Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,208,896 members, 8,004,239 topics. Date: Saturday, 16 November 2024 at 11:46 AM

Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic (4004 Views)

Makinde Flags Off Dualization Of 8.6km Project, Names Road After Wike / 100 Days: Adeleke Commissions Second Phase Of Dualization Of Osogbo-ila-odo Road / Umahi Inspects Dualization Of Abakaliki/Enugu Road (Photos) (2) (3) (4)

(1) (2) (Reply) (Go Down)

Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 3:39am On Oct 25, 2018





grin grin grin grin grin

7 Likes 4 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by richidinho(m): 3:57am On Oct 25, 2018
just this with over 19trillion borrowed?
Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by Atouke: 4:10am On Oct 25, 2018
Another Goodluck jonathan project claimed by APC.

1 Like 1 Share

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 4:12am On Oct 25, 2018
richidinho:
just this with over 19trillion borrowed?




Yes oooooooo. We are commissioning wonderful projects in less than 3 years. At least Nigerians can see what we are doing with their money.

Your PDP looting, stealing and incompetent uncles gave us ZERO completed road in exchange for $400 billion and 26 years of nothing.

These bitter, angry, hateful and frustrated ipob villagers and anti Nigerian elements sef

17 Likes 6 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 4:17am On Oct 25, 2018
[s]
Atouke:
Another Goodluck jonathan project claimed by APC.
[/s]


Didn't take too long for the usual ignorant, unintelligent and mentally corrupt ipob nonsense to pollute the atmosphere..

Make yourself useful by posting 1 project 16 years jona and the PDP completed

14 Likes 6 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by richidinho(m): 4:23am On Oct 25, 2018
deomelo:




Yes oooooooo. We are commissioning wonderful projects in less than 3 years. At least Nigerians can see what we are doing with their money.

Your PDP looting, stealing and incompetent uncles gave us ZERO completed road in exchange for $400 billion and 26 years of nothing.

These bitter, angry, hateful and frustrated ipob villagers and anti Nigerian elements sef



sorry too late!

with AtikuObi Nigeria will be great again

5 Likes 2 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 4:38am On Oct 25, 2018
[s]
richidinho:


sorry too late!

with AtikuObi Nigeria will be great again
[/s]


Nuisance ipob rant.

11 Likes 6 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by richidinho(m): 4:54am On Oct 25, 2018
deomelo:
[s][/s]

Nuisance ipob rant.
lol #backToDaura is a national project

3 Likes 1 Share

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by Nbote(m): 5:14am On Oct 25, 2018
U ppl can kip lying to urselves but d internet will kip exposing U lots... Here's d same project from Setraco's website as at 2012. D same flyover. D same section II d OP is claiming has been completed and commissioned under 3yrs..
http://www.setraco.net/project_det.php?id=66

Is dat d road or not? I know U lots like to shift goalposts and feign ignorance wen presented with facts...

2 Likes 2 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 5:30am On Oct 25, 2018
Nbote:
U ppl can kip lying to urselves but d internet will kip exposing U lots... Here's d same project from Setraco's website...
http://www.setraco.net/project_det.php?id=66

7 Likes 3 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by seanfer(m): 5:42am On Oct 25, 2018
I think this project was started by OBJ and the 2 other administrations after him allocated funds for the project but didn’t mobilize the contractor to site....

1 Like

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by Nbote(m): 5:50am On Oct 25, 2018
deomelo:






Dat flyover and section II of d Kano Maiduguri was completed since... Show us photos Section III : (Azare – Potiskum Road) which is d part dis govt is working on.. I gave a link which U refused to open but here is a screenshot of d flyover from d link which was uploaded by d construction company on its website as at 2012, same flyover u claimed was jus completed and commissioned. I won't b surprised if U claim it doesn't look familiar simply becos it was shot from anoda angle.

1 Share

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by jayson87: 6:15am On Oct 25, 2018
Deomelo at it again.

Fashola's errand boy his here again, celebrating the failed government and failed minister

1 Like 1 Share

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 6:20am On Oct 25, 2018
Nbote:


Dat flyover and section II of d Kano Maiduguri was completed since... Show us photos Section III : (Azare – Potiskum Road) which is d part dis govt is working on

Before we go to section 3 which is under construction, show us the section 2 the PDP or Jona completed and commissioned.


Common sense didn't tell you that we are completing all the projects your looting and stealing PDP uncles and jona abandoned all over the country?

The contract was awarded in 2006, 12 years ago, but as-as usual with looting and stealing PDP, they looted the funds and abandoned the project, but PMB finished the projects in less than 3 years so why is this shameless joker shining teeth..

12 Likes 4 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by mercenary: 6:39am On Oct 25, 2018
deomelo:




Yes oooooooo. We are commissioning wonderful projects in less than 3 years. At least Nigerians can see what we are doing with their money.

Your PDP looting, stealing and incompetent uncles gave us ZERO completed road in exchange for $400 billion and 26 years of nothing.

These bitter, angry, hateful and frustrated ipob villagers and anti Nigerian elements sef


Gullible zombies of a lifeless incompetent senile dullard claiming project I was a part of in the last administration
Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 6:46am On Oct 25, 2018
[s]
mercenary:
Gullible zombies of a lifeless incompetent senile dullard making claiming project I was a part of in the last administration
[/s]



Stop suffocating me with your akpu breath.


You ipob losers cannot show us 1 single project your looting and stealing PDP uncles started and completed after 16 in office and $400 billion oil earnings, all you do is jump all over the place like bingo with your ignorant and unintelligent rants

13 Likes 4 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by princdebola201(m): 6:59am On Oct 25, 2018
Sai baba

3 Likes 2 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by quickberry(m): 7:03am On Oct 25, 2018
richidinho:
just this with over 19trillion borrowed?

2 Likes

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by quickberry(m): 7:06am On Oct 25, 2018
God bless our able president

#PMB X2

6 Likes 1 Share

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by Nbote(m): 7:20am On Oct 25, 2018
deomelo:


Before we go to section 3 which is under construction, show us the section 2 the PDP or Jona completed and commissioned.


Common sense didn't tell you that we are completing all the projects your looting and stealing PDP uncles and jona abandoned all over the country?

The contract was awarded in 2006, 12 years ago, but as-as usual with looting and stealing PDP, they looted the funds and abandoned the project, but PMB finished the projects in less than 3 years so why is this shameless joker shining teeth..








I jus showed u a link to d website of d contractor showing dis same bridge U claim was jus completed and commissioned. Dat link was as at 2012. U can kip fooling urselves and shifting goal posts wen presented with facts
Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by obailala(m): 7:32am On Oct 25, 2018
Nbote:


I jus showed u a link to d website of d contractor showing dis same bridge U claim was jus completed and commissioned. Dat link was as at 2012. U can kip fooling urselves and shifting goal posts wen presented with facts
Interesting arguments going on on this thread; if only we can keep insults away... You know there's no single major road in Nigeria whose contract has not been awarded in the past; Onitsha Enugu, PH Enugu, East West road, Benin Lagos, Lokoja Abuja, Abuja Kaduna, Kaduna Kano etc etc. Contracts to fix these roads have been awarded by every single administration since IBB till date.

So with that in mind, any Nigerian already knows that just awarding a contract means absolutely nothing. Can you provide any evidence whatsoever to prove that any actual work of significance was done on these roads under those 2006 and 2012 contract awards?

11 Likes 4 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by buhariguy(m): 7:44am On Oct 25, 2018
richidinho:
just this with over 19trillion borrowed?

also 69 projects in SE alone.
But Pdp received $1.1tr in 16yrs and borrowed 11tr naira without a single project.

5 Likes 3 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by obailala(m): 7:47am On Oct 25, 2018
buhariguy:
also 69 projects in SE alone.
But Pdp received $1.1tr in 16yrs and borrowed 11tr naira without a single project.
In Nigeria, number of projects awarded truly means nothing. What matters is the number of projects executed.

5 Likes 2 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 7:55am On Oct 25, 2018
Nbote:


I jus showed u a link to d website of d contractor showing dis same bridge U claim was jus completed and commissioned. Dat link was as at 2012. U can kip fooling urselves and shifting goal posts wen presented with facts





Published 7 months ago on March 15, 2018


The dualisation of Section 1 of the Kano-Maiduguri Road, a 101km stretch, situated in Kano and Kastina states in the Northwest has reached 55 per cent completion 12 years after it was awarded to the contractor.
This was disclosed to a National Media Team put together at the instance of the Ministry of Power, Works and Housing when the team visited the project to access the performance so far. On why it took so long for work on the project to reach the current stage, the Project Manager, Engr Roy Hungushi said,”the major challenge that had slowed down the pace of work and even led to stoppage in the past was lack of funds,” adding that the security challenge experienced in the area back then also contributed. “But we thank God now for the initiative of Mr President. Since the introduction of the SUKUK funding we have been getting paid and that is why you can see that work is seriously going on at various points,” Engr Hungushi said.

https://leadership.ng/2018/03/15/kano-maiduguri-road-dualisation-attains-55-completion/

1. The thread says completed flyover bridge with a picture to go with it, show us the picture of the same completed flyover completed and commission in 2012.

2. The contract was awarded in 2006 and was promptly abandoned by the PDP and Jona, but it's currently at 55%, so where did you get completion in 2012 from, from the date the contractor built a new website?

Again, show us the picture of your completed flyover that was completed in 2012.

I just don't know why it's so painful when we embarrass you people with pictures of the completed projects tour PDP uncles abandoned

7 Likes 3 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 8:02am On Oct 25, 2018
obailala:
Interesting arguments going on on this thread; if only we can keep insults away... You know there's no single major road in Nigeria whose contract has not been awarded in the past; Onitsha Enugu, PH Enugu, East West road, Benin Lagos, Lokoja Abuja, Abuja Kaduna, Kaduna Kano etc etc. Contracts to fix these roads have been awarded by every single administration since IBB till date.

So with that in mind, any Nigerian already knows that just awarding a contract means absolutely nothing. Can you provide any evidence whatsoever to prove that any actual work of significance was done on these roads under those 2006 and 2012 contract awards?



I've asked the same question several times, but he's still dodging and dancing around with the same meaningless ramblings about the contractor's website copyright notice in 2012.

Very low-quality argument on his part.

7 Likes 3 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by rusher14: 8:02am On Oct 25, 2018
Mynd44 why the reluctance to advance such threads to front page?

2 Likes

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by deomelo: 8:09am On Oct 25, 2018
obailala:
Interesting arguments going on on this thread; if only we can keep insults away... You know there's no single major road in Nigeria whose contract has not been awarded in the past; Onitsha Enugu, PH Enugu, East West road, Benin Lagos, Lokoja Abuja, Abuja Kaduna, Kaduna Kano etc etc. Contracts to fix these roads have been awarded by every single administration since IBB till date.

So with that in mind, any Nigerian already knows that just awarding a contract means absolutely nothing. Can you provide any evidence whatsoever to prove that any actual work of significance was done on these roads under those 2006 and 2012 contract awards?


I've asked the same question several times, but he's still dodging and dancing around with the same meaningless ramblings about when the contractor's website copyrigt notice in 2012.

Very low qualityn argument on his part.

4 Likes 2 Shares

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by Nobody: 8:09am On Oct 25, 2018
Niger Delta oil money at work. Chai, which way Niger Delta people? Do you have such flyover in your region? SMH. Let me catch any afonja that will reply me and ask me to hold our leaders, you will regret your life this morning.
Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by wristbangle: 8:11am On Oct 25, 2018
Kudos to this adminstration on the completion of this project.

If I could remember, this project has been awarded decades ago with little or no execution.

5 Likes 1 Share

Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by Nbote(m): 8:11am On Oct 25, 2018
obailala:
Interesting arguments going on on this thread; if only we can keep insults away... You know there's no single major road in Nigeria whose contract has not been awarded in the past; Onitsha Enugu, PH Enugu, East West road, Benin Lagos, Lokoja Abuja, Abuja Kaduna, Kaduna Kano etc etc. Contracts to fix these roads have been awarded by every single administration since IBB till date.

So with that in mind, any Nigerian already knows that just awarding a contract means absolutely nothing. Can you provide any evidence whatsoever to prove that any actual work of significance was done on these roads under those 2006 and 2012 contract awards?

D link I provided was to Setraco's website as at 2012... A photo of dat flyover and d dualized road was uploaded on dat site as at 2012.
Here's d same project from Setraco's website...
http://www.setraco.net/project_det.php?id=66

D OP claimed dey are already commissioning projects under 3 yrs and showed dat photo. D section II of Kano Maiduguri which is d one d OP is talking about has long being completed which is why dis govt continued with d section III (Azare - Potiskum) in 2016.
Re: Completed Shuwarin Flyover Injigawa State Dualization Of Kano-maiduguri Road.pic by princdebola201(m): 8:12am On Oct 25, 2018
sai baba another one

3 Likes 2 Shares

(1) (2) (Reply)

Quavo Quavo Huncho (album Download.) Full / Is Senator Shehu Sani A Prophet? See His Throwback Tweet / Why Gov. Ifeanyi Okowa Crippled Nyesom Wike.

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 48
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.