Nairaland Forum / Nairaland / General / Properties / These Are Stages Involved In Building A House (54625 Views)
Cost Of Building A House In Nigeria / Building A House From Scratch Or Buying One? / General Topic Thread-To Discuss Anything And Everything in Building Construction (2) (3) (4)
Re: These Are Stages Involved In Building A House by aboki2000(m): 8:50am On May 02, 2017 |
odicity: |
Re: These Are Stages Involved In Building A House by 36STATES: 9:34am On May 02, 2017 |
money121: Terrible handwork. Go first to develop your skill. It looks really bad done. My honest assessment. 2 Likes |
Re: These Are Stages Involved In Building A House by money121(m): 9:47am On May 02, 2017 |
36STATES:What's this one saying 1 Like |
Re: These Are Stages Involved In Building A House by postension: 10:13am On May 02, 2017 |
Please note, setting out of a building is an essential/critical stage of building construction and should not be done by a bricklayer. You want to set out the FOUNDATION of your building and you entrust it in the hands of a bricklayer? then you are not serious. The Site/Resident Engineer is ment to do that. Stop building collapse, get a professional to handle your building. |
Re: These Are Stages Involved In Building A House by zik4ever: 10:40am On May 02, 2017 |
Please is there a standard payment for an architect's service e.g. is it 5% or 10% of total cost of the building or it is discretionary/negotiated? 1 Like |
Re: These Are Stages Involved In Building A House by AkhereOkaka(m): 11:46am On May 02, 2017 |
[quote author=odicity post=40211999]Stages involved in Building a house Most people that are nursing the dream of erecting a building structure are often curious about the stages involved in building their dream home. We want to give an overview of those stages 1.Seek advice from your Architect/Engineering on what type and size of land the can suit your dream house 2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute. 3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process. 4.you need to arrange with a Land surveyor to establish and draw out the site boundary, the surveyor will also put the position beacons on the boundaries. 5.The drawings of the land surveyor will be used to produce at befitting building plan for you, a set of plans building plan usually three will have to be used to seek for building plan approval. 6.Clear the site manually or mechanically(bulldozer) 7. You can now move to site, for about 2-3 bedroom bungalow at starting, get two trips of sand and a trip of gravel, 8. locate a secured place where you can keep your bags of cement 9. Acquire a tank or drum where water can always be stored for use. 10. Buy about 1000 blocks for a starter. you can choose from five,six and nine inches block as required or suggested by your builder. 11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed. 12. After the setting out have be done foundation excavation commences, after excavation concrete is poured on the foundation and leveled. the leveling is done by a mason to ensure uniformity of foundation 13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems). 14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel. 15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete. 16. At least two or more layers of blocks are laid on the lintel after this the building is ready for roofing. 17. At this stage carpenters are contacted, the timber or steel in the case of larger projects are estimated and cost. Roofing material could be chosen from aluminum, asbestos, plastics, galvanized zinc. 18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber, 19. At this stage door frames, wardrobes by furniture maker, windows and other accessories can commence 20. Tillers or terrazzo contractors can be contacted if need be.The tilling and plastering works can go on simultaneously. two to three trips of plaster sand will be needed for plastering a moderate size. Sir, I have the plan of building 3 bedroom flat, how many Six inches block do I need to buy in terms of quantity. Kindly treat with dispatch. Thanks |
Re: These Are Stages Involved In Building A House by restored2016(m): 12:42pm On May 02, 2017 |
Teewhy2:this information is not for laymen like us to build for ourselves but for us to know what is involved and the necessary steps involved so that we will not be defrauded. I appreciate this a lot. God bless the OP. 3 Likes |
Re: These Are Stages Involved In Building A House by Alasi20(m): 12:45pm On May 02, 2017 |
Owkay |
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 4:32pm On May 02, 2017 |
nice one @op, but you forgot an aspect of work which is crucial before your dpc/German floor. you definitely need your plumbing/mechanical team to install your plumbing fixtures which comes mostly from beneath the floor except you plan on doing surface piping which is odd n outdated. I.e your wash hand basin water supply pipe/ w.c outlets so on. these are just in addition as you the O.P has done a very good job and nice compilation. Arc. Stephen 07081911211 1 Like |
Re: These Are Stages Involved In Building A House by Brimmie(m): 6:28pm On May 05, 2017 |
Flashmove: Almost Funny!! See your head like Bag of Beans!! 3 Likes |
Re: These Are Stages Involved In Building A House by blackboy(m): 4:13pm On May 06, 2017 |
Interesting |
Re: These Are Stages Involved In Building A House by Oju4190: 8:53am On May 14, 2017 |
Gudday.....My house is on roofing stage but because of financial contrain can i do the German floor without roofing. While dis decision is because I intend to take loan to roof d house so b4 den i want to b using my salary to do some work on the house so dat immediately i roof i will ensure dat i enter d house so dat paying back will not b too stressful for me..... Tanks |
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 7:03am On May 15, 2017 |
Oju4190: off course, there is no harm in doing your floor without roof. go ahead Sir, what I presume might only happen is pple/goats defecating there depending on the environment your site is. |
Re: These Are Stages Involved In Building A House by Oju4190: 7:20am On May 16, 2017 |
Horlardorjah:tanks so much. my fear is dat wen it rain d whole place will look like swimming pool since dere is no percolation of water |
Re: These Are Stages Involved In Building A House by Alexbrendan: 2:21pm On May 18, 2017 |
Very beautiful post! but how about if it's a duplex? |
Re: These Are Stages Involved In Building A House by ATnTMartz: 10:15pm On May 26, 2017 |
I am just curious of stages of building too after Foundation (German floor type) is done. I mean the stages after the foundation to the roofing level. I received a quote from my builder and i need to veriy this with any experience builder in the house. It is a 6 bedroom duplex on a 2plots of land in Ibadan. can anyone help (before i post the numbers and detail my builder sent to me) |
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 11:17pm On May 26, 2017 |
[quote author=AkhereOkaka post=56130442][/quote] the plan is needed before quantity of block can be calculated. so upload your drawing and get response asap |
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 11:21pm On May 26, 2017 |
ATnTMartz: drawings needed to quantify your project. you can mail me osunlanastephenp@yahoo.com |
Re: These Are Stages Involved In Building A House by ATnTMartz: 5:56pm On May 27, 2017 |
Horlardorjah: Thanks. Check your email |
Re: These Are Stages Involved In Building A House by ATnTMartz: 5:58pm On May 27, 2017 |
Horlardorjah: These are the drawings
|
Re: These Are Stages Involved In Building A House by ATnTMartz: 2:03pm On May 31, 2017 |
Is there anybody here to respond to my comment or inquiry |
Re: These Are Stages Involved In Building A House by OMEGA009(m): 2:52pm On Apr 01, 2018 |
Hi. I’m a novice in building and I need a cost estimate for a 5 bedroom duplex with penthouse. Firstly from excavation to DPC. Building plan says estimated size of building is 167 sqm and d DPC level must be +450 (dunno what that means). It has 23 box pillars and 3 round pillars. Pls cost estimate must include quality material as I want to eliminate all forms of rising damp and penetrating damp. Thx a million. |
Re: These Are Stages Involved In Building A House by odicity: 4:15pm On Apr 01, 2018 |
OMEGA009:OK chat me up on WhatsApp 08115801276 |
Re: These Are Stages Involved In Building A House by buzzetin(m): 5:30am On Apr 02, 2018 |
True words |
Re: These Are Stages Involved In Building A House by DEXTROVERT: 7:12pm On Jun 23, 2018 |
money121: Nice one, how much in total will do for 4 bedroom using same zinc 1 Like |
Re: These Are Stages Involved In Building A House by Logistics(m): 12:31am On Dec 16, 2018 |
For someone that has filed for c of o. How do I go about building approval? |
Re: These Are Stages Involved In Building A House by odicity: 11:42pm On Dec 28, 2018 |
Logistics:which state? |
Re: These Are Stages Involved In Building A House by joycluv: 9:31am On Dec 29, 2018 |
What is the maximum courses of blocks to lay after lintel to have a high ceiling? Thanks |
Re: These Are Stages Involved In Building A House by odicity: 7:30am On Dec 30, 2018 |
joycluv:five ( standard). contact Deljic ventures for your designs and construction. www.fb.com/deljconsult |
Re: These Are Stages Involved In Building A House by Asquare84(m): 7:57am On Dec 30, 2018 |
Nice post |
Re: These Are Stages Involved In Building A House by odicity: 8:04pm On Dec 30, 2018 |
Asquare84:uwc contact Deljic ventures for your designs and construction. www.fb.com/deljconsult |
Re: These Are Stages Involved In Building A House by motta(m): 10:40pm On May 19, 2021 |
odicity: |
Construction Of Two Unit Semi Detached Two Bedroom Flat, Ogidi, Anambra State / Cut Your House According To Your Blocks (see Photo) / Ikoyi Building: Wife, Relations Fight Over Femi Osibina's Cash, Luxury Vehicle
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 66 |