Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,207,476 members, 7,999,137 topics. Date: Sunday, 10 November 2024 at 06:36 PM |
Nairaland Forum / Nairaland / General / Travel / Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway (34244 Views)
Video Of Trains Being Test Run On The Red Line Tracks In Lagos. / The New Trains That Will Be Used For Lagos-Ibadan Railway And Their Specs / Itakpe Warri Rail: Test Run Of Trains Commence At Agbor - Photos (2) (3) (4)
(1) (2) (3) (4) (5) (Reply) (Go Down)
Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by AutoReportNG: 3:20am On Feb 06, 2019 |
In our earlier reportage, we broke the news that the federal government has paid for some locomotive trains. These trains will be used for the Lagos-Ibadan Railway and for the Abuja-Kaduna railway respectively. AutoReportNG did a review of the trains the federal government is buying, their images and their specs and these may interest you. 1. NDJ3 Quasi-high Speed DMU [img]https://2.bp..com/-hHmxhxpuu80/XFo47_sqW5I/AAAAAAAAX5A/P1kvTcB-LDEk71xbUGZtwnVJv5vjA4uegCLcBGAs/s1600/NDJ3%2BQuasi-high%2BSpeed%2BDMU.png[/img] NDJ3 “Harmony and the Great Wall” DMU is developed under the transportation demand of Beijing Olympic Games, which commutes between Beijingbei and Yanqing. This DMU is a “2 motor-cars and 7 trailing cars” unit with one motor-car at each end and seven trailing passenger cars fixed in between. The locomotive is equipped with 12V280ZJ diesel engine. The Maximum running speed is 160km/h. Based on mature technologies, long-term operation and inspection results that got from medium and large overhaul, the performance and reliability of main components such as diesel engine, bogie frame, car body, traction motor used for NDJ3 DMU have been well verified. It is well suited for long steep grade. Since NDJ3 DMU was formally put into operation in 2008, this train set has been running safely and reliably for 8 years and was well recognized by customers, It was awarded the first Prize of Scientific & Technological Progress of China Railway Society in 2009. Basic parameters of diesel motor-car: Purpose Passenger transport Rail gage 1435mm Transmission mode AC-DC transmission Axle arrangement A1A-A1A Axle load 21t Max. Service Power of the engine 2760kW Max. Operating Speed 160km/h Constant speed 59.3km/h Maximum starting tractive effort 187.3kN Continuous tractive effort 121kN Minimum curvature radius negotiated 145m Capacity of fuel tank 5500L Locomotive length 20990mm 2. DF8B High-Power Freight Diesel Locomotive [img]https://3.bp..com/-_efZTyHasrc/XFo4mAhi-7I/AAAAAAAAX44/X4Quuase-5IKoJQQdv6yyh9qRe68l-5ygCLcBGAs/s1600/DF8B%2BHigh-Power%2BFreight%2BDiesel%2BLocomotive.jpg[/img] DF8B diesel locomotive, as the mainline freight diesel locomotive with the highest power for single diesel engine in China, is the ideal traction power for speedup of heavy mainline freight transportation. Equipped with 16V280ZJA diesel engine, JF204D synchronous main alternator and ZD109C traction motor, the locomotive has speed of more than 90km/h at maximum constant power. It was awarded “Second Prize of MOR Scientific & Technological Progress” and Jiangsu Province Excellent New Product “Golden Ox Prize”. New technologies such as microcomputer control system, large-screen color liquid crystal display, dynamic brake unit for self-load test at full power and etc., are utilized in this locomotive. It is modern in electric control technology and excellent in dynamic performance. DF8B diesel locomotive is widely used in state railway and industrial and mining companies, this locomotive is designed by taking DF8B diesel locomotive as prototype. It has been exported to Venezuela, Iran, Guinea and so on. Basic locomotive parameters: Purpose Freight transport Rail gage 1435mm Transmission mode AC-DC transmission Axle arrangement Co-Co Axle load 25t Max. Service Power of the engine 3680kW Max. Operating Speed 100km/h Constant speed 31.2km/h(28.2km/h) Maximum starting tractive effort 520kN Continuous tractive effort 340kN(369kN) Minimum curvature radius negotiated 145m Capacity of fuel tank 9000L Locomotive length 22000mm 3. DF11G Quasi-high Speed Passenger Diesel Locomotive [img]https://4.bp..com/-rnHowsZCPH4/XFo4Sq3ariI/AAAAAAAAX4s/W8dIAwnAvecM3DCJ7kMNmtq1x9hBAOOkQCLcBGAs/s1600/DF11G%2BQuasi-high%2BSpeed%2BPassenger%2BDiesel%2BLocomotive.png[/img] DF11G double-heading quasi-high speed passenger diesel locomotive is specially developed for grand speedup of railway. Currently, it is the main diesel locomotive run on China railway. It is equipped with 16V280ZJA main diesel engine for traction, Lonworks network control is utilized, speed monitoring system is set up for running safety and dynamic brake device is incorporated with full-power self-load function. Auxiliary diesel generator set with power supply functions for passenger cars is also equipped. The double-heading locomotive is of enough power reserve, superior performance of starting and accelerating, guaranteed reliability of key components, which is suitable for long routing. Basic locomotive parameters: Purpose Passenger transport Rail gage 1435mm Transmission mode AC-DC transmission Axle arrangement 2(Co-Co) Axle load 23t Max. Service Power of the engine 2x 3610kW Max. Operating Speed 170km/h Constant speed 83.5 km/h Maximum starting tractive effort 2x 193kN Continuous tractive effort 2 x 125kN Minimum curvature radius negotiated 145m Capacity of fuel tank 2x 7500L Locomotive length 2x 22200mm 4. DF7G Diesel Shunting Locomotive [img]https://3.bp..com/-g98KrkuFFnc/XFo4Df5HZiI/AAAAAAAAX4o/x4qgsmaapggJTUolOYVNdChcRnmsEZyiQCLcBGAs/s1600/DF7G%2BDiesel%2BShunting%2BLocomotive.jpg[/img] DF7G AC-DC electric transmission diesel shunting locomotive is mainly used for marshalling and shunting operations in large and medium sized marshalling yards. It is equipped with 12V240ZJ diesel engine, its main components are interchangeable with the ones of DF4 and DF5, and its components are most suitable for DF4. Based on DF5, improvements on generalization, serialization, modularization, standardization have been made. It adopts modular construction of outside corridor and underframe load-bearing, diesel engine with stepless speed adjusting gear; The main transmission system adopts two excitation systems of PLC constant power excitation and original excitation of power adjustable resistance. The auxiliary system of the locomotive adopts auxiliary electrical transmission, the cooling fan and air blower of traction motor driven by AC motor. The control system adopts color liquid crystal display, with the functions of data display, fault diagnosis, detection and records, etc. Purpose Shunting and transfer operation for the industrial and mining companies or rail line Rail gage 1435mm Transmission mode AC-DC transmission Axle arrangement Co-Co Axle load 138t Max. Service Power of the engine 1840kW-2200kW Max. Operating Speed 100km/h Constant speed 17.6km/h Maximum starting tractive effort 442.1kN Continuous tractive effort 317kN Minimum curvature radius negotiated 100m Capacity of fuel tank 6000L Locomotive length 19400mm Source: https://www.autoreportng.com/2019/02/lagos-ibadan-railway-see-trains-that.html 7 Likes 1 Share |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by AutoReportNG: 3:21am On Feb 06, 2019 |
Not bad See more pictures of the train and Lagos-Ibadan Railway here https://www.autoreportng.com/2019/02/lagos-ibadan-railway-see-trains-that.html 14 Likes 2 Shares |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Lifestone(m): 3:28am On Feb 06, 2019 |
Sleep in Ibadan and work in Lagos. 94 Likes 4 Shares |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by SocialFinance: 3:31am On Feb 06, 2019 |
Very good development Unlike those refurbished one breaking into pieces in the middle of the journey ordered by the drunkard of Otuoke, the looter hero of ipob Republic of Biafra. I'm happy to be alive to see these great leap of development. 102 Likes 8 Shares |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Nobody: 4:15am On Feb 06, 2019 |
I heard USA doesn't have bullet trains. I think it's time private investors invests in this train transportation.they will make it big time. 28 Likes 2 Shares |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by CityNGR: 4:18am On Feb 06, 2019 |
WEE YOU KIP QUAYET!! WAKANDA NONSENSE ASSEMBLAGE OF APPARITION ARE THESE? I SAID IT BEFORE THAT YOU ARE A BROWN ENVELOPE REPORTER.... I HAVE PROOFS!! AutoReportNG: AutoReportNG:NEXT TIME GIVE YOUR VIEWS EXPLICITLY? SEE SOUTH AFRICA BELOW 78 Likes 6 Shares
|
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by CityNGR: 4:28am On Feb 06, 2019 |
ETHIOPIA That Ethiopia has built Africa’s first metro is illustrative of the country’s development in recent years: its economy has grown at rates of 10% per year for most of the last decade, partly thanks to grand infrastructure projects like this one. But it is evidence also of Chinese expansion across Africa. A Chinese loan paid for 85% of the $475m the Addis Ababa metro has cost; astonishingly, the line was built in just three years with plenty of imported engineering help. It will be run for the next five years by the Shenzhen Metro Group and China Railway Engineering Corporation. Chinese money is also paying for a new full-sized railway in Ethiopia, connecting Addis Ababa to Djibouti, which is planned to open next year, as well as new lines in Kenya and Nigeria. But other metro projects in sub-Saharan Africa are rare. Lagos, Nigeria’s biggest city, has had plans for a light rail transit system for several years now, which the World Bank has helped to fund; but construction has been continually delayed. There is much fighting over what has happened to the money already spent. Other large African cities, such as Nairobi, are investing more in roads than in rails. Commuters hoping to get onto a train and skip the traffic will have to keep waiting. 10 Likes 2 Shares
|
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by CityNGR: 4:32am On Feb 06, 2019 |
2 Likes |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by CityNGR: 4:37am On Feb 06, 2019 |
MORE FROM ETHIOPIA Addis Ababa, the capital of Ethiopia, has now an operating light rail system. The first line commenced operations on September 20, 2015, while second line is still under construction. The significance of this rail system should not be undermined, given this is not Europe where every large city has effective public transport system. Almost every large city in Africa suffers from heavy traffic, and transport systems are nothing short of chaotic. Addis Ababa has now shown that brand new rail infrastructure can be built within a densely built city. The next challenge is it to be an operational success 7 Likes
|
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Blue3k(m): 4:42am On Feb 06, 2019 |
How many tons of freight will be moved on the new rail line by the end of the year. Then how much will the government scale this up. 4 Likes |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by CityNGR: 4:56am On Feb 06, 2019 |
DO NOT BOTHER. THE MAN IN CHARGE BUILT A MONORAIL TO NOWHERE IN PORTHACOURT... Blue3k: 7 Likes |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by sogodihno: 5:55am On Feb 06, 2019 |
And someone will tell me not to vote for this man because he can't speak well, those that speak well in the past where are they. the clueless one with PHD what did he do? apart from encouraging looting and stealing. We are not going back to 16years of Darkness. PDP we are burying you on the 16. 76 Likes 4 Shares |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by CityNGR: 6:00am On Feb 06, 2019 |
sogodihno: DO NOT BE SCARED. WE R VOTING OUT POVERTY CLANNISH APPOINTMENTS UNEMPLOYMENT TRIBALISM FALSE ANTI CORRUPTION FIGHTS ON FEB 16!! 47 Likes 1 Share |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by helinues: 6:33am On Feb 06, 2019 |
Better than nothing Better than the money been shared within few people 4+4 = 2023 31 Likes 2 Shares
|
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by LOWPEAK: 6:33am On Feb 06, 2019 |
: |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by coolcharm(m): 6:34am On Feb 06, 2019 |
Nice. President Atiku Abubakar and V.P Peter Obi will comission them. Thank You. 27 Likes 1 Share |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by micgray100(m): 6:35am On Feb 06, 2019 |
de nice |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Nobody: 6:36am On Feb 06, 2019 |
sogodihno:Good Those educated ones are hardened corrupticians. 21 Likes 2 Shares |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Maxi3k(m): 6:37am On Feb 06, 2019 |
Just give dis train 5 years u no go recognise am again 4 Likes |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Seetto: 6:37am On Feb 06, 2019 |
If this is how buhari and is cabal will continue to rule Nigeria, so shall it be... PMB all the way, God bless PMB.. PDP ordinary HQ they cannot complete for good sixteen years after spending billions and that is how they have been running Nigeria , useless mofos and their gullible supporters. 31 Likes 1 Share |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Nobody: 6:37am On Feb 06, 2019 |
coolcharm:In their dreams. They should save money for 2023 campaign 16 Likes 1 Share |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by shox: 6:39am On Feb 06, 2019 |
CityNGR: Well if this project is what you're calling poverty, then am in 30 Likes 1 Share |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Nobody: 6:40am On Feb 06, 2019 |
krattoss:rail is a long term project. Some tracks in 9ja are over 100 years old. Private investors need quick roi. Train business wont gv u that 7 Likes |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Kaybaba5(m): 6:41am On Feb 06, 2019 |
Good one |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by tiredoflife(m): 6:42am On Feb 06, 2019 |
Notice the end of the article spoke about Lagos How world bank funded the rail system yet there is in fighting how this money has been spent Yet these same people want to tell us there is no corruption in APC Lagos with jagaban the thief in chief leading in the stealing. 5 Likes |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by Adegokenath(m): 6:43am On Feb 06, 2019 |
CityNGR:if this is south african train we have a very long way to go 1 Like |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by trexzee: 6:46am On Feb 06, 2019 |
. |
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by trexzee: 6:47am On Feb 06, 2019 |
Calabar 1 Like 1 Share
|
Re: Review, Specs Of Trains That FG Ordered For Lagos-Ibadan Railway by ridbell01(m): 6:48am On Feb 06, 2019 |
Children of hate and bitterness would not like this.. All what they to hear is bad news 17 Likes 1 Share |
Can I Travel To Trinidad And Tobago Visa Free / Immigration Sanctions Officers Who Stole From A 14 Year Old Girl / Man Cheats Death As Detached Tyre From Incoming Vehicle Misses Him
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 48 |