Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 7:38pm On Jan 18, 2019 |
Olassab: Evening.... Thanks for the comment. You would have to share the plan... That also is important. Regards |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 11:08pm On Jan 18, 2019 |
saydfact: Thanks can i post here or whatsapp or email you direct, really appreciate your reply |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 7:45am On Jan 19, 2019 |
Olassab: here is free consultancy email is paid consultancy i'm OK with any. lol.... |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 12:16pm On Jan 19, 2019 |
saydfact:Thanks here is the plan |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 12:31pm On Jan 19, 2019 |
Olassab: is there any reason why its a 2 bedroom and NOT 3 ALSO, is the site inclined (not rectangular) why I'm asking - I also advice clients to build a minimum 3 bedroom flat EXCEPT there are other factors that wont allow.. Fund is NOT one of such factors.... |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 12:32pm On Jan 19, 2019 |
Olassab: what do you mean by CONCRETING ? I'll work on your estimate over the weekend...... so help me God |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 1:15pm On Jan 19, 2019 |
saydfact: Thanks, that is what the Architect recommended, i pushed for a 3 bed, he said it will not fit. it is basically half a plot, it is flat and there is another half plot behind(my brothers) and a building behind(it is family land) so access is needed to get to the back building so we will use left side, can't do right side (granny's grave is in the way) |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 1:18pm On Jan 19, 2019 |
saydfact: very good question, i think it the german floor bit. everyyhing is static at moment, please where are you based? just realised these things should be taken outside, advise, costs etc. Amen |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 6:19pm On Jan 19, 2019 |
Olassab: Do a sketch of the land and show anything on it eg building, grave etc and send to my mail (in my signature) - I'll send u my WhatsApp nos |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 6:20pm On Jan 19, 2019 |
Olassab: Lagos and Abeokuta depending on days |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 10:28am On Jan 20, 2019 |
Olassab: Morning.. I'm presently looking at your design and working around it. You can comfortably have a 3 bedroom in that space, with a bigger kitchen and dining also..... The 3rd room would share toilet with visitors.. However, would you be willing to pay a little for the drafting and time to achieve that? I understand you've spent (perhaps a lot to get this design) but 1 extra room would solve a lot of problems in the future. Whatever you decide.... I'll give you FOR FREE a breakdown of Materials needed for FOUNDATION and GERMAN FLOOR only..... Plus advice on cost of workmanship...... Goodluck. Regards....... |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 2:30pm On Jan 20, 2019 |
saydfact:My brother the issue is the plan has already been approved, any advice will be grand, although at the moment this will be okay ' I'll give you FOR FREE a breakdown of Materials needed for FOUNDATION and GERMAN FLOOR only..... Plus advice on cost of workmanship' in hindsight i wish i had come here first before starting anything, i have never understood why each bedroom needs to have it's own bath and toilet. when i was growning up in Surulere we only had 1 toilet and bathroom and we never fought to use it, you just took your turn!!! |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 3:08pm On Jan 20, 2019 |
Olassab: OK..... pls remind me during the week - I'll do it Monday or Tuesday.. Goodluck...... |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 3:43pm On Jan 20, 2019 |
saydfact: Thanks really appreciate your help, please do go to too much trouble on my account, if you have total cost in mind for the foundation that will be fantastic. If you also have headline figure for total completion of the building great. Please send me your whatsapp |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 3:46pm On Jan 20, 2019 |
Olassab:thanks got the whatsapp |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 8:28pm On Jan 20, 2019 |
Olassab: Unfortunately your request was foundation and German Floor.... And that I have done.... (see below) Except where stated, I've used standard parameters for my calculations. Foundation (Materials) 9 inches Block - 510 pcs Cement (concrete and block setting) - 31 bags Granite - 30 tonnes (enough for German Floor) Sharp sand - 3 tippers (enough for German Floor) Workmanship for above. Digging of foundation - 35k max Bricklayers fees - 55k - 60k Setting out - 20k (materials and labour) Filling of foundation - to be estimated on site. German Floor (thickness used is 100mm or 4 inches) Materials Needed Cement - 35 bags 1by12 somi wood - 12 pcs or buy 6 and slice into 2 each 2by4 - minimal for bracing 3 inches nail - 1k worth Binding wire - 2k worth Workmanship for above. Bricklayer - 40k Carpenter - 5k Filling of foundation - negotiate on site or 2.5k per tipper Find the cost of the materials in your area and add up for project cost. Thanks for contacting me.... (file closed) Goodluck... |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 1:33am On Jan 21, 2019 |
saydfact:Thank you, i have your whatsapp, lets see how we go. really appreciate this 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Finesing: 9:58pm On Feb 03, 2019 |
saydfact: I've been reading all your posts one by one and I'm so grateful O have a question tho Can someone who is building a duplex use this same cost saving method? Or it's only for this type of project? Thanks. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 7:46am On Feb 04, 2019 |
Finesing: Its even better for duplex...... My property is one, and that's what I used.. Thanks for reading my post |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by joycluv: 12:35pm On Feb 04, 2019 |
Plz,how did you lift the pre-cast lintel |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Silverweb: 12:57pm On Feb 04, 2019 |
Do not allow yourself to be cheated by artisans or anyone in your building project. Let us help you with the actual quantity and cost of each material needed for your project. Call 08034131270 We help you count the cost |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 3:13pm On Feb 04, 2019 |
joycluv: man power |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by joycluv: 4:13pm On Feb 04, 2019 |
saydfact:. I intend to follow dis your pattern but plz clarify me on the following: ( 1) Like how many persons can lift one? (2) Is it with bare hands or what? (3) What will hold the men up? Again, what if it falls down and breaks? |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Finesing: 4:25pm On Feb 04, 2019 |
saydfact: Do you have like a blog or site for your property/building ish? I spent the better part if yesterday and today reading and taking notes from all your property/building topics. I'm still yearning to read and learn more. Oh and thanks Me and a lot of people are grateful for your good work. May you work and never stumble. I typed out a longer essay as a response but most contained private info so if you don't mind, can I email you? |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 5:28pm On Feb 04, 2019 |
Finesing: Thanks sir... I have a blog but I discovered blogging on NL is easier for me... I've not updated my blog in a long while.. My email is cadsolutions2009@gmail.com.. I'll send you my WhatsApp nos if you mail me. I'll also reply ur NL mail.. |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 5:33pm On Feb 04, 2019 |
Evening Followers. Kindly check out my latest post here >> https://www.nairaland.com/5002180/what-did-he-wrong-why#75413259 Thanks |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Finesing: 5:50pm On Feb 04, 2019 |
saydfact: Yes I later found and went through your blog and can confirm I still subscribed tho just incaee you decide to pick it up again, I can't afford to miss any update from you. I just sent you an email and expecting a response soon. Thanks. 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by joycluv: 5:30am On Feb 05, 2019 |
joycluv:Waiting patiently for your response on this |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 8:27am On Feb 05, 2019 |
joycluv: morning, these questions are not technical but let me attempt them. 1. How many persons can lift one = Depending on the size of window 2, 3 or 4. 2. Is it with bare hands or what? = Builders' choice - but we used bare hands 3. What will hold the men up = Scaffolds or a wooden platform, the same thing that would hold the men up when setting blocks above hand level or casting the conventional lintel 4. What if it falls and breaks = Just like any other building component, replace it. I hope its 4/4 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by joycluv: 11:35am On Feb 05, 2019 |
saydfact:. Many Thanks! Will be exploring this option soonest. 1 Like |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by tabithababy(f): 11:40am On Feb 05, 2019 |
I need a self con in gbagada |
Re: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by saydfact(m): 3:00pm On Feb 05, 2019 |
tabithababy: rent? That's not my field |
(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (Reply)
Sandra Duru's Landlord Throws Out Her Properties From Lagos Home (Photos) / Edo Landlord Burns Down His House Over Tenants’ Refusal To Pay Rent (Video) / The Port Harcourt Luxury Flats
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 59 |