD(Pic) (2) (3) (4)
(1) (2) (3) (4) (5) (Reply) (Go Down)
Egina FPSO Sails To Offshore Field by Butterflyleo: 11:05pm On Aug 26, 2018 |
The $3.3 billion Floating Production Storage Offloading (FPSO) unit built by Samsung Heavy Industries of Korea (SHI) for the 200,000 barrels per day capacity Egina oilfield began to sail to the oilfield Sunday.. https://www.premiumtimesng.com/business/business-news/281388-finally-egina-fpso-sails-to-offshore-field.html YET, ANOTHER LAUDABLE ACHIEVEMENT Finally, Egina FPSO sails to offshore field: The $3.3 billion Floating Production Storage Offloading (FPSO) unit built by Samsung Heavy Industries of Korea (SHI) for the 200,000 barrels per day capacity Egina oilfield began to sail to the oilfield. Please, do note that, Egina FPSO is the only one of its kind in Africa and one of the world's largest. God Bless All Buharists. God Bless President Mohammadu Buhari. God Bless The Federal Republic of Nigeria. Buhari Is The Best Thing That Has Happened To Nigeria And Nigerians After Independence. PMB till 2023 CARRY GOOOO!!!! PMB keeps making us proud. 23 Likes 3 Shares
|
Re: Egina FPSO Sails To Offshore Field by Kyase(m): 11:11pm On Aug 26, 2018 |
Sai baba 10 Likes 1 Share |
Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:16pm On Aug 26, 2018 |
how is this a PMB achievement? you are demarketing your paymaster with this kind of post, because a simple google search would burst your bubble and actually start making people focus on the initiator of the project. I hope BMC don't end up denting buhari's campaign by mistakenly bringing out more of PDP's achievements. Now you guys look ridiculous accusing PDP 16years as a waste, and you are only bringing out PDP projects that the completion date was already fixed for now https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria 123 Likes 7 Shares
|
Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:18pm On Aug 26, 2018 |
Lol ..Egina FPSO has nothing to do with Buhari 103 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by amaniro: 11:18pm On Aug 26, 2018 |
PDP supporters right now 21 Likes 6 Shares
|
Re: Egina FPSO Sails To Offshore Field by Ndonu101: 11:22pm On Aug 26, 2018 |
meanwhile in another news truck load of citizens are being buried in Benue their only crime is that they are farmers! 46 Likes 5 Shares
|
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:24pm On Aug 26, 2018 |
iammo: Where and when did PDP initiate this? Abi is your head paining you? 6 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by Sharpshooota: 11:26pm On Aug 26, 2018 |
Expect news like this daily as elections draws near.... Propaganda government at work They have nothing to offer... They all forged certificates to deceive the gullible zombies 63 Likes 5 Shares
|
Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:27pm On Aug 26, 2018 |
Egina FPSO was ordered during the govt of Good luck Jonathan when Buhari was still wearing adult diapers and sipping kunu in Daura . Does Buhari even know the meaning of FPSO. 69 Likes 1 Share
|
Re: Egina FPSO Sails To Offshore Field by DeBrain045(m): 11:28pm On Aug 26, 2018 |
I keep saying it buhari is a rain no umbrella can shield from 2019 Buhari will surely win 6 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by DeBrain045(m): 11:30pm On Aug 26, 2018 |
Wailers come and wail you where meant to do it. If the broom of change sweep corruptions no umbrella can cover it 2 Likes 1 Share |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:30pm On Aug 26, 2018 |
SarkinYarki: Wrong! This is a partnership with NNPC, CNOOC, Petrobras, Sapetro and Total (24%) Wailers and lies 6 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:31pm On Aug 26, 2018 |
Butterflyleo: Ode!, its a JV between total and NNPC, discovered and started way back 2003, here is the link on total website ; https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria how can you claim to be promoting Mr integrity, with cheap lies HOW?!!! 49 Likes 2 Shares
|
Re: Egina FPSO Sails To Offshore Field by Dannyset(m): 11:31pm On Aug 26, 2018 |
Some people be making mockery of themselves by saying this is PDP initiative. How that sound to their hearing baffles me. 8 Likes 1 Share |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:34pm On Aug 26, 2018 |
iammo: The oil field was discovered in 2003 called egina but not the construction of the egina floating construction storage. Get your facts right. This thread is not about the oil field. Ode! Besides another wailer like you is claiming it is 100% owned by total while you just confirmed my position that NNPC is a partner. So is your fellow wailer lying 12 Likes 4 Shares |
Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:35pm On Aug 26, 2018 |
Butterflyleo: Buhari has nothing to do with Egina. 25 Likes 1 Share |
Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:36pm On Aug 26, 2018 |
Butterflyleo:Is your eyes paining you? Let me post the link for you again now make sure you read it slowly, before further embarrassing your paymaster by scoring own goal https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria 25 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:39pm On Aug 26, 2018 |
iammo: The link is open right here. You wish this was so PDP but alas you fail. Drilling of the oil field began In 2014 and drilling continued through 2015 and your buffoon was removed in 2015 even before they could ascertain the volume of oil reserves available in the newly discovered oil field. It was after they were able to determine this that they know were able to decide on the capacity this floating storage would have. PDP SHAME!!! 10 Likes 3 Shares |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:41pm On Aug 26, 2018 |
SarkinYarki: Who is the minister for petroleum again? Who is in charge of NNPC which is a partner? Your mumu never do? Your wailing never do? Your lies never do? 5 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:45pm On Aug 26, 2018 |
Butterflyleo: EGINA FPSO has been in the works for almost a decade and it's 2018 field integration docking has been on schedule for 7 years .. ( ask any one who works in Total upstream)... 30 Likes |
Re: Egina FPSO Sails To Offshore Field by deomelo: 11:47pm On Aug 26, 2018 |
#SAIBABA2019 1 Like |
Re: Egina FPSO Sails To Offshore Field by Sirjamo: 11:49pm On Aug 26, 2018 |
SarkinYarki:But Boko haram and killer herdsmen have everything to do with Buhari abi ? When it is a good thing, it is some one else when it's bad, it's Buhari, you all are useless hypocrites 11 Likes 1 Share |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:50pm On Aug 26, 2018 |
SarkinYarki: Shut your trap. Nexans was subcontracted by Samsung Heavy Industries (SHI) to deliver cables for the Egina FPSO project. MTE was contracted by SHI to deliver design, engineering, fabrication services and additional heat shields for the Egina FPSO, in February 2016. From the OP The $3.3 billion Floating Production Storage Offloading (FPSO) unit built by Samsung Heavy Industries of Korea (SHI) 2 Likes |
Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:52pm On Aug 26, 2018 |
Butterflyleo: Samsung Heavy Industries was awarded the contract to build Egina FPSO in 2013 under the Jonathan govt ...so again Buhari has no hand in this 19 Likes |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:52pm On Aug 26, 2018 |
SarkinYarki: Shut up and look above your post 4 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:53pm On Aug 26, 2018 |
Butterflyleo: You clearly know nothing about how long designing an FPSO takes .. 18 Likes |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:54pm On Aug 26, 2018 |
SarkinYarki: Again I say shut your mouth you liar. The contract was given to SHI in 2016. and not your 2013 under your imaginary GEJ you liar 3 Likes 2 Shares |
Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:58pm On Aug 26, 2018 |
Butterflyleo: So in your very small mind, discovery was made 2003, OML was given prior to 2014, and drilling started December 2014 with spcific production date of 2018, and you believe buhari who doesn't even know a thing on the terms reached on the joint venture agreement miraculous is responsible for the building and purchase of a FSPO that had been contracted years prior to now? 13 Likes 1 Share |
Re: Egina FPSO Sails To Offshore Field by spartan117(m): 11:59pm On Aug 26, 2018 |
BMC thread 23 Likes 3 Shares
|
Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 12:00am On Aug 27, 2018 |
Butterflyleo: The contract was awarded in 2013 ..there is nothing to dispute there 7 Likes |
Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 12:01am On Aug 27, 2018 |
iammo: I will keep exposing your lies. Samsung Heavy Industries (SHI) received a turnkey contract from Total for the Egina FPSO. The scope of the contract includes design, procurement, construction, delivery and trial operations. 3 Likes |
Re: Egina FPSO Sails To Offshore Field by MakeNigeriaGrea: 12:01am On Aug 27, 2018 |
Butterflyleo:Your head is really paining you. Nigerians are wiser now. #PVCAgainstPMB. 15 Likes 1 Share |
Okada Rider And Passenger Crushed To Death By Truck In Ibadan. Photos / PHOTOS: Trailer Falls In Ajegunle, Lagos / Nigerian Man Survives Gas Explosion In Malaysia (Photos)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 46 |