History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) (39794 Views)

I Decided To Test-Run The INEC's Election-Results Viewing Portal Already / Amaechi And Wife, Judith Inspect Lagos-Ibadan Rail Project / Lagos-Ibadan Rail: Amaechi Inspects Site Of All Stations - Photos (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by FriendNG: 4:15pm On Dec 19, 2018
It was a mere 50-minute ride, yet it was historic in many ways.

The first standard guage rail line between Lagos, Nigeria’s business headquarters, and Ibadan in the heart of the Southwest was test run.

The 36-kilometre journey was the result of a project that began in June 2017.

Leading the group of select passengers was Minister of Transportation Rotimi Amaechi. The 150km per hour speed will be realised early next year when the job is completed. It is comfortable inside the rail car.

The minister had, during his routine visit on December 4, insisted he must ride a rail car on the tracks by December 18.

With him on the 36-kilometre journey were members of the House Committee on Land Transportation, led by its chairman Abdulmumin Jibrin, officials of the ministries of Transportation and Works, the Nigerian Railway Corporation (NRC) and representatives of the China Civil Engineering Construction Company (CCECC), as well as a consortium of engineers and consultants.

Amaechi said Vice President Yemi Osinbajo and other members of the Federal Executive Council (FEC) would ride on the track in the first week of January, next year.

He dedicated the success of the project to the media, who according to him, kept a tab on the project since it started in June 2017.

The minister commended the contractor for bringing the project to fruition within 18 months. He challenged local engineers to rise to salvage the nation from foreign domination.

Amaechi said: “While praising the Chinese for their engineering prowess which has turned a rain forest into an emerging city, our engineers must see this as a challenge and save Nigeria from the clutches of foreign domination in the area of construction.

“This project is nearing completion. Right now, work has advanced and we are six kilometres away from Abeokuta. The contractors have assured me that we would be able to ride from Iju in Lagos, to Abeokuta, the Ogun State capital by the first week of January, 2019. The idea is to bring the vice president and some ministers to join in the ride.”

He said that once the track is flagged off, the route would be opened for passenger traffic, while efforts would be doubled to ensure that the standard gauge be taken to Ibadan.

He said work would begin on the construction of stations immediately the project gets to Ibadan.

The minister said: “I directed that they should stop work on the stations and concentrate on the tracks. They should thereafter return to the project once the tracks have been laid to Ibadan.

“If the train gets to Ibadan by January, the government would continue to run free train ride from Iju to Ibadan, whether or not election is on, in line with presidential directive.

“We will start putting passengers as we test the tracks and they can stop anywhere they want to stop on the corridor up to Ibadan.”

He disclosed that the NRC would mobilise locomotives and coaches from the Abuja-Kaduna line, while the government awaits the delivery of the coaches from China.

Amaechi said the government already anticipates heavy traffic on the Lagos-Ibadan Standard gauge, a fact he said was responsible for requests by his ministry for the purchase of more locomotives and coaches to service the corridor.

Jibrin told reporters that the Transportation minister deserve commendation from the Federal Government on behalf of Nigerians for the extent of work achieved within the short period of time.

The lawmaker, who expressed excitement at the speed and pace of the project, wondered why the project has been under-reported, promising to personally make his impression known to President Muhammadu Buhari.

Jibrin said his committee was happy to have acceded to the minister’s invitation to witness the test run of the tracks.

“We want to assure the ministry and Nigerians that we would continue to support this project and do everything within our powers to ensure it comes to fruition,” Jibrin said.

Project coordinator Leo Yin said the CCECC had been working round the clock on the track.

“Since November, we have been working more at night, to ensure we meet the demands of the government,” Yin said.

He disclosed that the Chinese firm already employed over 9,000 workers among whom are engineers, and artisans on the project.

The minister stopped the tour at Odeda, Section III, Ogun State, where he went into a closed door session with the technical committee that went far into the evening.


http://thenationonlineng.net/history-lagos-ibadan-standard-gauge-rail-line-test-run/

31 Likes 7 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by FriendNG: 4:15pm On Dec 19, 2018
More

14 Likes 5 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by FriendNG: 4:15pm On Dec 19, 2018
Photo Credit: Israel Ibeleme

28 Likes 7 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by uzohrome(m): 4:24pm On Dec 19, 2018
Amaechi becomes the most working and outstanding amongst the appointed Ministers . Good job brother. A true Biafran smiley

140 Likes 8 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by deboysben(m): 4:25pm On Dec 19, 2018
Don't be surprise that after campaign and elections work at that site will slow down and eventually be abandoned.

They are rushing it whether the work is solid or not just to meet up their way of securing south west votes.


However, They are also over hyping this project just to secure cheap political points. Well it's for those their brains are being used.


I rest my case.

53 Likes 13 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by checkolatunji: 4:26pm On Dec 19, 2018
Good one. Make una do quick and fix the IDDO Terminal so that we can start joining the train. From there.




Check Siggy

26 Likes 1 Share

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by Konquest: 4:39pm On Dec 19, 2018
uzohrome:
Amaechi becomes the most working and outstanding amongst the appointed Ministers . Good job brother. A true Biafran smiley
^^^^
^^^^
"Amaechi becomes one of the MOST HARD WORKING and outstanding amongst the appointed Ministers .
Good job to the indefatigable Minister. "A TRUE NIGERIAN."


"Ikwerre meka!"[X5]
grin


Thanks to Rivers State for producing this indefatigable Ikwerre man... he's
always checking projects as and when due. That's the way to go! grin



PS: @uzohrome, the Ikwerre ethnic nationality rejected rebel secession from Nigeria in 1967.
Captain Elechi Amadi, a great Ikwerre man who was born on May 12, 1934-29 June 2016 (aged 82)
when he passed away rejected secession from Nigeria in 1967!

He served in the "3rd Marine Commando (3MCDO)" [3rd Marine Division of the Nigerian Army] after Federal
Troops commanded by Lt. Colonel Benjamin Adekunle liberated him from prison in Port Harcourt during the
final defeat of the rebels between May 17-24, 1968
.



Read More Here:
1]https://www.nairaland.com/3493194/ikwerres-went-against-igbo-colonisation
2]https://www.vanguardngr.com/2016/06/elechi-amadi-dies-82/
3]https://en.wikipedia.org/wiki/Elechi_Amadi
4]https://www.vanguardngr.com/2013/09/book-serial-the-war-proper-3mcdos-30-day-march-on-port-harcourt/
5] "The Forgotten Victims: Ethnic Minorities in the Nigerian Civil War, 1967-1970." Arua Oko Omaka
https://encompass.eku.edu/cgi/viewcontent.cgi?referer=https://en.wikipedia.org/&httpsredir=1&article=1017&context=jora

^^^^^
^^^^^
Full steam ahead... Well done for the FG and
Minister Chibuike Rotimi Amaechi and his
dynamic team at the Ministry.

Next... Lagos to Calabar rail line and Osogbo
to Ado-Ekiti rail line... and PH to Maiduguri
rail line
! cheesy

82 Likes 8 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by PointZerom: 4:41pm On Dec 19, 2018
Hope there's a cow to test run the rail with them because I know that Buhari is doing this for easy transportation of cows.


But education and health sectors that's not of any importance to cows are neglected.


THUNDER FIRE YOU THERE.

1 Like 2 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by Nobody: 4:42pm On Dec 19, 2018
It appears AMAECHI is more efficient and useful than FASHOLA.
I am not surprised.
WIKE still they learn for where AMAECHI dey

21 Likes 3 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by drshrewd: 4:42pm On Dec 19, 2018
[b]Amaechi the Workaholic minister.
A glimps of what you did in Rivers cool
You transformed almost all the sectors of the economy in Rivers...... Education health, agriculture, security, human capital, rural development, sports, road infrastructure, etc.
We the true indegens of the state will never forget your touch of quality not even as time Wong's chariot
[/b]cool

33 Likes 4 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by bellazz(m): 4:43pm On Dec 19, 2018
Omi ko Lo ta

1 Like 1 Share

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by monimekaz(m): 4:43pm On Dec 19, 2018
uzohrome:
Amaechi becomes the most working and outstanding amongst the appointed Ministers . God job brother. A true Biafran smiley

Come on ..will you stop that Biafra thing you are calling

25 Likes 3 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by farem: 4:43pm On Dec 19, 2018
deboysben:
Don't be surprised that after campaign and elections work at that site will slow down and eventually be abandoned.

They are rushing it whether the work is solid or not just to meet up their way of securing south west votes.


However, They are also over hyping this project just to secure cheap political points. Well it's for those their brains are being used.


I rest my case.


Here comes one of the Sadducees Sad-u-sees

59 Likes 4 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by ossaisly(m): 4:43pm On Dec 19, 2018
pot belle everywhere undecided undecided undecided

1 Like 1 Share

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by shitholenation: 4:44pm On Dec 19, 2018
Where have this minister been?he seems to be at the background for a while,i hope all is well?
Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by easyfem(m): 4:44pm On Dec 19, 2018
So some pple can still click SHARE on good news ....

2 Likes 1 Share

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by checkolatunji: 4:44pm On Dec 19, 2018
Good job. You people should finish IDDO Terminal quick so that we can ride from there instead from. Iju

11 Likes 1 Share

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by ayodaisi: 4:44pm On Dec 19, 2018
ameachi man man shame on pdp the looters

12 Likes 2 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by wese90(m): 4:44pm On Dec 19, 2018
Kuddos


If you have iCloud Locked IPhone X , chat me up on 070*6535*805seven
Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by paymentvoucher: 4:45pm On Dec 19, 2018
grin Some people won't like this News

15 Likes 3 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by Konquest: 4:45pm On Dec 19, 2018
FriendNG:



http://thenationonlineng.net/history-lagos-ibadan-standard-gauge-rail-line-test-run/


Lalasticlala Mynd44
^^^^^
^^^^^

Fantastic... thanks for the updates on this project.
The Nigerian economy is going to really BOOM
with this project starting from 2019... grin

Thanks to Minister Chibuike Rotimi Amaechi for keeping
the hopes of Nigerians in the Diaspora and in Nigeria high
with the upgrade of infrastructure which is needed
to ELEVATE the Nigerian economy and CRASH the
cost of production, transportation and food items
through mass transportation by railroad freight.


The standard guage rail project is a 156 kilometre
Lagos-Ibadan fast rail with extension to Nigeria’s
premier port in Apapa, Lagos State! grin


When the 650,000 barrels per day Dangote Refinery in
Ibeju-Lekki, Lagos starts production in 2019, the pump
price of fuel will drop to about N60 per litre and the
improved rail infrastructure would lead to efficiency
in fuel distribution and drop in the cost of goods and
services. The ECONOMY will BOOM in 2019!


All the best!

27 Likes 4 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by Prompto: 4:45pm On Dec 19, 2018
Igbo wailers over to your kith n kin

11 Likes 3 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by krownjoy97: 4:45pm On Dec 19, 2018
MORE BLESSING PMB
MORE BLESSING OSHIBAJO
MORE AMEACHI
MORE BLESSING FEDERAL REPUBLIC OF NIGERIA

23 Likes 3 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by Lanre4uonly(m): 4:46pm On Dec 19, 2018
Dividends of democracy.

7 Likes

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by Tundeobama(m): 4:46pm On Dec 19, 2018
Nice one amechi one region support pdp for 16yrs till today nothing to show for it tell me why south south and south west won't vote apc.pdp never again.

16 Likes 1 Share

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by tunjijones(m): 4:46pm On Dec 19, 2018
.
Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by Lush100(m): 4:48pm On Dec 19, 2018
deboysben:
Don't be surprised that after campaign and elections work at that site will slow down and eventually be abandoned.

They are rushing it whether the work is solid or not just to meet up their way of securing south west votes.


However, They are also over hyping this project just to secure cheap political points. Well it's for those their brains are being used.


I rest my case.

"Don't be surprised"

no sir i will not be surprised.

in fact i am sure that that is what is going to happen.
in fact the project will likely not be completed to a fully standard modern rail .
the only thing we are seeing are the laying works, the real project is more than all these write ups. they will leave that moving metal as the train.
Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by KehnnyCares(m): 4:48pm On Dec 19, 2018
deboysben:
Don't be surprised that after campaign and elections work at that site will slow down and eventually be abandoned.

They are rushing it whether the work is solid or not just to meet up their way of securing south west votes.


However, They are also over hyping this project just to secure cheap political points. Well it's for those their brains are being used.


I rest my case.
One day, this hatred will consume you. If you continue to see nothing in what will benefit even your unborn children, then hatred will surely consume you.

34 Likes 3 Shares

Re: History As Ameachi, Lawmakers Test Run 32km Segment Lagos-ibadan Rail (pics) by GEEBITE: 4:48pm On Dec 19, 2018
Debola Williams wore a white native dress with a cap to match to a construction site!!!
FriendNG:
Photo Credit: Israel Ibeleme

cc: Blue3k

1 Like

(1) (2) (3) (4) (Reply)

Pictures PDP Campaign In Dawakin-tofa Kano Hometown Of Ganduje / CBN Governor, Emefiele Risks Prison Over $53m Garnishee Order / ₦212 Fuel Price Hike: PPPRA Releases Statement

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.