Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,205,035 members, 7,990,882 topics. Date: Friday, 01 November 2024 at 06:58 AM

The Making Of The "Anambra 5 Bedroom Duplex" - Properties (8) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Making Of The "Anambra 5 Bedroom Duplex" (63600 Views)

The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra / The Making Of The "Akure 5 Bedroom Duplex" / The Making Of The Enugu 6 Bedroom Duplex (2) (3) (4)

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (15) (Reply) (Go Down)

Re: The Making Of The "Anambra 5 Bedroom Duplex" by tivta(m): 8:07am On Dec 05, 2018
spyder880:
Reinforcements.........

How come you don't use the pre manufactured decking planks? The ones with branding on them.
Re: The Making Of The "Anambra 5 Bedroom Duplex" by ceelog(m): 2:33pm On Dec 05, 2018
spyder880:


The quantities of materials we bought on Monday for this very house are;

20mm pipes 7 bundles
25mm pipes 1 bundle
20mm couplers 2 pkts
25mm couplers 20 pics
Male bush 2 pkts
4 ways plastic box 2 pkts
3x3 knockout boxes 50
3x6 knockout boxes 55
U box 1 pkt
Y box 1 pkt
Gum 2 tins
Cooker box 1
Bending spring 2


But the actual materials your own house will need will be determined by your electrical drawing, and size of the building. It could be more or less than these quantities here. Thanks.

Spyder as always. Thanks a lot.
I know it won't be same. Mine is a 4bd dup so I go use this one arm myself make the guy do him estimate

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 6:13pm On Dec 05, 2018
bixton:


Is that a double matting on the entire slab?
What could be the reason for such?

The double matting is only on a portion of the decking which has a very wide span. The area is also planned to have internal walls as additional loads in some of the space.
I also ensured I separated the top and bottom layers with a separator.

4 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by bixton(m): 7:34pm On Dec 05, 2018
spyder880:


The double matting is only on a portion of the decking which has a very wide span. The area is also planned to have internal walls as additional loads in some of the space.
I also ensured I separated the top and bottom layers with a separator.

Nice horse bench as separator.
It can also be used in place of the baked biscuit.
Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 8:47pm On Dec 05, 2018
bixton:


Nice horse bench as separator.
It can also be used in place of the baked biscuit.

Exactly bro, it's the horse bench. You're a real professional. Welcome.

3 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by bixton(m): 8:52pm On Dec 05, 2018
spyder880:


Exactly bro, it's the horse bench. You're a real professional. Welcome.

Na you be the professional oooo. We will all be like you.
Kudos to your works.
Thanks.

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 8:54pm On Dec 05, 2018
More of this decking mat.......

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 8:58pm On Dec 05, 2018
Now, the decking biscuits, baked to act as lift for the mat to protect our electrical pipes underneath .

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 9:05pm On Dec 05, 2018
Already framing the back.......

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 1:07pm On Dec 07, 2018
Concluding works on carpentry, electrical and plumbing works for this site. Decking cast starts anytime from now.

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by KOMBE: 9:45pm On Dec 08, 2018
spyder880:
From the top.....

Our walls here are 10 block courses high, plus the lintels, then another two blocks on top, before we do the decking beam. Enough headroom in this house.

I have seen a situation where the rods in the column concrete casting extends 5inch out of the German floor. Please how do you remedy such a situation considering that the minimum length is 1 foot. Won't it be difficult to tie in the rod for the block wall casting.
Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 9:52pm On Dec 08, 2018
KOMBE:


I have seen a situation where the rods in the column concrete casting extends 5inch out of the German floor. Please how do you remedy such a situation considering that the minimum length is 1 foot. Won't it be difficult to tie in the rod for the block wall casting.

Lap length of rods is supposed to be at least 1 meter. If only 5 inches show, maybe you insert rods to lap on the short rods before the next continuous reinforcement.

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by KOMBE: 9:55pm On Dec 08, 2018
spyder880:


Lap length of rods is supposed to be at least 1 meter. If only 5 inches show, maybe you insert rods to lap on the short rods before the next continuous reinforcement.


thanks
Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 10:08pm On Dec 08, 2018
We have provided electrical lighting boxes in walls.

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 10:12pm On Dec 08, 2018
Preparation for decking cast, wooden steps......

1 Share

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 10:17pm On Dec 08, 2018
Stairs. .....

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 10:19pm On Dec 08, 2018
Cast thickness is as specified, 150mm.

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 7:31am On Dec 11, 2018
Completed decking cast in pictures. ......

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 7:34am On Dec 11, 2018
Preparing to start the first floor block walls, we have started bringing in materials and work will start later this week.

3 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by Phildecasa(m): 11:19am On Dec 11, 2018
Well done sir cool

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by kingjosephat(m): 6:26pm On Dec 11, 2018
Well done
Keep it going

1 Like 1 Share

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 6:24am On Dec 12, 2018
Phildecasa:
Well done sir cool
kingjosephat:
Well done
Keep it going

Thank you my people, work will start here soonest.

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by diehard(m): 12:55pm On Dec 12, 2018
spyder880:



Thank you my people, work will start here soonest.

Do you wait for 3 weeks for the concrete to completely cure before continuing work on a decking
Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 2:27pm On Dec 12, 2018
diehard:


Do you wait for 3 weeks for the concrete to completely cure before continuing work on a decking

No. We can commence work in 3 days after the cast, provided we don't remove the supports under the decking.

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 3:22pm On Dec 12, 2018
We are right now pumping water on top of this drying decking, this is to help the curing process. More water is expected to be sprayed on the deck tomorrow.

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 10:05pm On Dec 14, 2018
Frontal decking wood removed. ........

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 10:12pm On Dec 14, 2018
Lifting the blocks to the deck.......

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 10:16pm On Dec 14, 2018
Work will start soon.

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 6:42am On Dec 16, 2018
After getting enough quantities of blocks up, forming walls starts in this site by tomorrow.

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 7:47pm On Dec 18, 2018
Forming the walls of the first floor........

1 Like

Re: The Making Of The "Anambra 5 Bedroom Duplex" by spyder880(m): 7:50pm On Dec 18, 2018
Powering upwards. .......

2 Likes

Re: The Making Of The "Anambra 5 Bedroom Duplex" by maiunguwar: 8:36pm On Dec 18, 2018
H B D Mr spyder

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (15) (Reply)

Cost Of Plastering A 4 Flat Building. / Tallest Buildings In Port Harcourt: Pictures & Video / Building A Large Duplex In Enugu

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.