Nairaland Forum / Nairaland / General / Properties / 4 Bedroom Bungalow Enquiries on Design, Construction and Cost (43510 Views)
Design + Construction Of 7 Bedroom Family House, Enugu / Two Bedroom Bungalow Design, Construction Pictures And Cost / One Bedroom Bungalow Enquries On Design, Construction And Cost (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply) (Go Down)
4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:50am On Mar 13, 2019 |
We will be attending to the above topic, that is the design,construction and other questions on 4bedroom bungalow using the plan below as a case study. ABOUT SAMUEL AJOSE ENGINEERS LTD(S.A.E LTD) S.A.E is an indigenous BUILDING AND CIVIL ENGINEERING COMPANY of dedicated and highly motivated Architects, Builders, Civil Engineers, Quantity Surveyors and Land Surveyor engaged in providing Professional services in the field of BUILDING and CIVIL ENGINEERING WORKS. Our services are for both domestic and foreign Clients. OUR VISION To be the undisputed and dominant World Class Construction Company with Intergrity and Professionalism. Our services include, a) BUILDING AND CONSTRUCTION SERVICES b) WE PROVIDE THE SERVICES OF PROPERTY AND PROJECT MANAGERS(e.g LANDS,HOUSES AND PROJECTS c) ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS d) BILLS OF QUANTITIES AND MEASUREMENT BILLS e) REMODELLING, REHABILTATION AND RENOVATION WORKS f) REAL ESTATE BROKERAGE AND CONSULTANCY You can contact us through the following means; Tel: +2347035596641 Whatsapp: https:///2347035596641 website :www.saelimited.com Email: saeltd14@gmail.com and samuelajoseengineers@gmail.com 3 Likes 2 Shares
|
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 12:22pm On Mar 13, 2019 |
To start with, the external length and width of this building is 17375mm and 11950mm respectively. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by mrbigseun(m): 12:28pm On Mar 13, 2019 |
Dear Sir kindly share a 8 apartments of 2bedroom flats |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 12:36pm On Mar 13, 2019 |
mrbigseun: Welcome, I will get back to you. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 4:00pm On Mar 13, 2019 |
As a result of the size of this building, a full plot is needed for the construction. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by mrbigseun(m): 5:27pm On Mar 13, 2019 |
Thanks for your quick response i will be glad if you can get back to me soon . 8 apartments of 2 bedroom flats.on a 2 plot of land segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 6:44pm On Mar 13, 2019 |
segzy14: A 50 x 100feet plot or A 60 x120feet plot |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 6:49pm On Mar 13, 2019 |
Assuming the land has been purchased. We will proceed to the building construction proper and the cost of materials and labour will be outlined. We will be building this on a dry and table (flat) land. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by phemsie(m): 7:28pm On Mar 13, 2019 |
I'm following very closely Thanks so much for this... |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:15am On Mar 14, 2019 |
phemsie: You are welcome. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:20am On Mar 14, 2019 |
1. Site clearing: This has to do with a site that doesn’t have trees, shrubs,stumps etc. A site that just have bushes grown on it. 2Labourers will be needed for this task@N2,500 =N5,000 The Cost of clearing the plot is N5,000 |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Dapyem(m): 9:30am On Mar 14, 2019 |
segzy14: What of a land of 60 x 80 feet? |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Dapyem(m): 9:31am On Mar 14, 2019 |
segzy14: Am following you sir |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:52am On Mar 14, 2019 |
Dapyem: What is your inquiry about this type of plot? |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:50pm On Mar 14, 2019 |
2. Setting out. 20numbers of 1x12wood@ 1,100 =22,000 Sawing of woods = 1,600 Profiles. = 4,800 Nails. = 750 Lines. = 600 Transport(depending on distance) = 1,000 Carpenter. = 4,000 Engineer fee(depend on how complex the building is) = 10,000 Total cost for setting out this building=N44,750 |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:41pm On Mar 14, 2019 |
3.Trench Excavation 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Chekitaut: 4:54pm On Mar 15, 2019 |
Bros contact us for Granite, Cement, Sharp sand looking forward to hearing from u. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by CostEngr(m): 5:24pm On Mar 15, 2019 |
Splendid post! |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:56pm On Mar 15, 2019 |
CostEngr: Thank you. We will continue on Monday, it’s a busy weekend here. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by CostEngr(m): 8:10pm On Mar 15, 2019 |
segzy14: Great! |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:24pm On Mar 16, 2019 |
3. Trench Excavation a.k.a Digging Depth of Digging is 2feet=600mm=0.6m Total girth= 156.79metres x 0.7m x0.6m = 65.85 cubic metres @N700/m3 = N 46,095 Cost of digging this building is N46,095 |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Evaowokotomo(f): 10:30pm On Mar 16, 2019 |
Please sir how did you calculate the 156.79metres and 0.7m. The 0.6m is from the digging depth right? segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Tammynator(m): 12:39am On Mar 17, 2019 |
I'm following sir. Lovely post. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:57am On Mar 17, 2019 |
Evaowokotomo: The 156.79metres is the total length of the Digging while 0.6metres (600mm/1000=0.6m=2feet) is the depth of the Digging and the width of the Digging is three times the width of your block in foundation that is 230x3=690mm, approximately 700mm=0.7metres , I hope you understand. 2 Likes 1 Share |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by jiday4(m): 10:21am On Mar 17, 2019 |
Following with rapt attention, really learning , kudos sir |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by handsomebenze(m): 11:53am On Mar 17, 2019 |
Following with enthusiasm.. Nice thread. segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Evaowokotomo(f): 3:49pm On Mar 17, 2019 |
Thank you so much for the intelligent and well-explained answer sir. May you never lack wisdom segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:15pm On Mar 17, 2019 |
4. Blinding Thickness of blinding is 50mm=2inches 25bags of cement @ 2500. =62,500 4.07 tonnes of sharp sand@3000. =12,210 8.14 tonnes of granite @4500. =36,630 Labour =20,000 Total. =131,340 Total cost of Blinding is N131,340 |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:17pm On Mar 17, 2019 |
Evaowokotomo: Amen |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Rany4all(m): 6:15am On Mar 18, 2019 |
Following... |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:39am On Mar 18, 2019 |
5.Blockwork in Foundation The blockwork is 4courses(coaches)high 28bags of cement @2500. = 70,000 Sharp Sand-1/2tipper@38,000. = 19,000 1368 nos of blocks@200naira. =273,600 Labour. 1400blocks x50naira. = 70,000 Total cost of blockwork. = N432,600 2 Likes |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:08pm On Mar 18, 2019 |
6. Laterite filling 9.55numbers of 20tons tipper of laterite @40,000 =382,000 Labour. = 47,750 Compacting machine and operator. = 15,000 Total. = N444,750 Total cost for laterite filling is N444,750 1 Like 1 Share |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply)
Strangest Buildings In The World (photos) / Buying A House Or Building From Scratch: Which Is Cheaper? / New 10 Flats Of 2 Bedrooms Construction In Onitsha City
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 35 |