Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by mrbigseun(m): 7:16pm On Mar 18, 2019 |
Following full time! And the plan for 8 apartments of 2bedroom flat |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by michtob(m): 7:32pm On Mar 18, 2019 |
Keenly following. All the best sir |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:12pm On Mar 18, 2019 |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:16pm On Mar 19, 2019 |
7. Damp proof membrane (DPM) = N20,800 |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:33pm On Mar 19, 2019 |
8. Oversite Concrete. a.k.a German floor It is 100mm (4inches)thick. 105bags of cement @2500 =262,500 14tonnes of sharpsand@ 3,000= 42,000 28tonnes of granite@4500. =126,000 Labour. =105,000 Total. =N535,500 The total cost of the oversite concrete is N535,500 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by temmy6996(m): 4:23pm On Mar 19, 2019 |
segzy14:please specify state and location. 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by temmy6996(m): 4:30pm On Mar 19, 2019 |
segzy14:What's the mix ratio of cement, sand and aggregate and how many cubic meter of concrete are we talking here sir.....we are all learning. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by GoodFaith: 4:34pm On Mar 19, 2019 |
segzy14: Fix it They should be a door from kitchen to Dinning |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by temmy6996(m): 4:36pm On Mar 19, 2019 |
segzy14:Expatiate sir. 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by bumperno4: 4:40pm On Mar 19, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 5:01pm On Mar 19, 2019 |
GoodFaith: Noted |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 5:03pm On Mar 19, 2019 |
temmy6996: See Oga himself. Twuale |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 6:43pm On Mar 20, 2019 |
9.Blockwork After Foundation The blockwork is 11courses(coaches)high 68bags of cement @2500. = 170,000 Sharp Sand-1tipper. @38,000. = 38,000 3,400 nos of blocks@200naira. =680,000 Labour. 3500blocks x50naira. = 175,000 Total cost of blockwork. = N1,063,000 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:54pm On Mar 20, 2019 |
10. Lintel |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by completey(f): 3:21am On Mar 21, 2019 |
segzy14:Good job! Pictures pls? 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by joycluv: 7:03am On Mar 21, 2019 |
completey:Seconded 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:39am On Mar 21, 2019 |
completey: Please read the first write up on page one. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 12:50pm On Mar 21, 2019 |
10. Lintel Concrete 41bags of cement @2500. =102,500 6tonnes of sharp sand@3000. = 18,000 12tonnes of granite @4,500. = 54,000 Labour. = 33,000 Total. = 207,500 Reinforcement 53lengths of 12mm@2250 = 119,250 44lengths of 10mm@1600. = 70,400 1/2 roll of binding wire@8,000. = 4,000 Labour. = 23,000 Total. = 216,650 Formwork 110numbers of1x12@1,000. = 110,000 52numbers of 2x3@ 250. = 13,000 Labour. = 25,000 1bag of nail. = 7,5000 Total. = 155,500 Grand Total. =N579,650 |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by timesup234: 3:36pm On Mar 21, 2019 |
segzy14:your quotation on d very high side. 53 length of 12mm and 110 planks? Haba!!! 2 Likes |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:42pm On Mar 21, 2019 |
timesup234: Have you checked the size of the building and the number of windows,openings and doors? 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:02am On Mar 22, 2019 |
11. Headcourse |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 4:58pm On Mar 23, 2019 |
11. Headcourse Concrete 15bags of cement @2500. =37,500 2.3tonnes of sharp sand@3000. = 6,900 4.6tonnes of granite @4,500. = 20,700 Labour. = 10,000 Total. = 75,100 Reinforcement 20lengths of 12mm@2250 = 45,000 16lenghts of 10mm@1600. = 25,600 1/2 roll of binding wire@8,000. = 4,000 Labour. = 8,000 Total. = 82,600 Formwork 1x12(reuse) 2x3(reuse) Labour. = 7,500 1/2bag of nail. = 4,000 Total. = 11,500 Grand Total. = N169,200 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:24pm On Mar 23, 2019 |
segzy14: 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:23am On Mar 24, 2019 |
12. Roofing 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:25pm On Mar 24, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Muyi002(m): 4:26pm On Mar 25, 2019 |
timesup234: is this same as parapet |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by timesup234: 5:02pm On Mar 25, 2019 |
Muyi002:i think he was talking about the lintel, not parapet |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:24pm On Mar 25, 2019 |
Muyi002: It is lintel, the concrete fascia(parapet) was replaced with the headcourse. |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:56pm On Mar 25, 2019 |
12. Roofing Carcass 50x50mm(2x2)Noggings-272numbers@350. =95,200 50x75mm(2x3)Purlins-172numbers@450 = 77,400 50x100mm(2x4)Rafter-52numbers@600 = 31,200 50x100mm(2x4)Kingpost-10numbers@600 = 6,000 50x100mm(2x4)Struts- 96numbers@600 = 57,600 50x100mm(2x4)tie beam-48numbers@600 = 28,800 75x100mm(3x4)wall plate-22numbers@1000 = 22,000 7 bags of nail@8000. = 56,000 Tie rod. = 8,000 Carpenter Labour. = 90,000 Total. = N472,200 1 Like |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 6:41am On Mar 26, 2019 |
segzy14: |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Asquare84(m): 8:23am On Mar 26, 2019 |
this is not interesting because there are no pictures attached |
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Evaowokotomo(f): 9:28am On Mar 26, 2019 |
This is a demonstration sir to enlighten us, the floor plan is on page 1. He is just doing this to let us know the details and how much to build this type of house not that he is engaging on the project Asquare84: 6 Likes |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply)
Strangest Buildings In The World (photos) / Buying A House Or Building From Scratch: Which Is Cheaper? / New 10 Flats Of 2 Bedrooms Construction In Onitsha City
Viewing this topic: 1 guest(s)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 46 |